ADU permit statistics

33 of 61 figures are HyreADU calculations. The California permit series year by year and jurisdiction by jurisdiction, with the counting rule stated, and the federal survey that cannot see an accessory unit at all.

Updated September 2026 · Data as of HCD APR Table A2 retrieved 2026-09-05; HCD last updated 4 September 2026 (15:44 UTC); Census BPS annual 2025 release 14 May 2026; RHNA Progress Report retrieved 2026-09-05

Written by HyreADU Research Desk Primary-source research and data analysis

Audited by HyreADU Research Desk Provenance and figure-ledger audit

178,495 California ADU permit units, 2018–2025 Unique permit events, deduplicated by tracking identifier, assigned to the date on the permit. 511 reporting jurisdictions. HCD APR Table A2, retrieved 2026-09-05.
35,237 units a naive sum by reporting year double-counts 16.5% of a naive 213,732-unit total. HyreADU calculation. This is where inflated ADU permit totals come from.
26.12% of California’s permitted housing in 2025 was an ADU From 9.12% in 2018. Denominator is every unit category HCD collects — single family, ADU, 2-to-4, 5-plus, mobile home, single-family attached.

The short version

California jurisdictions reported 178,495 accessory-dwelling-unit building-permit units for 2018–2025, counted as unique permit events and assigned to the date on the permit. Annual volume went from 12,050 to 32,126, a 2.67-fold rise and a compound 15.0% a year.

The counting rule is not a detail. Sum Table A2 by APR reporting year instead, as most roundups do, and you get 213,732 — 35,237 units too many, 16.5% of the total — because jurisdictions re-report the same project across reporting years.

A published "over 200,000 California ADU permits" figure is usually that artefact rather than a finding.

Permitting is highly concentrated. The City of Los Angeles alone accounts for 27.8% of the state total; the twenty largest reporters account for 53.7% between them, leaving 82,656 units spread across everywhere else.

ADUs are now a quarter of California’s permitted housing. They went from 9.12% of all housing units permitted and reported to HCD in 2018 to 26.52% in 2024 and 26.12% in 2025.

In 2025 the state permitted 0.89 ADU units for every single-family-detached unit, against 0.26 in 2018.

None of this is visible federally. The Census Building Permits Survey has four structure categories and accessory is not one of them; an ADU created by conversion is an alteration that records no housing units at all.

In 2025 California’s own single-family-detached plus ADU total ran 9,145 units above the federal one-unit series for the state, having run 925 below it in 2018. A permit is not a building. Completions are on the main statistics digest and in the permits-vs-completions study.

33 of 61 figures below are HyreADU calculations (33 hyreadu calculation, 26 agency published, 2 trade / survey estimate).

What an ADU permit statistic can and cannot tell you

Four constraints that change the meaning of every number below.

  • A permit unit is a permission, not a dwelling

    Everything on this page counts permissions issued. Against these 178,495 permit units, jurisdictions have reported 102,356 certificates of occupancy, and the 2018 permit cohort’s observed completion rate is 47.1% after seven years of follow-up.

    Reporting a permit count as a housing count is the most common error in this category, and it is not a small one.

  • The year on the row is not the year of the permit

    Table A2 is filed annually and jurisdictions re-report projects that are still live. The permit date field is what tells you when the permission was issued; the APR year tells you which filing the row appeared in.

    Counting by the wrong one inflates the state total by 35,237 units. 734 ADU permit rows in this extract carry a permit date before 2018, and 50 already carry a 2026 date.

  • Junior ADUs are not a category in this file

    Table A2 has no JADU unit category. A junior accessory dwelling unit appears in this data only where the jurisdiction chose to code it as UNIT_CAT = ADU. So the series neither reliably includes nor reliably excludes JADUs, and no split between the two can be computed from it. See the junior-ADU page.

  • Four jurisdictions cannot be counted, and are named rather than zeroed

    Huntington Beach (495 ADU permits across 7 years and not one completion ever reported), Saratoga, West Sacramento and Arvin have completion fields that are unused across multiple reporting years. Their 1,069 permit units are real; their completion counts are not measurements. Every ratio on this site is published with and without them.

Where these numbers come from

California is the only state in the country with a genuine ADU permit series, and it exists as a side-effect of housing-element law rather than as a statistical program.

Every city and county must file a Housing Element Annual Progress Report; Table A2 of that report lists housing development applications and entitlements with a UNIT_CAT field, and one of its permitted values is ADU. The state publishes the combined file on data.ca.gov. This extract holds 922,102 rows, 281,321 of them coded ADU.

That provenance is a strength and a limitation at once. It is a strength because reporting is a duty, not a survey — 511 jurisdictions appear with at least one ADU permit, which is most of the state.

It is a limitation because the file is a compliance artefact assembled by hundreds of separate agencies with different permit systems, different identifier conventions and different diligence about the completion columns.

Every figure on this page carries one of three labels. HyreADU calculation means we downloaded the file and computed the figure; the method is on the permits-vs-completions study and the number here is read from the same JSON module the study reads, so the two cannot drift.

Agency published means HCD or the Census Bureau printed it. Trade / survey estimate means a named survey. 33 of the 61 figures here are ours, 26 are agency-published and 2 are survey estimates.

If you need to work with these files yourself, the California permit-data directory lists which California jurisdictions publish machine-readable permit data and what each of them actually carries.

The permit series, year by year

Permit units by the date on the permit, alongside the naive count by APR reporting year that most published totals are built from. The gap between the two columns is the double-count.

California ADU permit units: counted properly, and counted naively08,87217,74326,61535,48644,35820182019202020212022202320242025Permit unitsYearDeduplicated by permit dateNaive, by APR reporting yearHCD APR Table A2, retrieved 2026-09-05. Both series are printed in the counting table on this page.
California ADU permit units, deduplicated by permit date against a naive sum by reporting year. HCD APR Table A2, retrieved 2026-09-05. Same numbers as this table.
YearPermit units (deduplicated)Naive, by reporting yearDifferenceADU share of all HCD permitsClass
201812,0509,000-3,0509.12%Agency published count · HyreADU calculation comparison
201912,99215,064+2,07210.31%Agency published count · HyreADU calculation comparison
202013,11616,024+2,90811.22%Agency published count · HyreADU calculation comparison
202121,16324,625+3,46215.19%Agency published count · HyreADU calculation comparison
202226,22431,813+5,58918.49%Agency published count · HyreADU calculation comparison
202329,30935,723+6,41421.05%Agency published count · HyreADU calculation comparison
202431,51539,636+8,12126.52%Agency published count · HyreADU calculation comparison
202532,12641,847+9,72126.12%Agency published count · HyreADU calculation comparison

HCD APR Table A2, retrieved 2026-09-05. Deduplicated totals: 178,495 units. Naive total: 213,732. The difference of 35,237 units is 16.5% of the naive figure. Note that the naive count runs lower in the early years and much higher later — re-reporting accumulates, so the artefact grows with the age of the file.

The 2025 row is not final. 2025 APRs were due 1 April 2026 and HCD states prior-year data are not complete until 30 June; this extract was taken on 2026-09-05, after that date, and 2025 will still move a little as late filings arrive.

What the growth curve actually shows

Annual ADU permitting in California 2.67-folded between 2018 and 2025, from 12,050 units to 32,126 — a compound 15.0% a year. But the curve is not a smooth ramp, and the shape is the interesting part.

Three years are almost flat: 12,050 in 2018, 12,992 in 2019, 13,116 in 2020.

Then two years of very steep growth — 21,163 in 2021 and 26,224 in 2022, an increase of 13,108 units in two years. Then a decelerating climb: 29,309, 31,515, 32,126.

The 2024-to-2025 increase is 1.9%, the smallest year-on-year move in the series apart from the flat opening.

What this page will not do is attribute that shape to a named statute. The temptation is strong — the acceleration sits close to several reform waves — but permit dates lag legislative effective dates by an unmeasured amount, jurisdictions adopt implementing ordinances on their own schedules, and the same years contain a pandemic, an interest-rate cycle and a construction-cost shock.

A correlation between a curve and a bill number is not a causal finding, and we do not have the design that would produce one.

The comparison that is clean sits inside the same file. In 2018 California permitted 0.26 ADU units for every single-family-detached unit. In 2025 it permitted 0.89.

Single-family-detached permitting fell over the period — 45,928 units to 35,424 — while ADU permitting rose, so the ratio moved from both ends.

That is a statement about the composition of Californian housing production, and it does not require anyone to attribute causation.

Permits by jurisdiction: the twenty largest reporters

The distribution is extremely long-tailed. One city accounts for 27.8% of all California ADU permitting; the twentieth-largest reporter is smaller than the largest by a factor of 48.

ADU permit units by jurisdiction, twelve largest reporters, 2018–20250Los Angeles49,556San Diego9,153Unincorporated Los Angeles County5,657Long Beach3,493San José3,337Santa Maria2,554Garden Grove2,477San Francisco2,353Unincorporated San Diego County2,274Oakland1,891Glendale1,777Burbank1,762HCD APR Table A2. Same numbers as the jurisdiction table below.
ADU permit units by jurisdiction, the twelve largest reporters, 2018–2025. HCD APR Table A2, retrieved 2026-09-05.
JurisdictionCountyPermit unitsShare of state totalYears reporting permitsClass
Los AngelesLos Angeles49,55627.8%8Agency published count · HyreADU calculation share
San DiegoSan Diego9,1535.1%8Agency published count · HyreADU calculation share
Unincorporated Los Angeles CountyLos Angeles5,6573.2%8Agency published count · HyreADU calculation share
Long BeachLos Angeles3,4932.0%8Agency published count · HyreADU calculation share
San JoséSanta Clara3,3371.9%8Agency published count · HyreADU calculation share
Santa MariaSanta Barbara2,5541.4%8Agency published count · HyreADU calculation share
Garden GroveOrange2,4771.4%8Agency published count · HyreADU calculation share
San FranciscoSan Francisco2,3531.3%8Agency published count · HyreADU calculation share
Unincorporated San Diego CountySan Diego2,2741.3%8Agency published count · HyreADU calculation share
OaklandAlameda1,8911.1%8Agency published count · HyreADU calculation share
GlendaleLos Angeles1,7771.0%8Agency published count · HyreADU calculation share
BurbankLos Angeles1,7621.0%8Agency published count · HyreADU calculation share
SacramentoSacramento1,6310.9%8Agency published count · HyreADU calculation share
AnaheimOrange1,2920.7%8Agency published count · HyreADU calculation share
RiversideRiverside1,1850.7%8Agency published count · HyreADU calculation share
Unincorporated Santa Barbara CountySanta Barbara1,1440.6%8Agency published count · HyreADU calculation share
Santa AnaOrange1,1200.6%8Agency published count · HyreADU calculation share
Chula VistaSan Diego1,1090.6%8Agency published count · HyreADU calculation share
WestminsterOrange1,0370.6%8Agency published count · HyreADU calculation share
PasadenaLos Angeles1,0370.6%8Agency published count · HyreADU calculation share

HCD APR Table A2, 2018–2025, retrieved 2026-09-05. Counts are agency-published; the share column is ours. Together these twenty jurisdictions account for 95,839 permit units, 53.7% of the state total. The four unusable reporters are excluded from this table and named separately.

Three of the twenty are unincorporated county areas rather than cities — unincorporated Los Angeles County, unincorporated San Diego County and unincorporated Santa Barbara County. County and city rows are not nested: a county row covers only the unincorporated territory, so adding a county to its cities does not double-count.

How concentrated the permitting is

Three tiers, one state. The tail matters because policy discussion about ADUs is largely conducted in the language of the head.

Concentration of California ADU permitting, 2018–202527.8%City of Los Angeles — 49,556 permit units25.9%Jurisdictions 2–20 — 46,283 permit units46.3%Everywhere else in California — 82,656 permit unitsHyreADU calculation on HCD APR Table A2, retrieved 2026-09-05.
Where California’s ADU permit units are: one city, nineteen more, and everywhere else. HyreADU calculation on HCD APR Table A2, retrieved 2026-09-05.
TierPermit unitsShare of state totalClass
City of Los Angeles49,55627.8%HyreADU calculation
Jurisdictions ranked 2–2046,28325.9%HyreADU calculation
Every other reporting jurisdiction82,65646.3%HyreADU calculation
All California178,495100%Agency published total

HyreADU calculation on HCD APR Table A2, retrieved 2026-09-05. 511 jurisdictions reported at least one ADU permit in the window; the median of the top twenty is 1,777 units, and the great majority of reporting jurisdictions are far below that.

Concentration inside a city is a separate and equally strong pattern. In Los Angeles, 53.8% of ADU permits are in the San Fernando Valley and the Gini coefficient across census tracts holding at least one permit is 0.4731 — see the geography study.

Against the federal permit series, year by year

The Census Building Permits Survey is the number the country actually uses to talk about housing production, and it cannot see an accessory dwelling unit. It classifies buildings into four structure types — single-family, two-unit, three-and-four-unit, and five-or-more — and none is accessory.

A detached new-build ADU lands in the single-family cell beside a four-bedroom spec house. A garage conversion is an alteration under Item 434, which records permits and valuation and no housing units at all.

The comparison below sets California’s own single-family-detached-plus-ADU total against the federal one-unit series for the same state and year. It is a HyreADU calculation and it demonstrates the size of the gap; it does not validate either series.

California one-unit-ish permits: the state series against the federal series40,00047,22754,45461,68168,90876,13620182019202020212022202320242025Permit unitsYearHCD: single-family detached + ADUFederal: California 1-unitHyreADU comparison. The two series are not built to the same definition and the gap is the point, not an error in either.
California: the state’s own one-unit-ish permit total against the federal one-unit series, 2018–2025. HCD APR Table A2 and Census Building Permits Survey annual history by state, both retrieved 2026-09-05.
YearHCD ADUHCD single-family detachedHCD SFD + ADUFederal 1-unitDifferenceClass
201811,97845,92857,90658,831-925Agency published counts · HyreADU calculation difference
201912,86543,45256,31758,575-2,258Agency published counts · HyreADU calculation difference
202012,94740,86253,80959,043-5,234Agency published counts · HyreADU calculation difference
202120,84350,98371,82665,890+5,936Agency published counts · HyreADU calculation difference
202225,82639,91465,74063,628+2,112Agency published counts · HyreADU calculation difference
202328,90639,48068,38658,534+9,852Agency published counts · HyreADU calculation difference
202431,00634,97965,98561,143+4,842Agency published counts · HyreADU calculation difference
202531,46035,42466,88457,739+9,145Agency published counts · HyreADU calculation difference

HCD Housing Element APR, Table A2, retrieved 2026-09-05; U.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026), California column, units.

The two series are built to different definitions, cover slightly different universes and are collected by different means.

The difference column is a HyreADU calculation and is a measure of the distance between the two instruments, not an error term for either.

The direction of the difference reverses. In 2018 the state total ran 925 units below the federal one-unit series; by 2025 it ran 9,145 units above. Over the same eight years the federal one-unit line for California moved by -1.9% while California’s ADU permits rose 2.67-fold. Full mechanics on the national-permit-data study.

The words this data uses, precisely

Permit unit
One dwelling unit authorized by a building permit. A single permit can authorize more than one unit, and the ADU rows in Table A2 carry a unit count, so the state total is a count of units rather than of permits.
Permit event
A unique combination of jurisdiction, project identifier and building-permit date. Deduplicating to events is what turns 281,321 ADU rows into 169,249 permit events and prevents the same project being counted in successive annual reports.
APR year
The reporting year of the filing a row appeared in — not the year the permit was issued. Using it as a permit date is the single most common counting error with this file.
UNIT_CAT
Table A2’s unit-category field. Values in this extract: ADU, SFD (single-family detached), SFA (single-family attached), 2 to 4, 5+, MH (mobile home). There is no JADU value.
Tracking identifier
The jurisdiction’s own project identifier, used to join a permit row to a completion row. 15,082 ADU rows (5.4%) carry none and cannot be joined in either direction.
Item 434
The line in the federal Building Permits Survey that collects additions and alterations to residential buildings. It records a permit count and a valuation and carries no housing-unit field, which is why a conversion ADU is federally invisible.

Every figure on this page, with its class

61 figures with geography, date, provenance class and source. 33 HyreADU calculations, 26 agency-published, 2 trade or survey. This is the list the one-third hub gate counts.

StatisticFigureGeographyDateClassSource
ADU permit units dated 201812,050California, 511 reporting jurisdictions2018Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permit units dated 201912,992California, 511 reporting jurisdictions2019Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permit units dated 202013,116California, 511 reporting jurisdictions2020Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permit units dated 202121,163California, 511 reporting jurisdictions2021Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permit units dated 202226,224California, 511 reporting jurisdictions2022Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permit units dated 202329,309California, 511 reporting jurisdictions2023Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permit units dated 202431,515California, 511 reporting jurisdictions2024Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permit units dated 202532,126California, 511 reporting jurisdictions2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permit units, whole window178,495California, 511 reporting jurisdictions2018–2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
Table A2 rows in the extract922,102California, all unit categories2018–2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
Rows with UNIT_CAT = ADU281,321California, 511 reporting jurisdictions2018–2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
Unique ADU permit events after deduplication169,249California, 511 reporting jurisdictions2018–2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
Jurisdictions reporting at least one ADU permit511California2018–2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
Single-family-detached permit units for comparison35,424California, 511 reporting jurisdictions2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
All housing permit units reported to HCD120,455California, 511 reporting jurisdictions2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
California 1-unit permit units, federal series, 201858,831California2018Agency publishedU.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026)
California 1-unit permit units, federal series, 201958,575California2019Agency publishedU.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026)
California 1-unit permit units, federal series, 202059,043California2020Agency publishedU.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026)
California 1-unit permit units, federal series, 202165,890California2021Agency publishedU.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026)
California 1-unit permit units, federal series, 202263,628California2022Agency publishedU.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026)
California 1-unit permit units, federal series, 202358,534California2023Agency publishedU.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026)
California 1-unit permit units, federal series, 202461,143California2024Agency publishedU.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026)
California 1-unit permit units, federal series, 202557,739California2025Agency publishedU.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026)
Structure categories in the federal survey4United Statescurrent methodologyAgency publishedCensus BPS methodology — none of the four is accessory
Housing units the federal survey records for a conversion ADU0United Statescurrent methodologyAgency publishedCensus BPS Item 434 carries no housing-unit field
ADU permit units, unincorporated San Diego County1,617Unincorporated San Diego County6th cycle to 2025Agency publishedHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05
Growth in annual permit units, 2018 to 20252.67×California, 511 reporting jurisdictions2018→2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Compound annual growth in permit units15.0%California, 511 reporting jurisdictions2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Permit units added between 2020 and 2022+13,108California, 511 reporting jurisdictions2020→2022HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Change in annual permit units, 2024 to 2025+1.9%California, 511 reporting jurisdictions2024→2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
ADU share of all HCD-reported permit units, 20189.12%California, 511 reporting jurisdictions2018HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
ADU share of all HCD-reported permit units, 202426.52%California, 511 reporting jurisdictions2024HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
ADU share of all HCD-reported permit units, 202526.12%California, 511 reporting jurisdictions2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
ADU permits relative to single-family-detached permits, 20250.89×California, 511 reporting jurisdictions2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Same ratio in 20180.26×California, 511 reporting jurisdictions2018HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Permit units double-counted by a naive APR-reporting-year sum35,237California, 511 reporting jurisdictions2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Share of a naive permit total that is double-counted16.5%California, 511 reporting jurisdictions2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Naive APR-year permit total, for contrast213,732California, 511 reporting jurisdictions2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
ADU rows carrying no tracking identifier15,082 (5.4%)California, 511 reporting jurisdictions2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Permit units reported by the four unusable reporters1,069Huntington Beach, Saratoga, West Sacramento, Arvin2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Permit units after excluding those four177,426California, 511 reporting jurisdictions2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Los Angeles share of all California ADU permit units27.8%City of Los Angeles2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Top-20 jurisdictions’ share of all California ADU permit units53.7%California2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Permit units outside the top twenty jurisdictions82,656California2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Median permit units among the top twenty1,777California2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
HCD single-family-detached plus ADU minus the federal 1-unit series, 2018-925 unitsCalifornia2018HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 against U.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026) · national-permit-data study
HCD single-family-detached plus ADU minus the federal 1-unit series, 2019-2,258 unitsCalifornia2019HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 against U.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026) · national-permit-data study
HCD single-family-detached plus ADU minus the federal 1-unit series, 2020-5,234 unitsCalifornia2020HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 against U.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026) · national-permit-data study
HCD single-family-detached plus ADU minus the federal 1-unit series, 2021+5,936 unitsCalifornia2021HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 against U.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026) · national-permit-data study
HCD single-family-detached plus ADU minus the federal 1-unit series, 2022+2,112 unitsCalifornia2022HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 against U.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026) · national-permit-data study
HCD single-family-detached plus ADU minus the federal 1-unit series, 2023+9,852 unitsCalifornia2023HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 against U.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026) · national-permit-data study
HCD single-family-detached plus ADU minus the federal 1-unit series, 2024+4,842 unitsCalifornia2024HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 against U.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026) · national-permit-data study
HCD single-family-detached plus ADU minus the federal 1-unit series, 2025+9,145 unitsCalifornia2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 against U.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026) · national-permit-data study
HCD all-permit total over the federal all-structure total, 20251.160×California2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 against U.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026) · national-permit-data study
Federal 1-unit series change, 2018 to 2025, while ADU permits went up 2.67×-1.9%California2018→2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 against U.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026) · national-permit-data study
Permit rows dated before the reporting window734California, 511 reporting jurisdictionspre-2018 datesHyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Permit rows already dated 202650California, 511 reporting jurisdictions2026 datesHyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Median declared permit valuation, Los Angeles$40,000City of Los Angeles2017–2023 issuedHyreADU calculationMunicipal permit harvests 29–30 August 2026, computed 2026-09-05 · permit-valuation study
Median declared permit valuation, unincorporated Marin$156,800Marin County (unincorporated)2014–2026 issuedHyreADU calculationMunicipal permit harvests 29–30 August 2026, computed 2026-09-05 · permit-valuation study
New California ADUs that are one-bedroom61%California, 2018–19 owner surveyApr 2021Trade / survey estimateChapple, Ganetsos and Lopez, CCI, 22 April 2021
New California ADUs that are studios18%California, 2018–19 owner surveyApr 2021Trade / survey estimateChapple, Ganetsos and Lopez, CCI, 22 April 2021

HyreADU calculation — computed by HyreADU from a primary file, method on the linked study. Agency published — printed by HCD or the Census Bureau. Trade / survey estimate — a named survey estimate. HCD and RHNA extracts retrieved 2026-09-05.

Permit figures we will not repeat

  • An inflated California permit total taken from a naive sum

    Summing Table A2 by reporting year gives 213,732 permit units for 2018–2025 against a deduplicated 178,495. Both figures come from the same official file; only one of them counts each permission once. If a published total is above about 180,000 for this window, check the counting rule before citing it.

  • A national ADU permit count

    There is no such number and no federal instrument that could produce one without a change to the survey form. Anything presented as a national ADU permit count is either a state series relabelled or an extrapolation from California, which assumes the rest of the country has California’s statute. It does not.

  • A JADU-versus-ADU split derived from this file

    Table A2 has no junior-ADU category. Junior units appear only where a jurisdiction chose to code them as ADU, so the file supports neither a JADU count nor a clean ADU count net of JADUs. Any split quoted from this source is invented.

  • A jurisdiction league table dressed up as performance

    The counts below are volume, and volume tracks population, housing stock and lot geometry before it tracks policy. A city with 1,037 permits is not failing relative to one with 49,556.

    Per-capita or per-parcel normalisation would be the right instrument and this desk has not computed one it is prepared to defend, so it does not publish one.

Citing these figures

Cite the permits-vs-completions study rather than this digest where you can: the counting rule, the sensitivity checks and the unusable-reporter classification live there, and the figure travels better with them attached.

For anything labeled HyreADU calculation, attribute it as "HyreADU analysis of the California HCD Housing Element Annual Progress Report, Table A2, retrieved 5 September 2026".

For anything labeled Agency published, cite HCD or the Census Bureau and link the table, not an article about the table. Corrections go on the page with a dated note: hello@hyreadu.com.

Questions

How many ADU permits does California issue each year?
32,126 ADU permit units were dated 2025, the most recent full year in this extract, and 31,515 were dated 2024. Over 2018–2025 the total is 178,495 units across 511 reporting jurisdictions. The 2025 figure will move slightly as late annual reports arrive.
Why do other sites report a much higher California ADU permit total?
Almost always because they summed Table A2 by APR reporting year rather than by the date on the permit. Jurisdictions re-report live projects in successive annual filings, so the naive sum counts the same permission more than once: 213,732 units against a deduplicated 178,495, an overstatement of 35,237 units, or 16.5%. Both numbers come out of the same official file, which is exactly why the counting rule has to be stated.
Which city issues the most ADU permits in California?
The City of Los Angeles, by a very large margin: 49,556 permit units 2018–2025, 27.8% of the state total. San Diego is second (9,153), unincorporated Los Angeles County third (5,657), Long Beach fourth (3,493) and San José fifth (3,337). This is a volume ranking, not a performance ranking.
What share of California housing permits are ADUs?
26.12% in 2025 and 26.52% in 2024, up from 9.12% in 2018. The denominator is every unit category HCD collects — single-family detached and attached, ADU, two-to-four, five-plus and mobile home — so this is the ADU share of all permitted housing production in the state, not just of low-density production.
Are there national ADU permit statistics?
No, and the federal instrument cannot produce them as currently designed. The Census Building Permits Survey classifies buildings into four structure categories, none of them accessory, and no item asks whether a unit is accessory to another. An ADU created by conversion enters as an alteration under Item 434, which carries no housing-unit count, so it contributes zero units to the national series. A detached new-build ADU does enter the units series, but indistinguishably from a large single-family house. The two errors run in opposite directions and neither is measured. See the national-permit-data study.
Do these figures include junior ADUs?
Inconsistently, and there is no way to tell from the file. Table A2 has no JADU unit category, so a junior accessory dwelling unit appears here only where the jurisdiction coded it as UNIT_CAT = ADU. That means the series neither reliably includes nor reliably excludes JADUs, and no split can be computed from it. Los Angeles’s own permit records do carry a JADU flag, which is why a JADU-specific figure is possible for that city and not for the state.
What is a permit unit worth in declared valuation terms?
Declared valuations vary enormously by jurisdiction and by ADU type. Median declared permit valuation runs from $40,000 in the City of Los Angeles to $156,800 in unincorporated Marin. Declared valuation is what an applicant tells a building department, usually for fee calculation, and it excludes design fees, utility connections, permit fees, financing and landscaping. It is not construction cost. See the permit-valuation study.
How long does it take to get one of these permits issued?
In the City of Los Angeles the median is 162 days from application to issuance; in San Francisco 445 days from filed to issued; in unincorporated Marin 175 days from received to issued. None of those is the statutory 60-day clock, which runs from a completed application. Full treatment on ADU approval time statistics and the permit-times study.
How current is this data and when does it change?
The extract was retrieved 2026-09-05; HCD’s published file was last updated 4 September 2026. 2025 annual progress reports were due 1 April 2026 and HCD does not treat a prior year as complete until 30 June, so the 2025 row will continue to firm up. We re-cut the page against each new HCD publication rather than editing figures in place.
Can permit counts tell me whether ADUs are being built?
Only partly, which is why we publish both sides. Against these permit units, jurisdictions have reported 102,356 certificates of occupancy for 2018–2025, and the 2018 permit cohort’s observed completion rate is 47.1% after seven years. Unmatched permits include projects still building, projects abandoned, and finished units whose certificate was never reported — so that rate is a floor on completion, not a ceiling on abandonment.

Written and audited by

HyreADU Research Desk

Primary-source research, data analysis and fact checking

We are a research desk, not a builder. We read the permit extract, the statute, the HCD return or the fee schedule ourselves, and publish each figure with its source and retrieval date.

Where a number cannot be traced to a primary source, we leave it out and say what we could not verify. Our store-based claims cover California only.

CA
the only state this desk will make store-based claims about
5
jurisdictions with extracted ADU permit evidence
735
CSLB-verified companies in the California store
0
national claims from a one-state store

How this desk works

  • Primary sources only. Permit counts come from the city or county that issued the permit. Production counts come from HCD’s Annual Progress Report. Rents come from HUD or the Census. We do not cite an article that cites a source; we download the source and compute the figure ourselves.
  • This is a California site. The company store is 734 California firms and one New Mexico firm. Permit evidence exists for five named jurisdictions: Los Angeles, San Francisco, Sacramento, San José and unincorporated Marin. A number from that store is titled to those places, never to the United States.
  • A permit is not a completion, and a license is not an ADU grade. California licenses no ADU classification. Being named on an ADU permit is evidence of engagement in that jurisdiction, not of quality, completion, or work anywhere else. Owner-builder permits are excluded from contractor counts.
  • Calculation is labeled as calculation. Figures we derive are never presented as something HCD, HUD, the Census or a city published. Terner Center research is cited as Terner’s, never restated as ours.
  • We do not design, permit or build ADUs, and we take no payment for placement, ranking or a favorable mention. Pages that look like rankings are not: they publish public-record counts and let the reader decide.
  • Nothing here is legal, tax or financial advice. Zoning, underwriting and appraisal practice vary by jurisdiction, lender and appraiser. The useful next step on a specific lot is the planning counter and a licensed professional.

Data as of HCD APR Table A2 retrieved 2026-09-05; HCD last updated 4 September 2026 (15:44 UTC); Census BPS annual 2025 release 14 May 2026; RHNA Progress Report retrieved 2026-09-05. Authorship on this site is organizational: the analysis belongs to the desk rather than to a named individual, and we do not publish credentials we do not hold.

Our editorial policy sets out how we source, date and correct what we publish.

Sources & retrieval dates

  1. California HCD — Housing Element Annual Progress Report, Table A2 , 922,102 rows in this extract, 281,321 coded UNIT_CAT = ADU, resolving to 169,249 unique permit events. HCD last updated 4 September 2026. Retrieved 2026-09-05.
  2. California HCD — Table A2 CSV download , The file itself, so every count on this page can be reproduced. Retrieved 2026-09-05.
  3. California HCD — APR data dashboard , HCD’s own visualisation of the same file, useful as a cross-check on any figure here. Retrieved 2026-09-05.
  4. California HCD — Annual Progress Report FAQ , HCD’s statement that prior-year data are not complete until 30 June, and its guidance to jurisdictions on completing Table A2. Retrieved 2026-09-05.
  5. U.S. Census Bureau — Building Permits Survey, annual history by state and territory , California column, units. U.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026). The federal one-unit series used in the comparison table. Retrieved 2026-09-05.
  6. U.S. Census Bureau — Building Permits Survey methodology , The four structure categories, and the Item 434 definition that leaves conversion ADUs with no unit count. Retrieved 2026-09-05.
  7. California HCD — RHNA Progress Report, 6th cycle , Cycle-to-date permitted units by jurisdiction, used for the housing-supply cross-reference. Retrieved 2026-09-05.
  8. Terner Center — “Reaching California’s ADU Potential” , Contemporaneous APR snapshots for 2018 and 2019. Later APRs backfill earlier permit dates, which is why our 2018 event-year count is higher than Terner’s; the discrepancy is a property of the file, not a disagreement. Retrieved 2026-09-05.

A permit is a permission, not a building

178,495 permit units, 102,356 certificates. Both numbers are real and they answer different questions. Read the production study before quoting either.

Read the study All statistics digests

HyreADU does not design, permit or build accessory dwelling units. These statistics are informational and are not legal, tax, financial or construction advice. Every figure here describes California; there is no national ADU permit series and nothing on this page is scaled into one.

A permit unit is a permission, not a completed dwelling. Jurisdiction counts are volume, not performance. Table A2 is a compliance artefact assembled by hundreds of agencies and its completion fields are unusable in four named jurisdictions.