Quick answer
ADU plans are the set of scaled drawings and documents that describe an accessory dwelling unit well enough for a building department to check it against zoning and building codes and for a contractor to build it.
They come in three forms: custom plans drawn for your lot, stock plans bought off the shelf, and plans a city has pre-approved. In California, using a pre-approved plan for a detached ADU shortens the legal review deadline.
Quick facts
- Also called
- ADU blueprints, permit set, construction documents
- Core sheets
- Site plan, floor plan, elevations, sections, structural, energy
- California pre-approval programs
- Required of every local agency by 1 January 2025, Gov. Code 65852.27 1
- Review deadline with a pre-approved plan
- Approve or deny a detached ADU within 30 days of a complete application 1
- Standard review deadline (California)
- 60 days from a complete application when a home already stands on the lot 2
- Who may draw them
- Varies; in California an unlicensed designer may prepare plans for wood-frame dwellings of up to two stories and basement 3
What ADU plans mean, in plain English
ADU plans are the drawings for your backyard home. They are drawn to scale, so one inch on paper equals a set distance on the ground.
They do two jobs. First, they let the city check the design against the rules before anything is built. Second, they tell the builder exactly what to build.
People often say "plans" when they mean the floor plan, the room layout. The real plan set is much bigger. It includes the lot, the outside walls, the structure and the energy math.
Why plans matter to you
Plans are where most delays start. If a sheet is missing or a number is wrong, the city sends back a list of corrections. Each round adds time.
Plans also fix the price. Builders bid on what the plans show. Vague plans lead to vague bids and later change orders.
And plans decide your speed in California. A city-approved plan can cut the legal review clock from 60 days to 30.
What is in an ADU plan set
| Sheet | What it shows | Why plan check cares |
|---|---|---|
| Site plan | Lot lines, existing buildings, the ADU footprint and distances between them | Proves setbacks and separation; see ADU site plan 5 |
| Floor plan | Rooms, doors, windows, kitchen and bath layout, dimensions | Checks the unit has complete living facilities and safe exits |
| Elevations | Each outside face, heights and materials | Checks height limits and design standards in the ADU regulations |
| Sections and details | Cuts through walls, roof and foundation | Checks how the building is put together |
| Structural | Foundation, framing, bracing; engineer's calculations where needed | Checks the building stands up; see ADU engineer |
| Energy and MEP | Title 24 energy compliance, electrical, plumbing and mechanical (MEP) | Checks state energy and systems codes |
Custom, stock or pre-approved: which plan type
| Plan type | What it is | Best when | Watch for |
|---|---|---|---|
| Custom | Drawn for your lot by an architect or designer | Odd lots, slopes, conversions, special needs | Longest design time and highest design fee |
| Stock | A pre-drawn design bought from a seller | A standard lot and a design you like as-is | Still needs a site plan, local structural and energy work, and full plan check |
| City pre-approved | A plan the local agency has already reviewed and posted under its program 1 | Detached ADUs on lots that fit the plan's footprint | Covers the building only; site plan, utilities and foundation fit are still checked |
| Factory-built | A model with a state factory-built insignia | Prefab buyers | See prefab ADU |
How plans move from idea to permit
- Check what fits on the lot first with the size envelope calculator.
- Pick a plan type: custom, stock, or one from your city's pre-approved list.
- Have the site plan drawn for your lot, plus structural and energy sheets.
- Submit. In California the city must tell you within 15 business days whether the application is complete. If it misses that date, the application is treated as complete (Gov. Code 66317) 2.
- Answer any correction list and resubmit.
- Receive the decision: within 30 days for a pre-approved detached plan, or 60 days under the general rule when a home already stands on the lot 1 2.
California's pre-approved plan law
Government Code 65852.27 is a live section, as amended by SB 477, effective 25 March 2024. It required every local agency to set up a program to pre-approve ADU plans by 1 January 2025.
The agency must accept submissions and may not limit who submits them. It reviews them against the ADU standards in Article 2 of Chapter 13. It may charge the same permit fees as for a same-size ADU.
Pre-approved plans are posted on the agency's website with the applicant's contact details. Posting is not an endorsement of the plan's author.
The payoff is speed. For a detached ADU, the agency must approve or deny a complete application within 30 days if it uses a pre-approved plan, or a plan identical to one it approved for a detached ADU, within the current three-year California Building Standards Code cycle. The section applies to charter cities too.
Without a pre-approved plan, the general rule in Government Code 66317 applies. Review is ministerial, meaning no hearing and no discretion. The decision is due within 60 days of a complete application when a home already stands on the lot.
Do not confuse 65852.27 with 65852.2, the old ADU law that was repealed and moved to Gov. Code 66310–66342.
The three state clocks below are the ones to track. The first tells you the set is complete, and the other two start from that point.
- 15 business daysTo tell you whether the application is complete; silence means completeGov. Code 66317
- 30 daysTo approve or deny a detached ADU on a pre-approved plan from the current code cycleGov. Code 65852.27
- 60 daysTo approve or deny other ADU applications when a home already stands on the lotGov. Code 66317
State deadlines, not typical times. Correction rounds can add time. Source: [2] [1]
Rules in other states
Outside California, pre-approved plan programs are local choices. Some cities offer them; many do not. Review deadlines also vary. See ADU laws by state and pre-approved plan research.
Worked example: the 30-day clock in practice
A hypothetical owner submits a complete application for a detached ADU on 1 March. They use a plan on the city's pre-approved list from the current code cycle.
| Step | What the law says | Date |
|---|---|---|
| Complete application received | Clock starts on receipt of a completed application 1 | 1 March |
| Decision due | Approve or deny within 30 days | 31 March |
| Same owner, custom plan | General rule: decide within 60 days of a complete application 2 | 30 April |
Both clocks run from a complete application. Missing site plan details or utility information mean the clock has not started. A pre-approved plan helps only if the rest of the set is right. Real-world timelines are on ADU approval times.
Real situations homeowners run into
- The plan fits, the lot does not. A pre-approved plan is 20 feet wide, but the back yard is 18 feet between the side setbacks. The plan has to be changed, which ends its pre-approved status.
- The garage conversion. Pre-approved plans are for detached ADUs. A garage conversion needs drawings of the existing structure, so it is almost always custom.
- The old stock plan. A plan drawn for an earlier code cycle may need new energy and structural sheets before it can be submitted.
- The slope. A hillside lot often needs an engineered foundation, which moves part of the design outside the wood-frame exemption 3.
Where you will see plans on paper
- Design contract: the list of sheets the designer will deliver, and how many correction rounds are included.
- Permit application: the plan set is attached, often as PDFs.
- Correction letter: the city lists sheets to fix, by sheet number.
- Builder's bid: the bid should name the plan set and date it is based on. Line bids up with the bid comparison tool.
What drives the cost of plans
HyreADU does not publish plan prices. No primary dataset gives dated, sourced design fees.
The drivers are scope and fit. A custom design for a sloped lot takes more hours than a stock plan on a flat one.
Structural engineering, energy calculations and survey work may be included or extra. Correction rounds add time. Design fees count as soft costs; model the total with the ADU cost calculator.
Pre-approved plans: benefits and limits
What it does well
- Shorter legal review deadline for a detached ADU in California.
- The design has already passed the city's checks once.
- Often less design work than a custom plan.
Where it falls short
- The footprint may not fit your lot.
- Site plan, foundation and utilities still need full review.
- Only valid within the current building code cycle.
Common misreadings
- Myth A pre-approved plan means no review.
- Reality The city still reviews the site plan, utilities and foundation fit. Only the building design is pre-checked.
- Myth A stock plan is permit-ready.
- Reality It still needs a site plan for your lot and local structural and energy documents.
- Myth The floor plan is the plan set.
- Reality The floor plan is one sheet. The set includes site, elevations, structure and energy.
What to check before you buy or commission plans
- Does the footprint fit your lot's buildable area?
- Is the plan on your city's list? Search with the pre-approved plan finder.
- For stock plans, what local work is excluded: site plan, structural calculations, energy compliance?
- Who holds the license or stamp if the design falls outside the wood-frame exemption 3?
- Is the plan's code cycle current? The 30-day rule applies only within the current cycle 1.
- Who owns the drawings? A California architect's contract must state the ownership and use of the drawings (Bus. & Prof. Code 5536.22) 4.
Your plans checklist
- Screen the lot with the feasibility checker.
- Pick a plan type.
- Get a written scope listing every sheet.
- Confirm structural and energy work are covered.
- Submit and diary the 15-business-day completeness date.
- Answer corrections quickly and in full.
Key takeaways
- ADU plans are the full permit set, not just the floor plan.
- California cities must run a pre-approved plan program (Gov. Code 65852.27).
- A pre-approved detached plan gets a 30-day decision; the general rule is 60 days.
- Both clocks start only from a complete application.
Plans research and tools
- Search pre-approved plans by cityThe finder tool
- ADU design hubLayouts, sizes and design decisions
- ADU permitsWhat happens after you submit
- Permit times by cityHow long review really takes
Questions about adu plans
What are pre-approved ADU plans?
They are ADU designs a city or county has already reviewed and posted under its pre-approval program. California required every local agency to run one by 1 January 2025 (Gov. Code 65852.27).
How long does approval take with a pre-approved plan?
In California, the agency must approve or deny a complete detached ADU application within 30 days if it uses a plan pre-approved, or identical to one approved, in the current building code cycle.
How long does approval take with a custom plan?
In California, the general rule is a decision within 60 days of a complete application when a home already stands on the lot (Gov. Code 66317). Correction rounds can add time before the application is complete.
Can I draw my own ADU plans?
In California, the architect licensing law does not stop anyone from preparing plans for a wood-frame single-family dwelling of up to two stories and basement (Bus. & Prof. Code 5537). Non-conventional structural parts need a licensed architect or engineer.
Are stock ADU plans permit-ready?
Not on their own. A stock plan still needs a site plan for your lot, local structural and energy documents, and full plan check, unless your agency has pre-approved it.
What is the difference between ADU plans and an ADU floor plan?
The floor plan is one sheet showing the room layout. ADU plans are the whole permit set: site plan, floor plan, elevations, structural and energy documents.
Who owns my ADU plans?
It depends on your contract. In California, an architect's written contract must state who owns and may use the drawings (Bus. & Prof. Code 5536.22). With a designer or seller, ask for the terms in writing.
What happens if the city says my plans are incomplete?
In California, the city must send a list of missing items and how to fix them. You resubmit, and the city checks completeness again. If it misses its deadline, the application is treated as complete (Gov. Code 66317).
Can I reuse a neighbor's approved ADU plans?
Only with the owner's permission, and the site plan must be redrawn for your lot. In California, a plan identical to one already approved for a detached ADU in the current code cycle gets the 30-day clock.
Sources
- California Legislature, Government Code 65852.27 (ADU plan preapproval program, as amended by SB 477, effective 25 Mar 2024), retrieved .
- California Legislature, Government Code 66317 (ministerial review, completeness and 60-day decision, as amended by SB 543, effective 1 Jan 2026), retrieved .
- California Legislature, Business and Professions Code 5537 (exempt plans), retrieved .
- California Legislature, Business and Professions Code 5536.22 (architect written contract), retrieved .
- International Code Council, 2024 International Residential Code, Chapter 1, Section R106.2 Site plan or plot plan, retrieved .
Expert review
Written by the HyreADU Research team. Not yet reviewed by an outside expert. We say so rather than imply a review that has not happened; see our editorial policy.
How the numbers were checked: Statute text read on leginfo.legislature.ca.gov and the model code on codes.iccsafe.org on 7 October 2026. The worked example uses hypothetical dates. No design fees or plan prices are published.
Suggest a correction. We fix errors and say what changed.