HyreADU

HyreADU tools

ADU impact fee calculator: does the 750 sq ft rule cover you?

Type your ADU’s interior livable area. Add the main house size and your city’s fee to see a proportional figure.

The ADU impact fee calculator checks the California rule: no impact fee may be charged on an ADU of 750 square feet or less of interior livable space, or a JADU of 500 or less, and above that impact fees must be proportional to the main house (Gov. Code § 66311.5).

Type your city’s own fee to see a straight ratio. Connection charges are separate.

Impact fee check

The fee field starts empty; type your city’s published figure.

From your city’s fee schedule.

— The rule
— Impact fee
— School fees

What this assumed —

Connection and capacity charges are not impact fees and are not covered.

How this calculator works

If the ADU is 750 sq ft or less (JADU 500 or less): no impact fee. Otherwise: proportional fee = city fee × (ADU area ÷ main house area), capped at the full fee. Your city may compute proportionality differently.

What each input means

Inputs on this tool, in the order they appear on the form.
InputWhat it is actually asking
Interior livable area Measured inside the walls. Ask your city how it measures.
City fee The impact fee your city lists. We publish no city fees.

Worked examples

Including one where the naive answer misleads, which is the example most calculators leave out.

A 749 sq ft unit

Type 749. The tool says impact fees do not apply. That is why many plans stop just under 750.

An 800 sq ft unit

Type 800, a 1,600 sq ft house and your city’s fee. The tool shows half the fee on a straight ratio.

What changes the result

The fee moves from none to proportional at the 750 sq ft line. Below 500 sq ft, school fee treatment also changes.

When not to use this

Do not use this for connection or capacity charges, plan check fees or permit fees; they are separate. The ADU fee estimator covers the wider fee picture.

Questions this calculator answers

Are ADUs exempt from impact fees in California?
At 750 sq ft or less of interior livable space, yes.
Do JADUs pay impact fees?
Not at 500 sq ft or less.
What about water and sewer charges?
Connection and capacity charges are a separate rule and may still apply.
If my fees look wrong, what do I do?
Ask for an itemized list. See ADU impact fees too high.

Sources and methodology

Figures dated 27 October 2026. Last reviewed .

Related

Explore ADU Options Back to the homepage