HyreADU

Statistics

Garage conversion statistics

39 of 44 figures are HyreADU calculations. How common the conversion is, what it is declared at, how big it ends up, and how often it finishes — measured on 39,279 Los Angeles permits.

Updated September 2026 · Data as of LADBS Socrata resource pi9x-tg5x (409,619 rows) analyzed 2026-09-05, departmental refresh to 2026-08-30; Government Code §§ 66311.5, 66313, 66314 and 66323 retrieved 2026-09-05

Written by HyreADU Research Desk Primary-source research and data analysis

Audited by HyreADU Research Desk Provenance and citation audit

49.1% of Los Angeles ADU permits describe converting a garage HyreADU calculation: 19,294 of 39,279 permits, 2020–2026. The classifier is a HyreADU keyword read of the department’s work_desc field, not a departmental count.
$48,000 median declared valuation on a conversion permit HyreADU calculation. Against $96,000 on every other ADU permit. Declared valuation is a fee input, not a construction cost.
+8.3 pts higher completion rate than every other ADU permit HyreADU calculation: 67.8% of conversion permits reached a certificate of occupancy or final, against 59.5%.

How to use this page

In the City of Los Angeles, 19,294 of 39,279 ADU-adding building permits issued between 1 January 2020 and 2026-08-30 — 49.1% — carry a work description that describes converting a garage. The conversion is not a niche route.

On the only complete permit file in California that carries a departmental ADU flag, it is roughly half of everything.

And it is stable. The share sits between 38% and 61% in every year of the window, so it is not a phase the market is passing through.

It is the small lane and the cheap-on-paper lane. Median declared valuation is $48,000 against $96,000 on every other ADU permit (2.00×), and median permitted floor area is 480 sq ft against 890 sq ft. A declared valuation is a fee input, not a construction cost, and we treat it that way throughout — the valuation study explains why the two diverge.

It is also the lane that finishes. 67.8% of conversion permits in the frame have reached a certificate of occupancy or a permit final, against 59.5% of everything else — a gap of 8.3 percentage points.

39 of 44 figures on this page are HyreADU calculations (39 hyreadu calculation, 4 agency published, 1 trade / survey estimate). This is a Los Angeles number and nothing else. There is no California garage-conversion share on this page, because no California file supports one.

And a garage that is legal to park in is not a garage that is legal to sleep in: fire separation, egress, ceiling height, slab and foundation work, a service upgrade, and alarms are what close that gap, and a plan checker exists to look at all of it.

Read the provenance, not just the number

Every figure below is one of three things, and the row says which.

HyreADU calculation — we downloaded the Los Angeles permit extract, framed it on the department’s own ADU flags, classified the work description, and computed the share, percentile or ratio ourselves.

The method and its failure modes are on the garage-conversion study.
Agency published — a statutory provision quoted from the Government Code. We cite the section, not an article about the section.
Trade / survey estimate — Chapple, Ganetsos and Lopez’s 2021 owner survey. A survey of a 2018–19 cohort, labeled as what it is.

Where the classifier can be wrong. The ADU frame is the department’s: adu_changed and junior_adu are LADBS fields.

The garage classification is not — it is our keyword read of the department’s free-text work_desc. A permit that converts a garage but does not say so is missed.

A permit that mentions a garage while doing something else to it can be caught.

We publish the share to one decimal place and label it as ours precisely because it is a classification, not a count.

Why the geography column never widens. Los Angeles is the only California jurisdiction this desk has found that publishes a departmental ADU flag on a complete permit extract. HCD’s Annual Progress Report counts ADU units statewide but has no conversion category.

So a California conversion share does not exist in any file we can reach, and we would rather say that than compute one from a single city and hope nobody checks.

The figures most worth knowing

19,294 ADU permits describing a garage conversion HyreADU calculation · of 39,279 in the frame
49.1% conversion share of all ADU permits HyreADU calculation · 38%–61% in every year
480 sq ft median permitted floor area on a conversion HyreADU calculation · against 890 sq ft on other ADU work
$48,000 median declared valuation HyreADU calculation · a fee input, not a cost
67.8% of conversion permits reached a certificate of occupancy or final HyreADU calculation · frame-wide rate 63.6%

Full method, classifier rules and limitations on the garage-conversion study.

How common, year by year

If the conversion were a response to a temporary condition — a construction-cost spike, a financing window — the share would move. It does not. Across seven years of issue it stays inside a 23-point band while the absolute number of ADU permits roughly doubles.

The conversion share does not moveShare of City of Los Angeles accessory dwelling unit permits whose work description describes converting a garage, by year of issue. 2020, 61% (2,045 of 3,373); 2021, 56% (2,819 of 5,072); 2022, 53% (3,740 of 7,120); 2023, 49% (2,992 of 6,158); 2024, 47% (3,018 of 6,394); 2025, 45% (3,091 of 6,933); 2026, 38% (1,589 of 4,229). The share never falls below 38% or rises above 61% in the window. 2026 is a partial year.Garage-conversion share of ADU permits · City of Los Angeles0%20%40%60%half of all ADU permits61%20202,04556%20212,81953%20223,74049%20232,99247%20243,01845%20253,09138%20261,589Year of issue · conversion permits shown beneath each bar · 2026 partial
Every bar is a row of the table below. 2026 is a partial year — the department’s own refresh field runs to 2026-08-30 — which is why its bar is shaded back. Chart: HyreADU Research Desk, from LADBS resource pi9x-tg5x, analyzed 2026-09-05.
Year of issueConversion permitsAll ADU permitsConversion shareClass
20202,0453,37360.6%HyreADU calculation
20212,8195,07255.6%HyreADU calculation
20223,7407,12052.5%HyreADU calculation
20232,9926,15848.6%HyreADU calculation
20243,0186,39447.2%HyreADU calculation
20253,0916,93344.6%HyreADU calculation
20261,5894,22937.6%HyreADU calculation

All rows are HyreADU calculations over the LADBS extract. Frame total 39,279 permits; 19,294 classified as conversions; 49.1% overall. 2026 covers part of the year only.

The pipeline from permit to occupancy — which is where this stability starts to matter — is on the permits-versus-completions study.

The cheap lane on paper, the small lane in fact

Two distributions from the same file, one for conversion permits and one for everything else. The gap is real and it is large — but the left-hand column is a declared valuation, which is what a fee is computed from, not what the job costs.

Two lanes, on the department’s own valuation fieldDeclared permit valuation for Los Angeles accessory dwelling unit permits. Garage conversions: 10th percentile $20,000, median $48,000, 90th percentile $102,457. Every other ADU permit: 10th percentile $20,000, median $96,000, 90th percentile $272,000. The median for other work is 2.00 times the conversion median. Declared valuation is a fee input, not a construction cost.Declared valuation$0$50k$100k$150k$200k$250k$300kGarage conversion$48,000Every other ADU permit$96,000Thin line p10–p90 · thick bar p25–p75 · dot is the median · not a construction cost
The interquartile ranges barely overlap. The conversion 75th percentile ($75,000) sits below the other lane’s median ($96,000). Chart: HyreADU Research Desk, from the same percentiles tabulated below. LADBS resource pi9x-tg5x, analyzed 2026-09-05.
MeasureGarage conversionEvery other ADU permitRatioClass
n, declared valuation19,28619,964—HyreADU calculation
10th percentile valuation$20,000$20,0001.00×HyreADU calculation
25th percentile valuation$30,000$47,0001.57×HyreADU calculation
Median valuation$48,000$96,0002.00×HyreADU calculation
75th percentile valuation$75,000$150,0002.00×HyreADU calculation
90th percentile valuation$102,457$272,0002.65×HyreADU calculation
n, permitted floor area17,93715,001—HyreADU calculation
25th percentile floor area373 sq ft586 sq ft1.57×HyreADU calculation
Median floor area480 sq ft890 sq ft1.85×HyreADU calculation
75th percentile floor area745 sq ft1,200 sq ft1.61×HyreADU calculation
90th percentile floor area1,193 sq ft1,818 sq ft1.52×HyreADU calculation
Implied declared valuation per sq ft, at the medians$100$1081.08×HyreADU calculation

Percentiles are HyreADU calculations over the LADBS valuation and square_footage fields. The per-square-foot row is the ratio of the two medians and is published as an implied declared figure — it is not a construction rate, and it should not be used as one.

A single standalone comparison of the two routes lives in the garage conversion versus new build tool.

Why declared valuation understates a conversion in particular. The fee-relevant value is the work described on the permit.

Fire separation, egress, alarms and a panel upgrade may be split across trade permits; the slab, the foundation and the driveway may not be in this line at all.

That structure pushes the conversion lane down relative to a single new-build permit that carries everything. Read the valuation study before quoting either column as a price.

What kind of permit a conversion actually is

Permit type is the tell that a conversion is a legal reclassification rather than a construction project. Almost none of it is filed as new construction, because from the department’s point of view the building already exists.

Alteration or repair11,491
59.6% of conversions
Addition7,793
40.4% of conversions
New construction10
0.1% of conversions
Permit typeConversion permitsShare of conversionsClass
Bldg-Alter/Repair11,49159.6%HyreADU calculation
Bldg-Addition7,79340.4%HyreADU calculation
Bldg-New100.1%HyreADU calculation

Across the whole ADU frame the department issued 10,612 new-construction permits, 12,227 additions and 16,439 alteration or repair permits. The conversion lane accounts for almost none of the first category and most of the third.

This matters for how the numbers should be read. An alteration permit’s square_footage can describe the scope of work rather than the finished unit, which is why every floor-area headline on the size digest is drawn from new construction only.

The lane that finishes

A permit is an intention. What separates the two lanes most usefully is not price or size but whether the department ever signed the job off.

GroupShare reaching a certificate of occupancy or permit finalClass
Garage conversion permits67.8%HyreADU calculation
Every other ADU permit59.5%HyreADU calculation
Whole ADU frame63.6%HyreADU calculation
Gap in favor of conversions+8.3 percentage pointsHyreADU calculation

Computed from the department’s cofo_date and status_desc fields. This is a rate over a window, not a cohort survival rate: a permit issued in 2026 has had far less time to finish than one issued in 2020, and both are in the denominator.

The comparison between the two lanes is still meaningful because both are subject to the same censoring.

Do not read this as “conversions are easier”. A shorter, cheaper, smaller job finishing more often is unsurprising.

What it does say is that the conversion route converts intention into occupied housing at a higher rate than the alternative, which is the number that matters for housing supply. Statewide permit-to-completion behavior is on the completions study.

Where the conversion is the dominant route

The conversion share is above 40 per cent in every area planning commission in the city, and the spread between the highest and the lowest is 12.0 points. This is one municipal code and one state statute producing seven different mixes, because the housing stock differs.

North Valley52.3%
5,106 of 9,764 permits
South Valley51.4%
5,850 of 11,379 permits
Central50.4%
1,649 of 3,274 permits
South Los Angeles49.0%
3,083 of 6,297 permits
West Los Angeles43.8%
1,837 of 4,197 permits
Harbor41.1%
420 of 1,022 permits
East Los Angeles40.3%
1,349 of 3,346 permits
Area planning commissionConversion permitsAll ADU permitsConversion shareClass
North Valley5,1069,76452.3%HyreADU calculation
South Valley5,85011,37951.4%HyreADU calculation
Central1,6493,27450.4%HyreADU calculation
South Los Angeles3,0836,29749.0%HyreADU calculation
West Los Angeles1,8374,19743.8%HyreADU calculation
Harbor4201,02241.1%HyreADU calculation
East Los Angeles1,3493,34640.3%HyreADU calculation

All rows are HyreADU calculations over the LADBS extract. North Valley runs highest at 52.3%; East Los Angeles lowest at 40.3%. The two Valley commissions alone account for 10,956 of the 19,294 conversion permits in the file.

The same file split by floor area rather than route is on the size digest, where the Valley is also where the largest units are built.

Figures we will not repeat

  • A national or statewide “garage conversions are X% of ADUs”

    We have a Los Angeles share of 49.1% because Los Angeles publishes a permit extract with a departmental ADU flag and a free-text work description. HCD’s Annual Progress Report has no conversion category.

    The Census Building Permits Survey has no ADU category at all, and a garage conversion is frequently not counted in it as new residential construction. So there is no California figure to quote, and we will not derive one from one city.

  • A declared valuation quoted as a garage conversion cost

    $48,000 is the median value declared on the permit for fee purposes. It is not a contract price, it excludes work carried on separate trade permits, and the incentive structure around it is not neutral.

    Anyone publishing it as “the cost of a garage conversion in Los Angeles” has changed what the number means. The valuation study exists to stop us doing that.

  • The classifier presented as a departmental count

    LADBS flags ADUs. LADBS does not flag garage conversions. The conversion classification on this page is HyreADU’s keyword read of a free-text field, and it will both miss and over-catch. Every row carrying it says HyreADU calculation. A citation that attributes the conversion share to the City of Los Angeles is wrong.

  • Any instruction on how to convert a garage

    A garage that is legal to park in is not a garage that is legal to sleep in.

    Fire separation from the remaining garage or the house, a compliant egress opening, ceiling height, slab and foundation condition, electrical service capacity, and smoke and carbon-monoxide alarms are the work that closes the gap — and every one of them is a plan-check and inspection question, not a statistics question.

    This page counts permits. It does not tell anyone how to build.

Citing these figures

Journalists and planning desks are welcome to cite these tables. Link the garage-conversion study rather than this digest: the classifier, the frame rules and the limits live there.

Where a figure is labeled HyreADU calculation, attribute it to HyreADU and name the file — “HyreADU analysis of the Los Angeles Department of Building and Safety permit extract pi9x-tg5x, 39,279 ADU-adding permits, 2020–2026.” Where it is Agency published, cite the Government Code section. Corrections go on the page with a dated note: hello@hyreadu.com.

Carry the two qualifiers. It is one city, and the conversion classification is ours rather than the department’s. Both fit in a sentence, and dropping either turns a measurement into a claim.

Questions

How common are garage conversion ADUs?
In the City of Los Angeles they are roughly half of all ADU permits: 19,294 of 39,279 ADU-adding permits issued 2020–2026, or 49.1% (HyreADU calculation). The share stayed between 38% and 61% in every year of the window. There is no sourced California-wide or national conversion share — no agency publishes a file with a conversion category.
How much does a garage conversion cost?
This page cannot tell you, and it says so deliberately. What it has is the declared valuation on the permit: median $48,000 for conversions against $96,000 for every other ADU permit, with a conversion interquartile range of $30,000 to $75,000. A declared valuation is the figure a permit fee is computed from. It is not a contract price and it excludes work carried on separate trade permits. Use the cost calculator with numbers from your own bids, and read the valuation study first.
How big is a converted garage ADU?
Median permitted floor area is 480 sq ft, with an interquartile range of 373 sq ft to 745 sq ft and a 90th percentile of 1,193 sq ft (HyreADU calculation). Every other ADU permit in the same file has a median of 890 sq ft. The conversion is smaller because it inherits a garage footprint — the statutory ceilings are rarely the binding constraint on this route.
Is a garage conversion more likely to actually get built?
In this file, yes. 67.8% of conversion permits have reached a certificate of occupancy or a permit final, against 59.5% of every other ADU permit — a 8.3-point gap (HyreADU calculation). Both figures are rates over a window rather than cohort survival rates, so a 2026 permit has had less time to finish than a 2020 one; the censoring applies equally to both groups, which is why the comparison holds.
Do I have to replace the parking I lose?
Not as a matter of state law for a conversion. California’s ADU statute expressly addresses replacement parking when a garage, carport or covered parking structure is converted or demolished for an ADU, and the local agency may not require it to be replaced. That is a statutory provision in the Government Code ADU chapter, currently in the 66310-series after the 2024 and 2025 recodifications, and the current text should be read at leginfo rather than taken from any summary — including this one. Parking rules are the subject of our parking study.
Why is almost no conversion filed as new construction?
Because from the department’s point of view the structure already exists. 59.6% of conversion permits are filed as alteration or repair and 40.4% as an addition; only 10 — 0.1% — are new construction (HyreADU calculation). That classification is the reason the conversion lane is described here as a legal reclassification of existing space rather than a construction project.
What about a garage that was already converted without a permit?
That is a different question with its own statute. California has a provision aimed at the legalization of unpermitted ADUs built before a specified date — the section that most published guidance still cites as § 66332, which SB 543 renumbered to § 66311.7 with effect from 1 January 2026. Whether a particular unconverted-on-paper garage qualifies is a question for your building department and, realistically, for a professional; we cover the landscape in the legalization study and count the stock in how many unpermitted ADUs.
Where does this data come from, and can I check it?
The City of Los Angeles Department of Building and Safety publishes every issued building permit as an open Socrata resource (pi9x-tg5x). We downloaded the full resource — 409,619 rows — on 2026-09-05, framed it on the department’s adu_changed and junior_adu flags, dropped supplemental permits by permit-number segment, and classified the department’s work_desc text for garage language. Every rule is written out on the garage-conversion study, and you can download the same file.

Written and audited by

HyreADU Research Desk

Primary-source research, data analysis and fact checking

We are a research desk, not a builder. We read the permit extract, the statute, the HCD return or the fee schedule ourselves, and publish each figure with its source and retrieval date.

Where a number cannot be traced to a primary source, we leave it out and say what we could not verify. Our store-based claims cover California only.

CA
the only state this desk will make store-based claims about
5
jurisdictions with extracted ADU permit evidence
735
CSLB-verified companies in the California store
0
national claims from a one-state store

How this desk works

  • Primary sources only. Permit counts come from the city or county that issued the permit. Production counts come from HCD’s Annual Progress Report. Rents come from HUD or the Census. We do not cite an article that cites a source; we download the source and compute the figure ourselves.
  • This is a California site. The company store is 734 California firms and one New Mexico firm. Permit evidence exists for five named jurisdictions: Los Angeles, San Francisco, Sacramento, San José and unincorporated Marin. A number from that store is titled to those places, never to the United States.
  • A permit is not a completion, and a license is not an ADU grade. California licenses no ADU classification. Being named on an ADU permit is evidence of engagement in that jurisdiction, not of quality, completion, or work anywhere else. Owner-builder permits are excluded from contractor counts.
  • Calculation is labeled as calculation. Figures we derive are never presented as something HCD, HUD, the Census or a city published. Terner Center research is cited as Terner’s, never restated as ours.
  • We do not design, permit or build ADUs, and we take no payment for placement, ranking or a favorable mention. Pages that look like rankings are not: they publish public-record counts and let the reader decide.
  • Nothing here is legal, tax or financial advice. Zoning, underwriting and appraisal practice vary by jurisdiction, lender and appraiser. The useful next step on a specific lot is the planning counter and a licensed professional.

Data as of LADBS Socrata resource pi9x-tg5x (409,619 rows) analyzed 2026-09-05, departmental refresh to 2026-08-30; Government Code §§ 66311.5, 66313, 66314 and 66323 retrieved 2026-09-05. Authorship on this site is organizational: the analysis belongs to the desk rather than to a named individual, and we do not publish credentials we do not hold.

Our editorial policy sets out how we source, date and correct what we publish.

Sources & retrieval dates

  1. City of Los Angeles Department of Building and Safety — Building Permits Issued from 2020 to Present (Socrata resource pi9x-tg5x) , Full resource download, 409,619 rows, retrieved 2026-09-05; departmental refresh field to 2026-08-30. Fields used: permit_nbr, permit_type, issue_date, cofo_date, status_desc, valuation, square_footage, work_desc, apc, adu_changed, junior_adu. The ADU frame is the department’s flags; the garage classification is HyreADU’s keyword read of work_desc. Retrieved 2026-09-05.
  2. California Government Code § 66314 — the standards a local ADU ordinance may impose , The treatment of existing accessory-structure space, the size ceilings, and the parking provisions relevant to a converted garage. Retrieved 2026-09-05.
  3. California Government Code § 66323 — ministerial approval of a qualifying ADU , The provision that makes a conforming application a plan-check question rather than a discretionary one. Retrieved 2026-09-05.
  4. California Government Code § 66313 — definitions, including the 500 square foot junior ADU , Amended by SB 543 (Stats. 2025, Ch. 520), operative 1 January 2026. Retrieved 2026-09-05.
  5. California Government Code § 66311.5 — impact fees and the 750 square foot threshold , Added by renumbering § 66324 by Stats. 2025, Ch. 520 (SB 543), operative 1 January 2026. Relevant because most conversions fall under the threshold. Retrieved 2026-09-05.
  6. SB 543 (McNerney, 2025) — Accessory dwelling units. Stats. 2025, Ch. 520 , The second recodification of the ADU chapter in under two years. Renumbers § 66324 to § 66311.5, § 66327 to § 66313.5 and § 66332 to § 66311.7 from 1 January 2026. Cited because guidance on unpermitted garage conversions almost universally still cites § 66332. Retrieved 2026-09-05.
  7. Chapple, Ganetsos and Lopez, Implementing the Backyard Revolution (UC Berkeley Center for Community Innovation, 22 April 2021) , 51 per cent of new California ADUs generating rental income, in a survey of owners of units permitted or completed in 2018–19. Cited as theirs. Retrieved 2026-09-05.

Half the permits, and none of the shortcuts

A conversion is the most common ADU permit in Los Angeles and the one most likely to finish. It is still fire separation, egress, ceiling height and service capacity — decided by a plan checker, not by a statistic.

Compare the two routes Read the study

HyreADU does not design, permit or build accessory dwelling units. Statistics are informational. They are not legal, construction or land-use advice, and nothing here is an instruction to convert a garage or an assurance that any conversion is permittable.

Every figure labeled as a HyreADU calculation is a measurement of City of Los Angeles building permit records and describes no other jurisdiction. The garage classification is HyreADU’s reading of a free-text departmental field, not a departmental count.

Declared permit valuation is a fee input, not a construction cost. Statutory text was retrieved on the date shown; California ADU law was recodified twice between 2024 and 2026 and section numbers change.