Detached ADU
A separate structure in the rear yard. The most flexible, and the one California legislated a by-right path for.
ADU companies · independent publisher
Check a builder's license and permit record, compare itemized bids, and know the rules before you sign. We publish the evidence on 735 California ADU companies, and we do not sell rankings.
Independent publisher. We do not design, permit or build ADUs, and no company pays to appear here.
Evidence, not ads. License status and permit records, each with its source and retrieval date.
Your numbers. Twelve calculators ask for your figures instead of shipping a national price.
Your details stay yours. Nothing goes to a contractor unless you agree. Submitting is not a contract.
How it works
Types, size limits, permits and fees for your lot, in plain language with the statute cited.
Start with planningConfirm a builder's license class and status, and whether their name appears on ADU permits.
See the builder recordPut two or three itemized bids side by side, line by line, before you sign anything.
Open the bid comparisonHow we check ADU companies
California has no ADU license, so the useful checks are the B general building license, whether it is active today, and whether the company is named on real ADU permits. We publish what those checks show, with the date we ran them.
A license check is a snapshot, not a quality grade. Read how we intend to vet and why we do not publish "best builder" lists.
Before you sign
Read these off your phone while the bid is on the table. A company that cannot show you all six is not ready for your project.
Compare your bidsADU types
Six ways to add a second unit. Which is open to you depends on your lot, your existing structures and your jurisdiction, not on which is cheapest.
A separate structure in the rear yard. The most flexible, and the one California legislated a by-right path for.
Reuses a slab and three walls. Roughly half of all Los Angeles ADU permits — and the slab decides whether it is cheap.
A second story over existing parking. Buys floor area without spending yard, and asks the most of the structure below.
Shares a wall with the house and has its own entrance. Shorter utility runs; less separation.
Carved from the existing envelope. Often cheapest — until egress and ceiling height are priced.
Built in a factory, set on a prepared foundation. Compresses the build; not the site work.
Costs
We do not publish a national ADU price, because one would be wrong for your project by a margin large enough to matter.
Cost is driven by size, type, site conditions, foundation, utility connections, finish level and your jurisdiction's fees. We publish the structure of the cost, the evidence we hold, and calculators that ask for your figures.
Cities
Five California jurisdictions publish permit records detailed enough to show who builds ADUs there and how long approval takes. Every figure links to its source.
Counts are named-contractor records from permit extracts harvested 29–30 August 2026; a firm named in two cities is counted in both.
Free tools
Research
Original research on California statutes, ordinances and permit records, with the section, the geography and the retrieval date attached. Where a dataset is not public, we record the gap.
The ADU guide
Plan your project
Three short steps: the ADU you want, your home, and how to reach you. Nothing goes to a contractor unless you agree.
A straight answer first. Our ADU professional matching is still being built, so this is not a quote service, and we cannot tell you whether your lot qualifies.
We can help you work out which questions to ask and what a thorough proposal should contain. Your planning department decides what is permitted at your address.
Get ADU Options
Tell us about the ADU you are planning and where you are. We will follow up about connecting you with contractors serving your area.
Questions
We read your project type, zip code and notes, then follow up about next steps. Contractor matching is still being built, so this is not a quote marketplace and we cannot say whether your lot qualifies. Your details are not sold, and no builder receives them unless you agree.
No. Submitting the form is free and does not commit you to a builder, a design or a start date. You decide whether to talk to anyone and whether to hire.
An accessory dwelling unit is a self-contained home on the same lot as a primary house, usually with its own kitchen, bathroom, sleeping area and entrance. It is smaller than the main house and is a legal dwelling, not a room. Local definitions of what counts as a dwelling decide which rules apply.
There is no universal figure, and we do not publish one: the same building can cost very different amounts in two jurisdictions. The total is driven by size and wet rooms, construction method, site work and foundation, utilities, design, permits and fees, finishes and location. Get those lines itemized for your project.
Nobody can answer that from a web page, including us. It depends on your parcel's zoning, lot size, setbacks, coverage, height, parking and utility capacity. A preliminary conversation with your local planning department is the fastest real answer, and it is free. Be wary of any site that says you qualify without your address.
Yes, in essentially every jurisdiction. An ADU is a new dwelling, so it needs a building permit and usually planning or zoning review, utility approvals and inspections. Many places add design review and fees for permits, impact, utility connection, and sometimes schools or parks. Confirm the current requirements locally before committing.
The common forms are detached units, attached units, garage conversions, basement conversions, units above a garage, and prefab or modular units. Which are allowed, and at what size, is a local question: some jurisdictions allow all of them, some allow conversions but not new detached structures, and the conditions differ.
We do not publish a timeline, because it depends on your jurisdiction's planning and permit review, any design review, utility scheduling and the construction method. Prefab shortens building time but not review. Permitting is often the longest phase, the one you control least, and it starts after design is done.
Often, but the conditions are local. Some places allow long-term rental while restricting short-term rental, some require the owner to live on the property, and some have changed their rules recently. If rent matters to your plan, confirm the rules before you design, and treat projected rent as an assumption to test.
Where it is permitted, a garage conversion is often the cheapest route, because the structure already exists. The work is what a garage was never built for: insulation, floor level and moisture, ceiling height, egress, fire separation, water and drainage. You also give up the parking, and any parking requirement tied to it.
Modular usually means three-dimensional sections built in a factory to the same code as site-built homes, then craned onto a foundation. Prefab is broader: panelized walls, kits or flat-packed designs. Either way, the site work, foundation, utilities, delivery access, permits and connections remain a conventional construction job on your lot.
Look for completed ADUs and permitting experience in your jurisdiction. Ask for an itemized estimate with allowances, a scope that lists exclusions, insurance certificates you can verify, payments tied to milestones and a written change-order process. Then call references with finished, occupied units and ask what went wrong.
More in the full FAQ, or read who we are and why this exists.
Contact
Write to us with a question about ADUs, a page on this site, or the details you sent us.
We can explain how this site works and what any step of the planning sequence means. We are not a builder or a designer, and we cannot say whether an ADU is permitted on your property. Your local planning department decides that.