Quick answer

An ADU electrical panel is the breaker panel that distributes power to the circuits inside an accessory dwelling unit, usually a subpanel fed from the main house panel, or a main panel on its own utility service and meter.

The real question behind the term is capacity: whether the existing service to the property can carry the house plus the ADU. A load calculation under the electrical code answers that, not a rule of thumb.

Quick facts

Two set-ups
Subpanel fed from the house, or separate service and main panel
What decides an upgrade
A service load calculation of house plus ADU against the service rating
Code article
Article 220, Branch-Circuit, Feeder, and Service Load Calculations 2
California code in force
2025 California Electrical Code (Title 24, Part 3), effective 1 January 2026 1
Based on
2023 National Electrical Code (NFPA 70), with California amendments 2
Who does it
A licensed electrical contractor or electrical engineer; work is permitted and inspected

Key takeaways

  • An ADU electrical panel is the breaker box that feeds the circuits inside the unit.
  • Most ADUs get a subpanel fed from the house. Some get their own service, meter and main panel.
  • Whether the house can carry the ADU is decided by a load calculation, not a rule of thumb.
  • California uses the 2025 California Electrical Code, in force since 1 January 2026.
  • Electrical work is permitted and inspected. A licensed professional designs and installs it.

What it means, in plain English

A panel is the metal box of breakers you flip when a circuit trips. Each breaker protects one circuit, such as the kitchen outlets. The ADU needs its own panel so its circuits can be shut off and protected inside the unit.

A subpanel is a smaller panel fed by a cable from the main house panel. A service is the power line from the utility, plus its meter. The service has a rating in amps, which is the most it is built to carry.

A load calculation adds up what the house and the ADU will draw, using set code rules. It tells you if the service rating is big enough for both.

Why it matters to you

The panel itself is rarely the big cost. The big cost comes when the load calculation says the house service is too small. Then the fix can mean a larger service, a new main panel and work by the utility.

It also shapes your design choices. Heat pumps, induction cooking and EV charging all add load. Knowing your headroom early lets you plan around it, instead of finding out at plan check.

Finally, it ties to billing. If the ADU gets its own service, it gets its own meter and bill. If it shares, you pay one bill for both homes.

Subpanel or separate service

The guide below matches common situations to the route that usually follows. A load calculation by a licensed electrician decides it.

Most ADUs get power one of two ways. In the first, a feeder cable runs from the main house panel to a subpanel in the ADU. The ADU shares the house's utility service and meter, and the house panel must have room and capacity for the feeder.

In the second, the utility installs a new service with its own meter, and the ADU has its own main panel. That route is tied to the metering decision covered on the separate utility meter page.

Either way the panel itself is a modest line item. The expensive surprise is when the calculation shows the existing service to the property is too small, which can mean a bigger service, a new main panel at the house, and utility work at the pole or transformer.

Decision guide Subpanel or separate service: a first sort
If The load calculation shows the house service has room for the ADU
Then A subpanel fed from the house panel is usually the simpler route
If The calculation shows the service is too small
Then Expect a service upgrade, a new main panel, or both
If You want the tenant billed directly by the utility
Then A separate service with its own meter; ask the utility early
If The ADU is far from the house panel
Then Ask about feeder size and voltage drop before choosing

A starting point for the conversation with your electrician, not a design.

How capacity is checked

This is the sequence a licensed electrician or engineer follows. It is a description of the process, not instructions; electrical work requires a permit and a licensed professional.

  1. List the existing loads in the house: lighting and receptacles by floor area, appliances, heating and cooling, water heating, EV charging.
  2. Add the ADU's planned loads the same way.
  3. Apply the calculation method in Article 220 of the electrical code, which allows demand factors because not everything runs at once.
  4. Compare the calculated load with the rating of the existing service and main panel.
  5. If it fits, design a feeder and subpanel. If it does not, choose between a service upgrade, a separate service, or reducing planned loads.

The electrical service upgrade research explains the four inputs that drive the result.

What pushes a property toward an upgrade

Qualitative drivers. There is no square-footage or bedroom rule that decides an upgrade on its own.
FactorWhy it matters
Existing service ratingAn older, smaller service has less headroom for a second dwelling
All-electric designHeat pumps, induction cooking and electric water heating add calculated load
EV chargersA charger at the house or the ADU is a large continuous load
Planned solar and batteriesCan affect panel bus ratings and the interconnection design
Distance to the ADULong feeders need larger conductors, which affects cost, not capacity

California context

California adopts the National Electrical Code as the California Electrical Code, Part 3 of Title 24. The 2025 edition took effect on 1 January 2026, and the State Fire Marshal's adoption documents list Article 220 among the adopted articles and name the 2023 NEC as the base code 1 2.

State ADU law does not set electrical capacity. It does say an ADU follows the local building code for detached dwellings and does not by itself trigger a Group R occupancy change, unless the building official makes a written finding of a specific adverse health and safety impact (Gov. Code § 66314(d)(8)) 3.

Utility-side work, such as a new service drop, is governed by the utility's own tariff rules 4.

Safety and risk

Panel and service work is high-voltage and needs a permit and inspection. Hire a licensed electrical contractor; never open a panel or touch the service drop yourself.

Sources: [1] [2] [3]

Rules of thumb that do not hold

Myth "Every ADU needs a 100-amp subpanel."
Reality Panel and feeder size come from the calculated load of the specific design, not a fixed number.
Myth "A 200-amp house can always add an ADU."
Reality It depends on what the house and the ADU already draw. The calculation decides.
Myth "A separate meter avoids the load question."
Reality A separate service moves the question to the utility's capacity and design rules; it does not remove it.

Subpanel and separate service compared

A general comparison. No prices are given, because they depend on the site and the utility.
Subpanel from the houseSeparate service and main panel
Power comes fromThe main house panel, through a feederThe utility, through a new service
MeterShared with the houseIts own meter
Capacity limitThe house service ratingThe new service the utility designs
Who is involvedElectrician and building departmentElectrician, building department and utility
BillingOne billSeparate bills

Where you will see it

  • The electrical plan. Part of the permit set. It shows the panel, feeder and circuits.
  • The load calculation sheet. Many building departments ask for it with the plans.
  • A contractor bid. Look for the panel, feeder, trenching and any service upgrade as line items.
  • A utility work order. If the service changes, the utility has its own steps. In PG&E territory, service extensions follow Electric Rule 16 4.
  • Inspection records. The building inspector signs off the work before it is covered or used.

Benefits and limits of each route

A subpanel from the house

  • Often the simplest route when the house has headroom
  • No new meter or utility account
  • Fewer parties to coordinate

Where it falls short

  • Uses up the house's spare capacity
  • Can trigger a service upgrade if the load is too high
  • One bill makes tenant billing harder

What to ask your electrician or designer

  • Have you done a load calculation for the house plus the ADU?
  • What is the rating of my existing service and main panel?
  • Does the plan fit without a service upgrade? If not, what are the options?
  • Would a separate service be simpler than an upgrade at the house?
  • How do planned heat pumps, EV chargers or solar change the result?
  • Are you licensed for this work, and who pulls the permit?

Checklist for your project

Planning steps for owners. None of these is electrical work; a licensed professional does that.

  1. Find the rating printed on your main panel or ask your electrician to confirm it.
  2. List the big appliances you plan for the ADU.
  3. Ask for a load calculation before the design is final.
  4. Decide between a subpanel and a separate service.
  5. If the utility is involved, contact it early.
  6. Check the state license of any contractor you hire.
  7. Keep the permit and final inspection records.

Outside California

Most states adopt an edition of the NEC, but which edition and which amendments vary, and local utilities set their own service rules. Ask the local building department which edition applies.

Plan the budget

Questions about adu electrical panel

Does an ADU need its own electrical panel?

It needs a panel to distribute its circuits, usually a subpanel fed from the main house. A separate main panel is used when the ADU gets its own utility service and meter.

Will my ADU require an electrical service upgrade?

Only a load calculation can say. A licensed electrician or engineer adds the ADU's loads to the house's, applies the electrical code's Article 220 method, and compares the result with the existing service rating.

Which electrical code applies to ADUs in California?

The 2025 California Electrical Code, Title 24 Part 3, effective 1 January 2026, based on the 2023 National Electrical Code with California amendments.

Can I install an ADU subpanel myself?

This page does not give installation instructions. Electrical work for an ADU is permitted and inspected, and should be designed and installed by a licensed electrical professional.

What is the difference between a subpanel and a main panel?

A main panel takes power straight from the utility service and has the main shutoff. A subpanel is fed from a main panel and splits that power into more circuits. Most ADUs use a subpanel fed from the house.

How do I know if my house can handle an ADU?

A licensed electrician or engineer runs a load calculation. It adds the house and ADU loads under Article 220 of the electrical code and compares the total with your service rating.

Does an all-electric ADU need a bigger panel?

It may. Heat pumps, induction cooking and electric water heating add calculated load. Whether the panel or service must grow depends on the load calculation for your design.

Does an ADU panel need a permit?

Yes. Electrical work for an ADU is part of the building permit, and the work is inspected before it is approved for use.

Does the utility need to be involved in an ADU panel?

Only if the service changes, such as a larger service or a new meter. Then the utility's filed rules apply, such as PG&E Electric Rule 16 for service extensions.

Does a junior ADU need its own electric meter?

Not in PG&E territory. PG&E Electric Rule 18 says junior ADUs are not considered residential dwelling units and are not required to be separately metered. Other utilities file their own rules, so ask yours.

Sources

  1. California Building Standards Commission, California Building Standards Code (Title 24), retrieved .
  2. California Building Standards Commission, SFM 01/23 Final Express Terms, Part 3 (California Electrical Code), 2024 triennial cycle, retrieved .
  3. California Legislative Information, Gov. Code § 66314, retrieved .
  4. PG&E, Electric Rule No. 16, Service Extensions, retrieved .
  5. PG&E, Electric Rule No. 18, Supply to Separate Premises and Submetering of Electric Energy, retrieved .

Expert review

Written by the HyreADU Research team. Not yet reviewed by an outside expert. We say so rather than imply a review that has not happened; see our editorial policy.

How the numbers were checked: The code edition and Article 220 adoption were read in BSC documents on 7 October 2026; § 66314 on leginfo; PG&E Rule 16 from the filed tariff PDF. No electrical values are given. Held for licensed review (G-REV).

Suggest a correction. We fix errors and say what changed.