ADU permit checklist: is your submittal complete?

Nine documents most ADU permit applications need. Mark each one ready, not ready, or not required for your project.

The ADU permit checklist marks which documents are ready: site plan, floor plans and elevations, structural drawings, energy compliance forms, utility plan, survey, soils report, fire access answer and authorization.

It lists what is missing. In California the 60-day decision clock runs from a complete application, so a complete first set is the fastest permit (Gov. Code § 66317).

Your submittal

Mark each item. Nothing is sent anywhere.

— Ready
— Missing
— The clock

What this assumed —

A generic list. Your city’s submittal checklist governs.

How this calculator works

Ready count = items marked Ready ÷ items not marked Not required. Items marked Not ready are listed by name.

What each input means

Inputs on this tool, in the order they appear on the form.
InputWhat it is actually asking
Site plan Shows the lot, buildings, setbacks, easements and utility routes.
Energy forms In California, Title 24, Part 6 compliance documents.
Soils report Required by some cities or sites. See soils report.
Fire Access or sprinkler questions. See fire sprinkler requirement.

Worked examples

Including one where the naive answer misleads, which is the example most calculators leave out.

A set missing energy forms

Mark energy forms Not ready. The tool lists them, and reminds you the 60-day clock will not start until the set is complete.

A conversion with no new foundation

Mark soils report Not required if your city agrees. The ready count excludes it.

What changes the result

Each missing item can add a correction round. See plan check delays.

Local considerations

Download your city’s own ADU submittal checklist and check it against this list; it may ask for more.

When not to use this

Do not treat a full score as a complete application. Only the city decides completeness, and since January 1, 2026, California requires it to answer in writing within 15 business days.

Questions this calculator answers

What documents do I need for an ADU permit?
Usually the nine above, plus anything your city lists.
How long does the city have to say my set is complete?
In California, 15 business days for a written determination (Gov. Code § 66317).
Do pre-approved plans skip documents?
They cover the building design; the site documents are still needed.
Who prepares these documents?
Your designer, engineer, energy consultant and surveyor.

Sources and methodology

Figures dated 27 October 2026. Last reviewed .