Washington ADU permits data: what Seattle’s records show

Seattle is the only Washington city that tags ADUs on every building permit in open data. We counted them, year by year.

Updated October 2026 · Data as of City of Seattle SDCI Building Permits (data.seattle.gov, dataset 76t5-zqzr), downloaded 2026-10-27; dataset last updated 2026-10-25. The dwelling unit type field is filled through 2025-06-30.

What to do next: use this research to check your own lot and bids, then tell us about your project. Matching is not live yet, so we reply with information, not a quote.

Get ADU options

Written by HyreADU Research Desk Primary-source research and data analysis

871 Seattle ADU permits issued in 2024 SDCI Building Permits, dwelling unit type contains “Accessory Dwelling”. Retrieved 2026-10-27.
58% of 2020–2024 ADU permits included a detached unit Up from 44% in 2010–2019.
132 days median city plan review time, 2024 SDCI field totaldaysplanreview, ADU permits issued in 2024.

The finding

Washington ADU permits data is best measured in Seattle, where the city issued 871 ADU building permits in 2024, six times the 145 it issued in 2010. We counted every permit in Seattle’s open permit data whose dwelling unit type includes an attached or detached ADU: 5,545 permits from 2010 through 2024.

Growth jumped after 2019: permits went from 289 in 2019 to 814 in 2022. Detached units now lead. Since 2020, 58% of ADU permits included a detached unit, up from 44% in 2010–2019.

The median permit spent 132 days in city plan review in 2024. Washington has no statewide ADU permit count, so these are Seattle numbers, not state totals.

Read this first

  • These are Seattle numbers

    Washington publishes no statewide count of ADU permits, and the Census Building Permits Survey has no ADU category. Seattle tags ADUs on each permit, so it is the one Washington city we can measure this way. Do not read these as state totals.

  • A permit is not a finished unit

    We count building permits issued. Some are never built. One permit can cover an attached and a detached ADU together; those are shown as their own group.

  • 2025 is half a year

    The city filled the dwelling unit type field through June 30, 2025. The 493 permits shown for 2025 cover January to June only and are shaded in the chart.

  • No cost figures

    The dataset carries a declared project value. We do not publish it: a permit valuation is not a build price.

Seattle ADU permits issued, by year

Seattle ADU permits rose slowly through the 2010s, jumped in 2020–2022, and have held near 850 a year since.

Attached onlyDetached onlyAttached and detached02505007501,0002010: 90 attached only2010: 55 detached only2010: 0 both145102011: 66 attached only2011: 43 detached only2011: 0 both109112012: 69 attached only2012: 45 detached only2012: 1 both115122013: 75 attached only2013: 50 detached only2013: 0 both125132014: 92 attached only2014: 63 detached only2014: 0 both155142015: 106 attached only2015: 85 detached only2015: 1 both192152016: 154 attached only2016: 118 detached only2016: 2 both274162017: 139 attached only2017: 115 detached only2017: 0 both254172018: 125 attached only2018: 119 detached only2018: 0 both244182019: 157 attached only2019: 132 detached only2019: 0 both289192020: 191 attached only2020: 220 detached only2020: 29 both440202021: 234 attached only2021: 332 detached only2021: 95 both661212022: 301 attached only2022: 443 detached only2022: 70 both814222023: 399 attached only2023: 445 detached only2023: 13 both857232024: 406 attached only2024: 452 detached only2024: 13 both871242025: 234 attached only2025: 258 detached only2025: 1 both49325** 2025 = January to June only
ADU building permits issued in Seattle per year, by type. Shaded 2025 bar is January to June only. HyreADU calculation from City of Seattle SDCI Building Permits (76t5-zqzr), retrieved 2026-10-27.
YearPermits issuedAttached onlyDetached onlyBothPre-approved DADU planMedian plan review (days)
2010145905500not recorded
2011109664300not recorded
2012115694510not recorded
2013125755000not recorded
2014155926300not recorded
20151921068510not recorded
201627415411820not recorded
201725413911500not recorded
201824412511901126
20192891571320992
202044019122029388
20216612343329539135
20228143014437076155
20238573994451359148
20248714064521372132
2025 (Jan–Jun)493234258132147

Plan review days are recorded in the dataset from 2018 onward. “Pre-approved DADU plan” is the city’s housing category for permits using its pre-approved detached ADU plans.

What changed after 2019

Seattle issued 289 ADU permits in 2019 and 440 in 2020. By 2022 it was 814. The permit data shows when the jump happened, not why. This page does not attribute the rise to any one cause; the city’s own code history is the place to test that.

The mix also shifted. Before 2020, attached ADUs, such as basement units, made up most permits. Since 2020, 58% of permits included a detached unit. The “both” group, where one permit adds an attached and a detached ADU, peaked at 95 in 2021.

Since 2023, Washington state law (RCW 36.70A.681) has required cities in urban growth areas to allow two ADUs per lot. Our Washington ADU laws page explains what that law requires. Seattle permits in 2023 and 2024 stayed near their 2022 level rather than rising again.

How long city review takes

The median Seattle ADU permit spent 92 days in plan review in 2019 and 155 days in 2022, when volume peaked. In 2024 the median was 132 days.

This field counts days in the city’s plan review, as Seattle records it. It is not the full time from application to permit, and it leaves out time the applicant spends on corrections. For a California comparison measured differently, see ADU permit times by city.

Pre-approved plans in Seattle

291 ADU permits from 2018 to mid-2025 fall in the city’s “Pre-Approved DADU Plans” housing category. That is a small share of all ADU permits. For how pre-approved plan programs work and which cities offer them, see our pre-approved ADU plans research.

Method

Anyone can repeat this count from the city’s public API.

  1. 1
    Download

    We queried data.seattle.gov dataset 76t5-zqzr on 2026-10-27 for every permit whose dwellingunittype contains “Accessory Dwelling”. That returned 6,432 rows and 6,432 unique permit numbers.

  2. 2
    Classify

    Permits listing only “Accessory Dwelling Attached” are attached; only “Accessory Dwelling Detached” are detached; permits listing both are their own group. Other unit types on the same permit, such as a new house, do not change the class.

  3. 3
    Count by issue year

    Each permit is counted once, in the year of its issue date. Permits with no issue date are left out.

  4. 4
    Review time

    The median of the city’s totaldaysplanreview field across ADU permits issued in the year, where recorded.

How to cite this page

HyreADU Research Desk, “Washington ADU permits data: what Seattle’s records show,” HyreADU, October 2026, https://hyreadu.com/research/washington-adu-permits/. Data: City of Seattle SDCI Building Permits (76t5-zqzr), retrieved 2026-10-27. Licensed CC BY 4.0.

Questions

How many ADU permits does Seattle issue a year?
871 in 2024, 857 in 2023 and 814 in 2022, counting permits whose dwelling unit type includes an ADU.
Is there statewide ADU permit data for Washington?
Not as a single series. The Census Building Permits Survey has no ADU category, so city records like Seattle’s are the best measure.
Are most Seattle ADUs attached or detached?
Since 2020, 58% of Seattle ADU permits included a detached unit. Before 2020, attached units were more common.
How long does Seattle take to review an ADU permit?
The median ADU permit issued in 2024 spent 132 days in city plan review, by the city’s own count.
Can I download the data?
Yes. The year-by-year table is a free CSV below, licensed CC BY 4.0.

Written and audited by

HyreADU Research Desk

Primary-source research, data analysis and fact checking

We are a research desk, not a builder. We read the permit extract, the statute, the HCD return or the fee schedule ourselves, and publish each figure with its source and retrieval date.

Where a number cannot be traced to a primary source, we leave it out and say what we could not verify. Our store-based claims cover California only.

CA
the only state this desk will make store-based claims about
5
jurisdictions with extracted ADU permit evidence
735
CSLB-verified companies in the California store
0
national claims from a one-state store

How this desk works

  • Primary sources only. Permit counts come from the city or county that issued the permit. Production counts come from HCD’s Annual Progress Report. Rents come from HUD or the Census. We do not cite an article that cites a source; we download the source and compute the figure ourselves.
  • This is a California site. The company store is 734 California firms and one New Mexico firm. Permit evidence exists for five named jurisdictions: Los Angeles, San Francisco, Sacramento, San José and unincorporated Marin. A number from that store is titled to those places, never to the United States.
  • A permit is not a completion, and a license is not an ADU grade. California licenses no ADU classification. Being named on an ADU permit is evidence of engagement in that jurisdiction, not of quality, completion, or work anywhere else. Owner-builder permits are excluded from contractor counts.
  • Calculation is labeled as calculation. Figures we derive are never presented as something HCD, HUD, the Census or a city published. Terner Center research is cited as Terner’s, never restated as ours.
  • We do not design, permit or build ADUs, and we take no payment for placement, ranking or a favorable mention. Pages that look like rankings are not: they publish public-record counts and let the reader decide.
  • Nothing here is legal, tax or financial advice. Zoning, underwriting and appraisal practice vary by jurisdiction, lender and appraiser. The useful next step on a specific lot is the planning counter and a licensed professional.

Data as of City of Seattle SDCI Building Permits (data.seattle.gov, dataset 76t5-zqzr), downloaded 2026-10-27; dataset last updated 2026-10-25. The dwelling unit type field is filled through 2025-06-30.. Authorship on this site is organizational: the analysis belongs to the desk rather than to a named individual, and we do not publish credentials we do not hold.

Our editorial policy sets out how we source, date and correct what we publish.

The data behind this page

Every figure on this page is computed from one file, and that file is published here so the analysis can be checked, disagreed with, or reused.

Download the dataset (CSV)

Sources & retrieval dates

  1. City of Seattle, SDCI Building Permits (dataset 76t5-zqzr) , data.seattle.gov Retrieved 2026-10-27.
  2. RCW 36.70A.681, Accessory dwelling units, limitations on local regulation , Washington State Legislature Retrieved 2026-10-27.

Thinking about an ADU in Washington?

Tell us about your lot. Matching is not live yet, so this is not a quote. We will send ADU options and the questions to ask your city.

Get ADU options Feasibility checker

HyreADU is a publisher. It does not design, permit or build ADUs. Figures are a HyreADU calculation from City of Seattle open data and are not an official city statistic.