Quick answer
A separate utility meter is a meter the utility installs and reads for the accessory dwelling unit alone, so the ADU's electricity, gas or water is billed on its own account instead of through the main house's meter.
The alternatives are a shared meter, where the owner pays one bill for both units, or a private submeter that measures the ADU's share. The choice drives tenant billing and part of the connection cost.
Quick facts
- Three options
- Separate utility meter, shared meter, owner-installed submeter
- California: 66323(a)(1) ADU
- A separate connection to the utility cannot be required by a local agency, special district or water corporation 1
- California: other ADUs
- A separate connection may be required, with a fee proportionate to the ADU's size or plumbing fixtures 1
- PG&E residential rule
- Furnishes and meters electricity to each individual residential dwelling unit, with listed exceptions 3
- Junior ADU
- Not a separate dwelling unit for water, sewer or power; PG&E does not require a separate meter 23
- Renting with a shared meter (California)
- The landlord must disclose it and agree in writing with the tenant on payment 4
- Who decides
- The utility for its meter; the water or sewer agency for theirs
Key takeaways
- A separate meter means the utility bills the ADU on its own account.
- A shared meter means one bill for the house and the ADU together.
- A submeter is your own meter, behind the utility's, that measures the ADU's share.
- In California, cities and water agencies cannot demand a separate connection for some ADUs built inside an existing home or structure 1.
- Electric utilities follow their own filed rules. PG&E's rule meters each dwelling unit, with exceptions 3.
- If you rent with a shared gas or power meter, California law says you must tell the tenant and agree in writing 4.
- Ask the utility early. Its answer can change your electrical design and budget.
What a separate meter means, in plain English
A meter is the box that counts how much power, gas or water you use. The utility reads it and sends a bill.
With a separate meter, the ADU gets its own box and its own bill. The person living there can open their own account.
With a shared meter, the main house and the ADU use one box. You get one bill and work out the split yourself.
A submeter sits further down the line, on your side of the utility meter. The diagram traces that path for power, from the street to the ADU.
- Utility service lineOwned by the utility; one line serves the lot
- Utility meterThe only meter the utility reads and bills
- Main panelThe house panel, on your side of the meter
- SubmeterYour own meter on the feed to the ADU; it measures the ADU's share
- ADU subpanelBreakers for the ADU's circuits
A typical arrangement, top to bottom from the street. With a separate utility meter, the ADU instead gets its own utility meter and account. Your utility and electrician set the actual layout.
Why it matters to you
The meter choice shapes three things: how much the hookup costs, how you bill a tenant, and whether your house service can carry the extra load.
A separate meter often means a new service line, new equipment and digging. A shared meter avoids that, but may push your existing panel to its limit. The ADU electrical panel page explains that load question.
It also matters for renting. A shared meter means you must agree with the tenant on the split. A separate meter makes that simple.
Separate, shared or submetered
| Separate utility meter | Shared meter | Submeter | |
|---|---|---|---|
| Who owns the meter | The utility | The utility (one meter for both units) | The property owner, behind the utility meter |
| Who gets the bill | The ADU occupant or owner, directly | The owner, for both units | The owner; the ADU share is worked out from the submeter |
| Tenant billing | Simple: tenant opens own account | Usually built into rent, with a written agreement | Owner bills tenant; limits apply where the utility's tariff restricts resale |
| Upfront cost | Highest: new service, meter and often trenching | Lowest | Moderate: submeter hardware and installation |
| Capacity question | Moves to the utility's service design | Stays with the house service | Stays with the house service |
How getting a separate meter works
Each utility has its own process. These are the usual stages.
- Your designer or electrician works out the ADU's electrical load.
- You apply to the utility for new service, with a site plan and load details.
- The utility decides where the service will come from and what it needs from you.
- Your contractor does the site work, such as trenching and conduit, to the utility's specs.
- The city inspects the electrical work under your building permit.
- The utility sets the meter and opens an account.
Water and sewer are separate requests to the water or sewer agency, under their own rules.
Two California rules that point different ways
State law limits who may demand a separate connection. Under Gov. Code § 66311.5(d), for an ADU or JADU created within an existing or proposed single-family home or accessory structure under § 66323(a)(1), a local agency, special district or water corporation may not require a new or separate utility connection directly between the unit and the utility.
It also may not charge a related connection fee or capacity charge. The exceptions are a unit built with a new single-family home, or one conveyed (sold) separately 1.
The section was numbered 66324 until SB 543 (Stats. 2025, ch. 520) renumbered it from 1 January 2026.
For other ADUs, such as many new detached units, § 66311.5(e) lets them require one.
Any connection fee or capacity charge must be proportionate to the ADU's burden on the system, based on its square feet or its drainage fixture units (a plumbing measure of how much wastewater fixtures send), and must not exceed the reasonable cost of the service 1.
Electric utilities are regulated by the CPUC (California Public Utilities Commission) through filed tariffs, which are their official rulebooks.
PG&E's Electric Rule 18, section C.1, says PG&E "will furnish and meter electricity to each individual residential dwelling unit", with listed exceptions 3.
The same rule says junior ADUs are not residential dwelling units for this purpose and need not be metered separately, citing Gov. Code § 66338 2.
How these interact on your ADU, and whether your utility will serve it through the house meter, is decided by the utility and the permitting agency. Ask both before the electrical design is fixed. The utility connection research records the conflict as found.
California: what each ADU type usually faces
| ADU type | Water or sewer agency may require a separate connection? | PG&E electric meter |
|---|---|---|
| Junior ADU | No: not a separate unit for utilities (§ 66338) | Separate meter not required (Rule 18) |
| ADU inside an existing home or accessory structure under § 66323(a)(1) | No, unless built with a new home or sold separately (§ 66311.5(d)) | Ask PG&E; Rule 18 meters each dwelling unit, with exceptions |
| New detached ADU and other ADUs | May be required, with a proportionate fee (§ 66311.5(e)) | Ask PG&E; Rule 18 meters each dwelling unit, with exceptions |
Worked example: splitting a shared bill
A hypothetical shared electric bill, split three ways. The dollar amounts and usage are made up for arithmetic only. They are not typical bills.
| Method | How it works | Hypothetical bill: 300 for both units | ADU share |
|---|---|---|---|
| Flat amount | Tenant pays a set sum each month | Fixed at 90 in the lease | 90 |
| By floor area | Share by square feet | ADU 600 sq ft, house 1,400 sq ft (30%) | 300 × 0.30 = 90 |
| By submeter reading | Share by measured use | Submeter shows ADU used 25% of the total | 300 × 0.25 = 75 |
In California, whichever method you pick, you must disclose the shared meter to the tenant and put the payment deal in writing 4. With a submeter, the rate you charge matters too; see the rules section.
Where you will see meter terms
- The utility's service application: new service, load and meter location.
- The electrical sheet of your permit set: service size, meter and panel layout.
- A builder's bid: a line for trenching, conduit or "utility coordination."
- A city or water agency letter: whether a separate connection and fee apply.
- The lease: who pays which utility, and the shared-meter agreement.
Rules: California first, then other places
Renting with a shared meter has its own California rule. If a tenant's gas or power meter also serves an area outside their unit, the landlord must disclose it before the tenancy starts, or once found.
The landlord must then agree in writing on who pays, or make another written arrangement, such as becoming the customer of record 4. A tenant can go to court if this is not done.
Submetering has limits too. California's Public Utilities Code § 739.5 says that when a master-meter customer supplies gas or power to tenants in an apartment building or similar residential complex, it must charge each tenant the same rate the utility would charge directly 5.
Whether that applies to a house with one ADU is a question for the utility or a lawyer. PG&E Rule 18 also limits reselling power to listed cases 3.
Outside California, each state's utility commission and each utility sets its own rules. See the ADU laws by state tracker and ask your utility.
Costs and what drives them
HyreADU does not give a price for a separate meter. Prices depend on the utility's tariff, your site and the contractor's bid, and we have no sourced dataset for them.
The main cost drivers are the distance from the utility's line to the meter, whether trenching crosses hard surfaces, whether the line runs overhead or underground, the size of the new service, and any utility fees.
For water and sewer, the agency's connection or capacity charge can add to it, within the § 66311.5 limits 1.
For overall budgets, see ADU utility connection statistics and the ADU cost calculator.
A decision rule for owners
Once the utility has said what it will allow, these questions usually settle it.
- Renting long term? A separate meter lets the tenant carry the bill and avoids disputes over a split.
- Housing family, or a JADU? A shared meter is usually simplest and cheapest.
- House service already near capacity? A separate service may be the alternative to upgrading the house service; compare both.
- Planning to sell the ADU separately later? Separate conveyance is a trigger in § 66311.5(d), so plan for separate services.
- Thinking of a submeter to bill the tenant? Read the utility's resale and submetering rules first; PG&E Rule 18 restricts resale to listed cases.
Benefits and limits of a separate meter
A separate meter offers
- The tenant pays the utility directly.
- No shared-bill disputes or written split needed.
- Your house panel carries no ADU load.
- Easier if the ADU is ever sold on its own.
A separate meter also means
- Higher upfront cost and more site work.
- More time waiting on the utility.
- A second set of fixed monthly charges, where the utility has them.
- Water or sewer fees may apply for some ADUs 1.
Common mistakes and myths
- Myth "State law says my ADU never needs a separate meter."
- Reality The § 66311.5(d) limit covers some ADUs inside an existing home or structure, and binds local agencies and water companies. Electric metering follows the utility's tariff 1 3.
- Myth "A submeter lets me charge the tenant any rate."
- Reality Utility tariffs and California law limit reselling power; for some properties the rate must match the utility's 5 3.
- Myth "A shared meter needs no paperwork."
- Reality If you rent the unit, California requires disclosure and a written payment agreement 4.
- Myth "I can decide the meter after the design is done."
- Reality The utility's answer can change the panel, the trench and the budget. Ask first.
What to ask the utility and the city
- Electric utility: does my ADU type need its own meter under your rules?
- Electric utility: where would the new service come from, and what site work is mine?
- Electric utility: may I submeter the ADU and bill a tenant, and at what rate?
- Water and sewer agency: will you require a separate connection, and what fee applies under § 66311.5?
- City: does my approval path fall under § 66323(a)(1)?
- Both: how long does a new service usually take right now?
Checklist for your project
- Confirm your ADU type and approval path.
- Get a load calculation for the ADU and the house together.
- Ask the utility in writing what it requires for your ADU.
- Ask the water and sewer agency the same.
- Compare the cost of a separate service with a house panel upgrade.
- Pick separate, shared or submetered, and design to it.
- If you will rent, write the utility terms into the lease, with the shared-meter disclosure if needed.
Where the meter decision sits
- utility connection route
- shared or separate service
- ADU panel design
- meter set by the utility
- tenant or owner account
Outside California and outside PG&E territory
Each utility files its own metering rules, and other California utilities may differ from PG&E. Outside California, state utility commissions and local water agencies set the terms. Check with your own utility and local rules.
Related guides
- Renting an ADU
- ADU construction hub
- ADU ROI calculatorHow utility billing affects net rent
- Feasibility checker
Questions about separate utility meter
Does an ADU need a separate electric meter?
It depends on the utility and the ADU type. California law bars water, sewer and local agencies from requiring a separate connection for some ADUs created inside an existing home or accessory structure. Electric metering follows the utility's filed tariff, so ask the utility early.
Can an ADU share a meter with the main house?
Often, especially for attached units, conversions and junior ADUs. PG&E's Rule 18 says JADUs do not need a separate meter. Whether a detached ADU can share depends on the utility, and the house service must have room for the extra load.
What is the difference between a submeter and a separate meter?
A separate meter belongs to the utility, which bills the ADU directly. A submeter is owner-installed behind the utility meter to measure the ADU's share. Utilities and California law restrict how you resell power through a submeter.
Who pays for a separate ADU meter?
Usually the property owner, through the utility's service and meter charges plus the site work. Amounts come from the utility's tariff and the contractor's bid. HyreADU does not publish a typical price because we have no sourced dataset for it.
Can a city require a separate water meter for my ADU?
For some ADUs, no. Gov. Code § 66311.5(d) bars it for an ADU or JADU created inside an existing or proposed home or structure under § 66323(a)(1), unless built with a new home or sold separately. For other ADUs it may be required, with a proportionate fee.
How do I split a shared utility bill with an ADU tenant?
Common methods are a flat monthly amount, a split by floor area, or a split by submeter reading. In California, if you rent with a shared gas or power meter, you must disclose it and agree with the tenant in writing on how it is paid.
Can I charge my ADU tenant for electricity through a submeter?
Maybe, within limits. PG&E Rule 18 restricts reselling electricity to listed cases. California's Public Utilities Code § 739.5 requires master-meter customers in some residential complexes to charge tenants the utility's own rate. Ask your utility before you set it up.
Does a junior ADU need its own meter?
No, in most cases. Gov. Code § 66338 says a junior ADU is not a separate dwelling unit for water, sewer or power service. PG&E's Rule 18 says it does not need separate metering. Other utilities have their own rules.
Should I get a separate meter if I plan to rent my ADU?
It often makes sense. The tenant can pay the utility directly and you avoid a shared-bill agreement. Weigh it against the upfront cost and site work, and against a house panel upgrade if the shared service is near capacity.
How long does it take to get a separate meter?
It varies by utility and workload, and HyreADU has no sourced figure. Apply early, in the design stage, and ask the utility for its current timeline in writing. Waiting on the utility can hold up your final sign-off.
Sources
- California Legislative Information, Gov. Code § 66311.5, retrieved .
- California Legislative Information, Gov. Code § 66338, retrieved .
- PG&E, Electric Rule No. 18, Supply to Separate Premises and Submetering of Electric Energy, retrieved .
- California Legislative Information, Civil Code § 1940.9, retrieved .
- California Legislative Information, Public Utilities Code § 739.5, retrieved .
Expert review
Written by the HyreADU Research team. Not yet reviewed by an outside expert. We say so rather than imply a review that has not happened; see our editorial policy.
How the numbers were checked: Gov. Code §§ 66311.5 and 66338 read on leginfo on 7–8 October 2026; Civil Code § 1940.9 and Public Utilities Code § 739.5 read on leginfo on 8 October 2026; PG&E Electric Rule 18 read from the filed tariff PDF on 7 October 2026.
Bill figures in the example are hypothetical. No costs or timelines given. Education, not legal advice.
Suggest a correction. We fix errors and say what changed.