HyreADU

Awaiting expert review. This page covers rules that vary by state and local jurisdiction. It is kept out of search results until a qualified reviewer has checked it; the sources below are dated so you can verify each point.

Quick answer

ADU permit fees are the charges a city, county or utility district collects before and during the building of an accessory dwelling unit: plan review, the building permit, inspections, and in many places impact fees, school fees and utility connection charges.

Each agency sets its own amounts. In California, state law decides which of them an ADU can be charged at all, and the size of the unit is the switch.

Quick facts

Who charges them
The city or county building and planning departments, school districts, special districts and water or sewer providers
California impact-fee rule
No impact fee on an ADU of 750 sq ft of interior livable space or less, or a JADU of 500 sq ft or less (Gov. Code § 66311.5(c)(1)) 1
Above 750 sq ft
Impact fees charged in proportion to the square footage of the main home 1
Formerly
Gov. Code § 66324, and before that § 65852.2(f)
Not covered by the exemption
Plan review, permit and inspection fees; connection fees and capacity charges 1
Fee schedule online
California cities, counties and special districts with a website must post a current fee schedule (Gov. Code § 65940.1) 4
Paid when
Plan check at submittal; the rest at permit issuance; school fees at the district office 2

Key takeaways

  • Permit fees are not one bill. They are five or more charges from different offices.
  • In California, an ADU of 750 square feet of interior living space or less pays no impact fees 1.
  • Small ADUs still pay plan review, permit and inspection fees. The size rule does not touch those.
  • Above 750 square feet, impact fees may apply, scaled to the size of your main home 1.
  • On Sacramento’s own 2026 sheet, one extra square foot roughly doubles the total 2.
  • School and utility charges follow their own rules. Ask those offices directly.

What ADU permit fees mean, in plain English

Before you build, the city has to check your plans. Then an inspector visits during the work. Permit fees pay for that staff time.

Many places also charge impact fees. An impact fee is money for public things a new home is said to use, like parks, roads or flood control. It is not for checking your plans.

Other offices may charge you too. The school district may collect a school fee. The water and sewer provider may charge to hook up the new unit.

So “permit fees” is a family of charges. Some come from the city. Some come from other agencies that serve your lot.

Why permit fees matter to you

Fees are cash you pay before a single wall goes up. Most loans and bids do not cover them unless you ask.

They can also shape the design. In California the 750 square foot line can switch impact fees on or off. A small change in size can move your bill by thousands of dollars on some city sheets.

Fees are part of your soft costs, the costs that are not labor or materials. Leave them out and your budget will be short.

How ADU permit fees work, step by step

The order varies by city. This is the common pattern.

  1. You submit plans. The city often charges a plan review (plan check) fee at this point.
  2. Staff check the plans. They compare them with the building code and zoning. Extra review rounds may cost more in some cities.
  3. The city prices the permit. Many cities use a valuation: square feet times a city rate. Fees are then a share of that number.
  4. Other agencies add their charges. The school district, sewer and water providers and special districts each bill on their own.
  5. You pay and the permit is issued. Most remaining city fees, including any impact fees, are due here.
  6. Inspections follow. These are usually covered by the permit fee. A failed inspection may bring a re-inspection fee in some cities.

Your city may add steps of its own, such as a separate planning review.

The five kinds of fee on an ADU permit

Names differ by city. Sacramento’s worksheet lists more than twenty lines, from a fire inspection fee to a technology fee [sac].
FeeWhat it pays forHow it is usually set
Plan review (plan check)Staff time checking the drawings against the building code and zoningA share of the permit fee, a valuation table or an hourly rate
Building permit and inspectionField inspections and permit processingProject valuation (square feet × a city rate) or a flat amount by size
Impact feesNew parks, roads, flood control or other public facilities the new home is said to burdenA per-unit or per-square-foot charge in the city’s fee resolution
School feesSchool facilities, collected by the school districtA per-square-foot rate on new residential space
Utility connection and capacity chargesHooking up to, and buying capacity in, water and sewer systemsSet by the utility; separate rules apply to ADUs

California’s rule: the 750 square foot line

Fee rules vary by state; outside California, check the state and local law (our ADU laws by state table tracks them).

In California, the rule sits in Government Code § 66311.5, which took that number on 1 January 2026 when SB 543 (Stats. 2025, ch. 520) renumbered former § 66324. Before 25 March 2024 the same rule was in § 65852.2.

Subdivision (c)(1) says a local agency, special district or water corporation “shall not impose any impact fee” on an ADU with 750 square feet of interior livable space or less, or a junior ADU with 500 square feet or less.

An ADU larger than 750 square feet can be charged impact fees, but only “proportionately in relation to the square footage of the primary dwelling unit.”

The exemption covers impact fees only. Subdivision (c)(2) defines an impact fee by reference to Gov. Code § 66000(b), adds park fees under § 66477, and excludes connection fees and capacity charges.

Section 66000(b) itself leaves out “fees for processing applications” 3, so plan review, permit and inspection fees fall outside the exemption and a small ADU still pays them.

Utility charges follow their own rule. An ADU is not a “new residential use” for connection fees unless it is built with a new single-family home (§ 66311.5(b)).

For an ADU inside an existing house or accessory structure under § 66323(a)(1), the utility may not require a separate connection or charge for one (subdivision (d)).

For other ADUs it may require a new connection, with a fee proportionate to the unit’s burden by square feet or drainage fixture units (subdivision (e)). See utility connection requirements.

Decision guide Which California fee rule applies to your unit?
If A junior ADU of 500 sq ft or less
Then No impact fee (§ 66311.5(c)(1)).
If An ADU of 750 sq ft of interior livable space or less
Then No impact fee (§ 66311.5(c)(1)). Plan check and permit fees still apply.
If An ADU larger than 750 sq ft
Then Impact fees may apply, in proportion to the main home’s square footage.
If An ADU inside the existing house or an accessory structure (§ 66323(a)(1))
Then The utility may not require a new connection or charge a connection fee (§ 66311.5(d)).
If Any other ADU that needs a new utility connection
Then A connection fee proportionate to the unit’s burden may apply (§ 66311.5(e)).

California only; school fees follow Education Code § 17620 separately. Your city and each utility apply these rules. Source: [1]

Safety and risk

The 750 sq ft line counts interior livable space, not the gross area on a fee worksheet. One extra square foot can switch on every impact fee, so confirm how the city measures before you finalize the plans.

Sources: [1]

School fees and utility hookups, in plain words

California school districts can charge a fee on new homes under Education Code § 17620 5. For other residential work, that section allows the fee only when the added assessable space is more than 500 square feet.

State ADU law plugs into that line. It treats an ADU or junior ADU under 500 square feet of interior livable space as work that does not add 500 square feet 1. So a very small unit is often outside the school fee. Ask the district how it applies this to your plans.

Water and sewer work differently again. For a conversion inside your existing house or an existing accessory building, the provider may not require a separate hookup or charge you for one. For a new detached unit, it may require one, with a charge scaled to the unit’s size or plumbing load 1.

Sources: [5] [1]

Rules outside California

California is unusual. It has a state law that bans impact fees on small ADUs. Most states leave fees to cities and counties.

Outside California, expect your local fee schedule to apply in full unless your state says otherwise. Some states have passed their own ADU laws in recent years. Check the state-by-state ADU law table, then your city’s fee page.

The same five fee types show up almost everywhere. The names, the amounts and the order you pay them change.

One city’s fee sheet: Sacramento, 749 vs 750 vs 1,200 sq ft

The City of Sacramento publishes an ADU fee estimate for new construction (form CDD-0419, revised 12 July 2026) with three columns. These are the city’s own figures for its own fees, not a California average 2.

Line749 sq ft750 sq ft1,200 sq ft
Project valuation (sq ft × $170.80)$127,929.20$128,100.00$204,960.00
Building permit + plan review$1,799.93$1,801.57$2,542.31
Park development impact fee—$2,617.50$4,188.00
Flood control (SAFCA) impact fee—$1,575.00$2,520.00
Transportation (STA) mitigation fee—$1,154.64$1,415.76
Total on the sheet (approx.)$5,271.90$10,624.40$14,842.50

One extra square foot roughly doubles the bill on this sheet, because the three impact fees switch on.

The sheet excludes school fees (paid at the district), sewer and regional sanitation fees, and special district fees.

Note that the statute measures interior livable space, while the worksheet labels its column by square footage; if your plans show exactly 750 square feet of interior livable space, ask the city how it measures before paying an impact fee.

Building-permit and plan-review subtotals are HyreADU’s addition of the sheet’s two lines.

How “proportionate” works above 750 sq ft

A hypothetical, for arithmetic only. Suppose a city’s park impact fee is a hypothetical $10,000 for a new single-family home, and you build a 1,000 sq ft ADU behind a 2,000 sq ft house. The formula shows one common way cities apply the rule.

StepMathResult
Ratio of ADU to main home1,000 ÷ 2,00050%
Proportionate fee$10,000 × 50%$5,000
Same ADU behind a 4,000 sq ft house$10,000 × 25%$2,500
Formula One common way to prorate an ADU impact fee (example method)

ADU impact fee = full single-family fee × (ADU sq ft ÷ main home sq ft)

Full single-family fee
What the city’s fee resolution charges a new single-family home
ADU sq ft
The ADU’s interior livable space (the rule only applies above 750 sq ft)
Main home sq ft
The square footage of the primary dwelling on the lot

The statute requires proportionality to the main home but prints no formula. Your city’s fee resolution decides the method.

Source: [1]

The statute ties the charge to the main home’s square footage but does not print a formula. The ratio above is one way cities apply it; your city’s fee resolution decides. Sacramento’s 1,200 sq ft column, for example, uses its own schedule.

Where you will see these fees

  • The city fee schedule. In California, a city, county or special district with a website must post its current fee schedule there 4.
  • A fee estimate worksheet. Some cities, like Sacramento, publish one for ADUs 2.
  • The plan check invoice when you submit drawings.
  • The permit invoice when the permit is ready to issue.
  • A school district receipt. The city may ask for it before it issues the permit.
  • A utility letter or invoice for any new water or sewer connection.
  • Your contractor’s bid, often as an allowance or an exclusion. Read that line closely.

What drives the size of your fee bill

No two cities price the same way. These are the things that move the total.

  • Interior livable space. In California, 750 square feet is the impact-fee switch 1.
  • The project valuation. Cities that price permits by valuation charge more as square feet rise. See why permit valuations are not build prices.
  • The ADU type. A conversion inside an existing building is treated more gently on utility hookups than a new detached unit 1.
  • The size of your main home, because fees above 750 square feet must be proportionate to it 1.
  • Which districts serve the lot. Flood, fire, sewer and transit districts each may add a line, as on Sacramento’s sheet 2.
  • Review rounds. Incomplete plans can mean more review time, which some cities bill.

Staying at 750 square feet or less: benefits and limits

Benefits

  • No impact fees in California on the ADU 1.
  • Under 500 square feet, the unit is treated as not adding school-fee space 1.
  • A smaller unit usually means a smaller permit valuation too.

Limits

  • Plan review, permit and inspection fees still apply.
  • Less space to rent or live in, which may cut rent more than you save in fees.
  • The statute measures interior livable space; your city’s method decides where you land.

Permit fees compared with related costs

TermWhat it coversWho you pay
ADU permit feesReview, permit, inspection, plus any impact, school and hookup chargesCity, county, districts, utilities
Soft costsFees plus design, engineering, surveys and financing costsMany parties
Hard costsLabor and materials to buildYour contractor
Utility connection costConnection charges plus the trenching and pipe workUtility and contractor
Full cost estimateAll of the above, added upYour budget

Common misreadings

Myth A small ADU in California pays no fees.
Reality It pays no impact fees. Plan review, permit and inspection fees still apply, and Sacramento’s 749 sq ft column still totals about $5,272 2.
Myth Fees above 750 sq ft are the full new-home rate.
Reality They must be proportionate to the main home’s square footage (§ 66311.5(c)(1)).
Myth The rule is in Gov. Code 65852.2.
Reality That section was repealed in 2024. The current section is § 66311.5; a city document citing 65852.2 or 66324 is out of date.

What to ask the city and your builder

  • Does your city publish an ADU fee estimate sheet? Which version is current?
  • How do you measure interior livable space for the 750 square foot rule?
  • Which fees are due at plan check, and which at permit issue?
  • Which outside agencies will bill me: school, sewer, water, fire, flood?
  • Is my unit a conversion or new construction for utility hookup rules?
  • Is there a fee for extra plan review rounds or re-inspections?
  • Builder: are permit and agency fees in your bid, an allowance, or excluded?

How to find your own fee total

  1. Find your city’s ADU fee estimate or fee schedule; many building departments publish one. Our California ADU fees by city study links the ones we have read.
  2. Measure the interior livable space on your plans and note which side of 750 sq ft it falls on.
  3. Call the school district for its residential rate; it is collected separately.
  4. Ask the water and sewer providers whether your ADU type needs a new connection under § 66311.5(d) or (e).
  5. Add the totals to the soft-cost side of your budget, then run the ADU fee estimator.

Checklist: fees before you sign a contract

  1. Download the current fee schedule and any ADU fee worksheet.
  2. Write down the interior livable square footage from your plans.
  3. Mark each fee line as city, school, utility or district.
  4. Get the school district’s answer in writing if your unit is near 500 square feet.
  5. Ask the sewer and water providers for their connection rule in writing.
  6. Put all fees in your budget as a separate soft-cost line.
  7. Recheck the totals before you pay, as schedules can change.

Where permit fees sit in the project

  1. ADU size (interior livable space)
  2. impact-fee exemption or proportional fee
  3. permit fee total
  4. soft costs
  5. cost estimate

Related guides, tools and research

Questions about adu permit fees

How much are ADU permit fees in California?

It depends on the city, the ADU’s size and the utilities. Sacramento’s own estimate sheet totals about $5,272 for a 749 sq ft new ADU and about $10,624 at 750 sq ft, before school, sewer and special district fees 2. Other cities use different schedules; check your city’s own fee sheet.

Are ADUs under 750 square feet exempt from fees?

In California they are exempt from impact fees only, under Gov. Code § 66311.5(c)(1). Plan review, permit and inspection fees still apply, and connection charges follow separate rules 1. So a small ADU still has a fee bill. It is just a smaller one on most city sheets.

Do I pay school fees on an ADU?

Possibly. School districts collect them under Education Code § 17620 5. Section 66311.5(c)(3) treats an ADU or JADU with less than 500 square feet of interior livable space as construction that does not add 500 square feet of assessable space, the threshold in that code 1. Ask your district how it applies this.

Can a utility make me install a separate water or sewer connection?

Not for an ADU created within an existing house or accessory structure under § 66323(a)(1), unless it is built with a new home or sold separately. For other ADUs it can, with a charge proportionate to the unit’s burden, measured by square feet or plumbing fixture load 1.

Who decides my ADU fees?

Your city or county building department, plus the school district and any water, sewer or special district that serves the lot. State law limits what they may charge; it does not set the amounts. Each office can explain its own line on your bill.

What is an impact fee on an ADU?

An impact fee is a charge for public facilities a new home is said to burden, such as parks, roads or flood control. California law defines it by reference to Gov. Code § 66000(b), which leaves out fees for processing applications 3. That is why plan review is not an impact fee.

Is a garage conversion ADU charged impact fees?

The size rule is the same for any ADU type: 750 square feet of interior livable space or less means no impact fee in California 1. A conversion inside an existing building also gets the gentler utility rule, with no required separate connection in most cases. See the garage conversion entry.

Where do I find my city’s ADU fee schedule?

Start with the building or planning department website. In California, a city, county or special district with a website must post a current schedule of fees for housing development there, or a direct link to it 4. If you cannot find it, call the permit counter and ask.

When do I pay ADU permit fees?

Usually in two or more payments. Plan review is often due when you submit plans. Most other city fees are due when the permit is issued, as on Sacramento’s worksheet 2. School and utility charges are paid to those offices, often before the city releases the permit.

Can fees above 750 square feet be the full new-home rate?

No, not in California. Impact fees on a larger ADU must be charged in proportion to the square footage of the main home 1. The law does not print a formula, so ask your city how it does the math before you settle on a size.

Sources

  1. California Legislature, Government Code § 66311.5 (renumbered from § 66324 by Stats. 2025, ch. 520, SB 543, effective 1 Jan 2026), retrieved .
  2. City of Sacramento Community Development, CDD-0419 Accessory Dwelling Unit (ADU) Fee Estimate, New Construction (fee schedule worksheet, revised 07-12-2026), retrieved .
  3. California Legislature, Government Code § 66000 (definition of “fee”, subdivision (b)), retrieved .
  4. California Legislature, Government Code § 65940.1 (fee schedules, zoning standards and fee reports must be posted on agency websites), retrieved .
  5. California Legislature, Education Code § 17620 (school district fees on construction; 500 sq ft threshold for other residential construction), retrieved .

Expert review

Written by the HyreADU Research team. Not yet reviewed by an outside expert. We say so rather than imply a review that has not happened; see our editorial policy.

How the numbers were checked: Statutes (Gov. Code §§ 66311.5, 66000, 65940.1; Education Code § 17620) read on leginfo.legislature.ca.gov on 7–8 October 2026, including the SB 543 renumbering note.

Sacramento figures transcribed from the city’s published PDF; subtotals are HyreADU arithmetic. The proportional example uses hypothetical inputs. Held for licensed review (G-REV) before indexing. Education, not legal advice.

Suggest a correction. We fix errors and say what changed.