Quick answer
ADU soft costs are the parts of an accessory dwelling unit budget that pay for paperwork, professional services and money rather than for physical construction: design, engineering, surveys, permits and government fees, utility charges, insurance and financing costs.
They are paid largely before the first shovel goes in, and most construction bids leave some or all of them out, so they are the lines most often missing from an early budget.
Quick facts
- Opposite of
- Hard costs: labor, materials and site work
- Paid when
- Mostly before construction: design and permit fees come first
- Often excluded from
- Contractor bids and “per square foot” prices
- Biggest swing items
- Impact fees, utility connections and design scope
- California fee rule
- No impact fees on ADUs of 750 sq ft interior livable space or less (Gov. Code § 66311.5) 2
Key takeaways
- Soft costs pay for plans, permits, fees, loans and insurance. Hard costs pay for the building itself.
- Most soft costs come due before construction starts, so you need cash early.
- Contractor bids often leave them out. Look for “by owner” or “by others” in the fine print.
- In California, an ADU of 750 sq ft of interior living space or less pays no impact fees 2. Other fees still apply.
- On one real city fee sheet, one extra square foot doubled the fee total 1.
- No trusted dataset gives a standard soft-cost percentage. Price your own lines instead.
What soft costs mean, in plain English
Think of an ADU budget as two piles of money. One pile buys wood, concrete, wire, pipe and the crew’s time. That is the hard-cost pile.
The other pile buys everything you need around the building. You pay a designer to draw it. You pay an engineer to check it will stand up. You pay the city to review and inspect it. You may pay a lender to borrow the money. That second pile is soft costs.
The name has nothing to do with how big the bills are. Some soft costs, like impact fees, can run into thousands of dollars. “Soft” only means you cannot touch what you bought.
Why soft costs matter to you
Soft costs cause three common budget problems. First, they arrive early. You pay for drawings and plan check months before a builder starts. If your loan has not closed yet, that money comes from savings.
Second, they hide. A builder’s price usually covers construction only. If you compare that price with your total budget, you will think you have more room than you do.
Third, they are easy to underestimate. A fee sheet can have more than twenty lines. School and sewer fees are often collected by other offices. Each one is small enough to forget and large enough to hurt.
Knowing your soft costs early also helps you decide size and type. In California, the size of the unit can switch whole fee groups on or off. That is a design choice you make before you pay for drawings.
The soft-cost lines on an ADU
| Line | What it covers | Who sets the price |
|---|---|---|
| Design fees | Floor plans, elevations, site plan and construction drawings for permit | The architect or designer, by flat fee, hourly rate or percentage |
| Structural engineering | Foundation, beams, shear walls and the calculations the city reviews | The engineer |
| Energy compliance | California Title 24 energy calculations and forms | An energy consultant or the designer |
| Survey and soils | Boundary or topographic survey; a soils report on slopes or poor ground | The surveyor or geotechnical engineer |
| Plan review and permit | City review of the drawings, permit issuance and inspections | The city’s fee schedule |
| Impact and school fees | Public facilities and schools | The city and school district, within state limits |
| Utility charges | Connection fees or capacity charges for water and sewer, and any electric service work application | Each utility |
| Financing costs | Loan origination, appraisal and interest during construction | The lender |
| Insurance | Builder’s risk or a policy change during construction | The insurer |
How soft costs build up, step by step
Soft costs follow the project calendar. Here is the usual order.
- Feasibility. You check zoning, setbacks and utilities. A survey may be ordered here. A feasibility check is a free first pass.
- Design. A designer or architect draws the unit. You usually pay in stages: a deposit, then a payment at each drawing set.
- Engineering and energy. An engineer adds structural calculations (math showing the frame holds up). In California, energy forms show the unit meets Title 24, the state energy code.
- Plan check. You submit drawings. The city charges a plan review fee, often at submittal.
- Permit issue. The city collects the building permit fee and any impact fees. The school district collects its fee at its own office.
- Utilities. Water and sewer providers may charge connection or capacity fees.
- Financing. If you borrow, the lender charges closing costs, an appraisal and interest while you build.
- Construction. Insurance during the build, and any re-inspection fees, run until final sign-off.
Steps 1 to 5 can all be paid before a single wall goes up. Plan your cash for that.
Design fees and engineering cost
Design is usually the largest soft cost you control. In California, Business and Professions Code § 5537 lets a person who is not a licensed architect prepare plans for a single-family dwelling of wood-frame construction up to two stories and basement. It also covers garages and other structures appurtenant to (that belong with) the home.
That is why many ADU plans are drawn by building designers. Choosing between an architect and a designer is a real price decision. For most wood-frame units it is not a legal requirement.
Engineering is separate. Even when a designer draws the plans, the city may require a structural engineer’s calculations. Slopes or poor soils can add a geotechnical (soils) report. Pre-approved plans from a city program can shrink the design line. See pre-approved ADU plans and the plan finder.
Sources: [3]
A real fee sheet: what one city charges before construction
Government fees are the soft cost you can check before hiring anyone. The City of Sacramento’s ADU fee estimate (CDD-0419, revised 12 July 2026) prices a new 749 sq ft ADU this way 1.
| Group of lines on the sheet | Amount |
|---|---|
| Building permit + plan review (valuation-based) | $1,799.93 |
| Fire, planning, public works and utilities review | $1,929.00 |
| Taxes, surcharges and recycling (excise, general plan, technology, business tax, recycling, green building, strong motion, residential construction tax) | $1,542.97 |
| Impact fees (park, flood control, transportation) | $0 |
| Total on the sheet (approx.) | $5,271.90 |
Group subtotals are HyreADU’s addition of the sheet’s lines. The sheet excludes school fees, sewer and regional sanitation fees and special district fees, and covers Sacramento only.
At 750 sq ft the same sheet adds three impact fees and totals about $10,624; see ADU permit fees for why the line falls there. The chart shows the jump at that line.
Worked example: a soft-cost budget you can copy
A hypothetical budget for arithmetic only. Every amount except the Sacramento fee line is an invented input, not a typical price. Use it as a template and replace each line with your own quote.
| Line | Hypothetical amount | When you pay |
|---|---|---|
| Survey (hypothetical) | $2,000 | Before design |
| Design and drawings (hypothetical) | $12,000 | In stages during design |
| Structural engineering and energy forms (hypothetical) | $4,000 | Before plan check |
| City fees, 749 sq ft new ADU (Sacramento sheet, 2026) | $5,272 | At submittal and permit issue |
| School fee (hypothetical; ask the district) | $0 to $2,000 | Before permit issue |
| Loan closing costs (hypothetical) | $3,000 | At loan closing |
| Soft-cost subtotal | $26,272 to $28,272 |
Now see the timing. In this example, about $23,000 is due before construction starts. That money must come from cash or an early loan draw. The timeline planner lays the dates side by side.
Where soft costs hide on a bid
- In the exclusions list: “permits and fees by owner” or “engineering by others”.
- In an allowance (a placeholder amount) for design or permits that is lower than the real fee sheet.
- In design-build contracts, where design is bundled; ask for it as its own line so you can compare. See ADU design-build.
- In per-square-foot quotes, which usually cover construction only. See ADU cost per square foot.
- In your loan papers. A mortgage Loan Estimate is a three-page form that shows estimated closing costs; the lender must give it within three business days of your application 5.
The rules: California’s fee limits, then other states
Fee rules are set state by state. Outside California, check your state and city law. Our ADU laws by state table tracks them.
In California, the main rule is Government Code § 66311.5. It was renumbered from § 66324 by SB 543 (Stats. 2025, ch. 520) on 1 January 2026.
It bans impact fees on an ADU of 750 square feet of interior livable space or less 2. Above that size, impact fees must be proportionate (scaled) to the main home’s square footage.
The rule does not cover plan review, permit or inspection fees. It also has separate limits on utility connection fees. For an ADU created inside an existing house or accessory building, a utility may not require a new connection or charge a connection fee. That can remove a whole soft-cost line from a conversion.
Sources: [2]
Financing costs: the soft cost people forget
If you borrow, the loan has its own costs. These include closing costs, an appraisal (a valuer’s report on the home) and interest while you build. The Loan Estimate form lists the estimated rate, monthly payment and total closing costs 5.
Timing matters here too. A Terner Center paper on ADU financing (July 2022) explains how renovation loans work.
The lender holds back the build money and releases it after an inspector confirms the work 4.
The same paper notes that lenders can release some funds for up-front costs such as materials, design and permit fees.
Ask your lender, in writing, which soft costs it will pay early and which you must cover from savings. See the ADU financing guide and the financing comparison.
Soft costs compared with related cost terms
| Term | What it covers | How it relates to soft costs |
|---|---|---|
| Soft costs | Design, engineering, fees, loans, insurance | This page |
| Hard costs | Labor, materials, site work, contractor margin | The other half of the budget |
| Permit fees | Plan check, permit, impact, school and utility fees | A subset of soft costs |
| Cost estimate | A priced list of the work | Often prices hard costs only |
| Contingency | Money held back for surprises | Covers both piles; set by risk |
Cutting soft costs: what works and what backfires
Usually works
- Staying at or under 750 sq ft of interior livable space in California, which removes impact fees 2.
- Using a city’s pre-approved plan where one fits your lot.
- Converting existing space, which may avoid a new utility connection under § 66311.5(d) 2.
- Getting the city fee sheet before design, so size is set with fees in mind.
Often backfires
- Skipping the survey on a tight lot, then redrawing after a setback dispute.
- Choosing the cheapest drawings, then paying for several plan-check correction rounds.
- Leaving financing costs out of the budget until the loan closes.
- Assuming a small ADU pays no fees at all. It still pays permit fees.
Common mistakes about soft costs
- Myth Soft costs are small.
- Reality They can run to thousands of dollars. Sacramento’s fee sheet alone totals about $5,272 for a 749 sq ft unit and about $10,624 at 750 sq ft 1.
- Myth Soft costs are a fixed percentage of the build.
- Reality We found no primary dataset that measures a standard share. Fees, design scope and loans vary too much. Price each line.
- Myth My builder’s price includes permits.
- Reality Only if the bid says so in writing. “By owner” in the exclusions means you pay.
- Myth Small ADUs in California are fee-free.
- Reality They are free of impact fees only 2. Plan review and permit fees still apply.
What to ask before you sign anything
- Designer: Is the fee flat, hourly or a percentage? How many plan-check correction rounds are included?
- Designer: Do you include structural engineering and Title 24 energy forms, or are those separate?
- City: Do you publish an ADU fee estimate? How do you measure interior livable space?
- School district: What is your residential rate, and does my ADU size pay it?
- Water and sewer provider: Does my ADU type need a new connection?
- Lender: Which soft costs will you fund before construction? What are the closing costs?
- Builder: Which soft costs are in your price, and which are “by owner”?
Checklist: price your soft costs
- Download your city’s ADU fee sheet. Our California fees-by-city study links the ones we have read.
- Decide your target size and note which side of 750 sq ft it falls on (California).
- Get two or three design quotes on the same scope.
- Ask whether engineering, survey and energy forms are included.
- Call the school district and each utility.
- Add loan closing costs from your Loan Estimate.
- Add insurance for the build period.
- Mark each line with the month you will pay it.
- Run the totals through the fee estimator and the cost calculator.
How soft costs feed the total
- Design and engineering
- plan check and permit fees
- impact, school and utility charges
- soft-cost total
- + hard costs
- = project estimate
Related guides, tools and research
- California ADU fees by cityPublished fee sheets, read line by line
- ADU fee estimatorWhich fee lines apply to your size
- ADU fee statisticsFee figures with their sources
- ADU cost guideThe whole budget
- ADU permits guideThe permit path, step by step
Questions about adu soft costs
What is included in ADU soft costs?
Design, engineering, energy calculations, surveys, plan review and permit fees, impact and school fees, utility charges, financing costs and insurance during construction. In short, anything that pays for services or paperwork rather than labor and materials on site.
What percentage of an ADU budget are soft costs?
There is no reliable statewide share; we found no primary dataset that measures it. Fees alone swing by thousands of dollars across one square foot in Sacramento 1. Price your own lines: get the city fee sheet and design quotes before comparing build bids.
Are permit fees a soft cost?
Yes. Plan review, permit, inspection, impact, school and utility connection charges are all soft costs. They pay for government services and system capacity, not for construction on your lot.
Do I need an architect for an ADU in California?
Not for most wood-frame units. Business and Professions Code § 5537 lets unlicensed persons prepare plans for wood-frame single-family dwellings up to two stories and basement and their appurtenant structures 3. The city may still require engineering.
What is the difference between hard and soft costs?
Hard costs buy the physical building: labor, materials, site work and the builder’s margin. Soft costs buy what surrounds it: plans, engineering, permits, fees, loan costs and insurance. A full budget needs both, plus a contingency.
When do I pay ADU soft costs?
Mostly before construction. Design is paid in stages, plan review at submittal, and permit and impact fees at permit issue. Loan costs come at closing. Interest and insurance run during the build. Plan your cash for the early months.
Can a construction loan pay for soft costs?
Sometimes. A 2022 Terner Center paper notes lenders can release some renovation-loan funds up front for costs such as materials, design and permit fees 4. Rules vary by lender and loan type, so ask yours in writing.
How can I lower ADU soft costs in California?
Keep the unit at or under 750 sq ft of interior livable space to avoid impact fees, use a pre-approved plan if one fits, and consider converting existing space, which can avoid a new utility connection 2. Do not skip the survey on a tight lot.
Are soft costs included in a cost per square foot quote?
Usually not. Builder per-foot quotes normally cover construction only. Ask what is included, then add design, fees and loan costs yourself before comparing.
Are school fees charged on ADUs?
They can be. School districts set and collect their own fees, separate from the city. California law treats an ADU under 500 square feet of interior livable space differently for this purpose 2. Call your district before you budget.
Sources
- City of Sacramento Community Development, CDD-0419 Accessory Dwelling Unit (ADU) Fee Estimate, New Construction (fee schedule worksheet, revised 07-12-2026), retrieved .
- California Legislature, Government Code § 66311.5 (formerly § 66324; renumbered by SB 543, Stats. 2025, ch. 520), retrieved .
- California Legislature, Business and Professions Code § 5537, retrieved .
- Terner Center for Housing Innovation and USC Lusk Center for Real Estate, “ADU Construction Financing: Opportunities to Expand Access for Homeowners” (July 2022), retrieved .
- Consumer Financial Protection Bureau, “What is a Loan Estimate?”, retrieved .
Expert review
Written by the HyreADU Research team. Not yet reviewed by an outside expert. We say so rather than imply a review that has not happened; see our editorial policy.
How the numbers were checked: Fee lines transcribed from the City of Sacramento’s published PDF and grouped by HyreADU; statutes read on leginfo.legislature.ca.gov on 7 October 2026; financing facts from the Terner Center’s 2022 paper and the CFPB, read the same day.
No soft-cost percentage is given because no primary dataset we could load measures one. Example amounts marked hypothetical are for arithmetic only.
Suggest a correction. We fix errors and say what changed.