HyreADU

Statistics

ADU statistics

48 of 68 figures on this page are HyreADU calculations, each traced to the study that produced it. The rest are labeled as agency-published or as trade estimates. Nothing here is a national ADU statistic derived from Californian data.

Updated September 2026 · Data as of HCD APR Table A2 retrieved 2026-09-05 (HCD last updated 4 September 2026); LADBS pi9x-tg5x retrieved 2026-09-05, feed rowsUpdatedAt 2026-08-31; DataSF i98e-djp9 data_as_of 2026-09-04; Marin mkbn-caye rows updated 2026-09-04; RHNA Progress Report retrieved 2026-09-05; Census BPS annual 2025 release 14 May 2026

Written by HyreADU Research Desk Primary-source research and data analysis

Audited by HyreADU Research Desk Provenance and figure-ledger audit

48 of 68 figures are HyreADU calculations 48 HyreADU calculation · 16 Agency published · 4 Trade / survey estimate. Below one third, the hub rule says publish the study instead of a digest.
178,495 California ADU permit units, 2018–2025 102,356 certificates of occupancy in the same window — a cumulative ratio of 57.3%. HCD APR Table A2, deduplicated by tracking identifier across 511 jurisdictions.
26.1% of every housing unit permitted in California in 2025 was an ADU Up from 9.1% in 2018. HyreADU calculation on HCD APR Table A2; the denominator is every unit category HCD collects.

The short version

The strongest ADU statistics in the United States are Californian, because California is the only state that collects them. Jurisdictions reported 178,495 accessory-dwelling-unit building-permit units and 102,356 certificates of occupancy to the Department of Housing and Community Development for 2018–2025 — a cumulative ratio of 57.3%.

Annual permit volume went from 12,050 to 32,126 units, a 2.67-fold rise, and ADUs went from 9.1% of all housing units permitted in the state to 26.1%.

A permit is not a building. Among 81,853 matched projects the median permit-to-certificate lag is 1 year, 78.9% finish within one and 93.9% within two — and the 2018 permit cohort’s observed completion rate is still only 47.1% after seven years of follow-up.

Unmatched is not the same as unbuilt, and this page never treats it as such.

Two clocks, measured separately. In the City of Los Angeles the median from application to permit issuance is 162 days (IQR 79–301); the median from issuance to certificate of occupancy is 499 days on a censored-aware estimate, against 367 days if you look only at the permits that finished.

Add the two medians and a Los Angeles ADU is a 1.8-year undertaking from paperwork to keys — a HyreADU calculation across two studies, and an order-of-magnitude figure, not a schedule.

Size is chosen by the statute, not by the household. The median new detached ADU permitted in Los Angeles declares 920 square feet, 635 permits declare exactly 1,200 — the statutory ceiling — and 32.5% come in at or under 750 square feet, the size at or below which no impact fee may be charged.

There is no national ADU count, and this page does not manufacture one. The federal permit survey has four structure categories and accessory is not among them; an ADU made by conversion enters the national units series as zero units.

48 of 68 figures below are HyreADU calculations (48 hyreadu calculation, 16 agency published, 4 trade / survey estimate). Every one links to the study that produced it.

Read this before you quote anything here

Five constraints sit above the tables because they change what every figure on this page is allowed to mean. A statistic quoted without them is a different statistic.

  • This page is California-heavy, and it is labeled that way on every row

    HCD’s Annual Progress Report is a Californian instrument. The Los Angeles figures are the City of Los Angeles, a single jurisdiction of about four million people inside a state of forty.

    Neither is a national ADU statistic, and neither is scaled into one anywhere on this page.

    Where a national figure exists at all it is federal or from a named national study, and it is marked as such.

    The how-many-ADUs study sets out why the honest national answer is an evidence ladder rather than a number.

  • A permit is not a completion, and a completion ratio is not a completion rate

    Dividing 102,356 certificates dated 2018–2025 by 178,495 permits dated 2018–2025 answers a production-accounting question — how many finished units were recorded in the window — not a project question.

    Completions recorded in any year mostly belong to earlier permit cohorts. The cohort follow-up in the permits-vs-completions study is the right instrument for a project question, and it puts the 2018 cohort’s observed completion rate at 47.1% after seven years.

  • Unmatched is not unbuilt

    46,944 of 114,651 permit units from 2018–2023 (40.9%) have no matching completion row.

    That set contains units still under construction, abandoned projects, finished units whose certificate was never reported, and projects whose tracking identifier changed between the permit row and the completion row.

    Reporting it as an abandonment rate would be a fabrication with a real number attached to it.

  • Declared permit valuation is not construction cost

    The valuation figures below are what an applicant declared to a building department, usually for fee calculation. They exclude design fees, utility connections, permit fees themselves, financing, landscaping and the owner’s own labor, and jurisdictions apply different valuation tables.

    A median declared valuation of $40,000 in Los Angeles is a fact about permit paperwork. It is not what an ADU costs. The permit-valuation study is explicit about the gap.

  • No figure here is advice, and none of it is a forecast for your lot

    A median is a description of a distribution that has already happened. Your parcel has a zone, a slope, a sewer lateral, a panel size, a fire-hazard classification and a plan checker.

    HyreADU does not design, permit or build accessory dwelling units, and nothing on this page should be read as legal, tax, financial or construction advice.

Read the provenance, not just the number

Most ADU statistics circulating online are a chain of citation that terminates in a builder brochure.

A figure gets quoted by a trade blog, which is quoted by a news site, which is quoted by a marketing page, and by the fourth hop the original method — a survey of ninety owners, a single city, a year now half a decade old — has fallen off. The number survives; the thing that made it meaningful does not.

The spine of this page is therefore provenance rather than volume. Every figure in every table carries one of three labels, and the label is not decorative — it tells you what kind of claim you are allowed to build on it.

HyreADU calculation — HyreADU downloaded a primary file and computed the figure. The method lives on the linked study page, and the number on this page is read from the same JSON module the study reads, so the two cannot drift apart. 48 of the 68 figures here are of this kind.

Agency published — an agency printed this number: HCD, the Census Bureau, or a city building department. We cite the table, never an article about the table. 16 figures.

Trade / survey estimate — a survey or an industry estimate. Useful, labeled as what it is, and never restated as a measurement of every ADU in California. 4 figures, and each names the researcher.

The distinction between the second and third labels matters more than it looks. HCD’s permit counts are a statutory reporting obligation on 511 jurisdictions. Freddie Mac’s 1.4 million is a text search of MLS listing descriptions going back to the late 1990s. Both are real work. Only one of them is a count.

The twelve figures most worth knowing

Each of these is expanded, sourced and dated in the tables below, and each links back to the study that produced it. The class label is part of the figure.

178,495 California ADU permit units, 2018–2025 Agency published · HCD APR Table A2
102,356 California ADU certificates of occupancy, same window Agency published · HCD APR Table A2
57.3% cumulative completions per permit HyreADU calculation · not a project completion rate
26.1% of all California housing permits in 2025 were ADUs HyreADU calculation · from 9.1% in 2018
162 days median application to permit issuance, Los Angeles HyreADU calculation · IQR 79–301 days
499 days median issuance to certificate of occupancy, Los Angeles HyreADU calculation · censored-aware; 367 days if you count only finished permits
920 sq ft median floor area, new detached ADU permit, Los Angeles HyreADU calculation · IQR 670–1,194
635 Los Angeles permits declaring exactly 1,200 sq ft — the statutory ceiling HyreADU calculation · the most common single value in the distribution
$40,000 median declared permit valuation, Los Angeles HyreADU calculation · declared valuation, not construction cost
52.1% of Long Beach’s cycle-to-date permitted housing is ADUs HyreADU calculation · 5.5% in Fresno
53.8% of Los Angeles ADU permits are in the San Fernando Valley HyreADU calculation · Gini 0.4731 across 1,142 tracts
1.4 million US properties whose MLS text mentioned an accessory unit since the late 1990s Trade / survey estimate · Freddie Mac 2020 · properties, not units, not a stock count

The two clocks are separate measurements of consecutive segments and only the sum is a HyreADU cross-study calculation: 162 days + 499 days = 661 days, about 1.8 years in the City of Los Angeles.

Production: permits and completions, 2018–2025

Permits and completions are the backbone series for the entire category. California jurisdictions report building permits and certificates of occupancy to HCD under the Housing Element annual reporting requirement, and Table A2 carries a UNIT_CAT field with an explicit ADU value.

The permit and completion columns are agency-published counts of unique events, deduplicated by tracking identifier; the ratio columns are ours. Full method and the four unusable reporters on the permits-vs-completions study.

California ADU permits and completions by event year, 2018–202506,81113,62120,43227,24334,05420182019202020212022202320242025UnitsEvent year on the permit or certificatePermitsCompletionsHCD Annual Progress Report Table A2, deduplicated by tracking identifier. Retrieved 2026-09-05. Same numbers as the productiontable below.
California ADU permit units and reported completions by event year, 2018–2025. HCD Annual Progress Report Table A2, retrieved 2026-09-05. Chart and table carry the same numbers.
YearPermit unitsCompletionsSame-year ratioCumulative ratioADU share of all HCD permitsClass
201812,0503,18626.4%26.4%9.1%Agency published counts · HyreADU calculation ratios
201912,9925,95745.9%36.5%10.3%Agency published counts · HyreADU calculation ratios
202013,1168,06561.5%45.1%11.2%Agency published counts · HyreADU calculation ratios
202121,16310,14747.9%46.1%15.2%Agency published counts · HyreADU calculation ratios
202226,22414,04353.6%48.4%18.5%Agency published counts · HyreADU calculation ratios
202329,30917,67660.3%51.4%21.1%Agency published counts · HyreADU calculation ratios
202431,51520,65265.5%54.5%26.5%Agency published counts · HyreADU calculation ratios
202532,12622,63070.4%57.3%26.1%Agency published counts · HyreADU calculation ratios

Permit and completion counts are agency-published. Every ratio column is a HyreADU calculation from those two counts. Statewide totals: 178,495 permit units, 102,356 completions, 57.3% cumulative. Excluding the four jurisdictions whose completion fields are unusable — Huntington Beach, Saratoga, West Sacramento and Arvin — the figures are 177,426, 102,352 and 57.7%. Retrieved 2026-09-05.

A naive sum by APR reporting year rather than by the date on the permit double-counts 35,237 permit units, 16.5% of a naive 213,732-unit total. Roundups that report "over 200,000 California ADU permits" are usually reporting that artefact.

What happens to a permit after it is issued

The single most misused ADU statistic is a permit count read as a housing count. HCD’s file supports a better question, because a project can be followed from its permit row to its completion row on the jurisdiction’s own tracking identifier.

ADUs as a share of all housing permits reported to HCD, 2018–20250.05.611.216.922.528.120182019202020212022202320242025Per cent of all HCD-reported permit unitsYearADU share of HCD-reported permitsHyreADU calculation on HCD APR Table A2. The denominator is every unit category HCD collects, not just single-family.
ADUs as a share of all housing units permitted in California and reported to HCD, 2018–2025. HyreADU calculation on HCD APR Table A2, retrieved 2026-09-05. Same values as the production table.

Among 81,853 matched projects, the median lag from permit to certificate is 1 year. 29.4% are recorded complete in the same calendar year as the permit, 78.9% within one year, 93.9% within two. The distribution has a long right tail: 4,974 matched projects took three years or more.

Follow permit cohorts instead and the picture changes again. The 2018 cohort, with seven years of follow-up, has an observed completion rate of 47.1%; 40.0% were complete by the end of the second year after permit.

The 2022 cohort is at 62.4% with three years of follow-up. Younger cohorts look worse purely because they have had less time, which is why a cohort table is the only fair way to present this and a single "completion rate" headline is not.

Unmatched is not unbuilt. 40.9% of 2018–2023 permit units have no matching completion row. Some of those units are standing and occupied today, with the certificate reported under a different identifier or not reported at all.

We publish the observed match rate, name what it contains, and refuse to convert it into an abandonment statistic.

The one place the underlying question can be seen directly is Los Angeles, where the building department publishes an issue date and a certificate date on the same row: there, 15.3% of the ADU permits issued in 2020 still have no certificate and no permit final, 6.2 years on.

Two very different instruments therefore agree on the shape of the thing: a substantial minority of issued ADU permits do not become finished ADUs on any timescale a homeowner would recognize.

That is the most important sentence on this page, and it is the reason we do not print a permit count as a housing count.

Permit cohorts followed to completion

Each row follows the ADU permit units dated to one year and asks how many have a matching completion row today. Follow-up length differs by row, so the rows are not comparable to one another as performance measures — only as a maturing series.

Permit yearFollow-up (years)Permit unitsMatched unitsObserved rateComplete by year 2Class
2018712,0745,68747.1%40.0%HyreADU calculation
2019613,1058,03661.3%53.2%HyreADU calculation
2020513,0758,13862.2%55.7%HyreADU calculation
2021421,18412,73160.1%53.5%HyreADU calculation
2022326,27016,39362.4%57.3%HyreADU calculation
2023228,94316,72257.8%57.8%HyreADU calculation
2024131,09314,49846.6%46.6%HyreADU calculation
2025031,6145,08816.1%16.1%HyreADU calculation

HyreADU calculation on HCD APR Table A2, retrieved 2026-09-05. Matching is on the jurisdiction’s own project identifier; 15,082 ADU rows (5.4%) carry no identifier at all and cannot be matched in either direction. The 2025 row has zero years of follow-up and is printed only so the series is complete.

Full method, the identifier-join limitations and the treatment of the four unusable reporters are on the permits-vs-completions study.

Where the permits are: the twenty largest reporters

ADU production in California is concentrated. The City of Los Angeles alone accounts for 27.8% of every ADU permit unit reported statewide since 2018, and the twenty jurisdictions below account for 53.7% of them between them.

The completion ratio column is a reporting-quality signal as much as a construction signal, and this table is emphatically not a ranking.

Cumulative completions per ADU permit, twelve largest reporters0Los Angeles59.6%San Diego29.1%Unincorporated Los Angeles County51.3%Long Beach78.6%San José63.1%Santa Maria65.7%Garden Grove61.6%San Francisco71.1%Unincorporated San Diego County66.1%Oakland64.6%Glendale73.7%Burbank53.5%HyreADU calculation on HCD APR Table A2. A completion ratio is a reporting artefact as much as aconstruction outcome, and is never a quality score. Same numbers as the jurisdiction table.
Cumulative completions per ADU permit, the twelve largest reporting jurisdictions. HyreADU calculation on HCD APR Table A2, retrieved 2026-09-05.
JurisdictionCountyPermit unitsCompletionsCompletions per permitClass
Los AngelesLos Angeles49,55629,52959.6%Agency published counts · HyreADU calculation ratio
San DiegoSan Diego9,1532,66729.1%Agency published counts · HyreADU calculation ratio
Unincorporated Los Angeles CountyLos Angeles5,6572,90351.3%Agency published counts · HyreADU calculation ratio
Long BeachLos Angeles3,4932,74578.6%Agency published counts · HyreADU calculation ratio
San JoséSanta Clara3,3372,10463.1%Agency published counts · HyreADU calculation ratio
Santa MariaSanta Barbara2,5541,67765.7%Agency published counts · HyreADU calculation ratio
Garden GroveOrange2,4771,52561.6%Agency published counts · HyreADU calculation ratio
San FranciscoSan Francisco2,3531,67371.1%Agency published counts · HyreADU calculation ratio
Unincorporated San Diego CountySan Diego2,2741,50266.1%Agency published counts · HyreADU calculation ratio
OaklandAlameda1,8911,22164.6%Agency published counts · HyreADU calculation ratio
GlendaleLos Angeles1,7771,30973.7%Agency published counts · HyreADU calculation ratio
BurbankLos Angeles1,76294353.5%Agency published counts · HyreADU calculation ratio
SacramentoSacramento1,6311,03263.3%Agency published counts · HyreADU calculation ratio
AnaheimOrange1,29280262.1%Agency published counts · HyreADU calculation ratio
RiversideRiverside1,18573762.2%Agency published counts · HyreADU calculation ratio
Unincorporated Santa Barbara CountySanta Barbara1,14430726.8%Agency published counts · HyreADU calculation ratio
Santa AnaOrange1,12070462.9%Agency published counts · HyreADU calculation ratio
Chula VistaSan Diego1,10955149.7%Agency published counts · HyreADU calculation ratio
WestminsterOrange1,03776774.0%Agency published counts · HyreADU calculation ratio
PasadenaLos Angeles1,03741840.3%Agency published counts · HyreADU calculation ratio

HCD APR Table A2, 2018–2025, retrieved 2026-09-05. Counts are agency-published; the ratio is ours. Four jurisdictions are excluded from every table on this page as unusable reporters — Huntington Beach (495 ADU permits, zero completions ever reported), Saratoga, West Sacramento and Arvin. They are named rather than silently counted as zero production.

A low ratio can mean slow construction, a reporting practice that never fills the completion field, or an identifier that changed. It cannot be read as a jurisdiction’s competence. The permits-vs-completions study sets out the four rules used to classify a reporter as unusable.

The two clocks: approval, then construction

"How long does an ADU take" is two questions with two different datasets behind them. The first clock runs from application to permit issuance and is measurable in three California jurisdictions that publish both dates.

The second runs from issuance to certificate of occupancy and is measurable in exactly one, Los Angeles, which publishes an issue date and a certificate date on the same permit row.

Medians throughout, never means, and the interquartile range beside every median because these distributions are strongly right-skewed.

Four HyreADU series at a glanceLA: application → issued162 daysLA: issued → certificate499 daysLA valuation, garage vs not$80,000CA permits per year32,126Each panel is drawn from the table on this page that carries the same numbers. Panels are not on a shared scale.
Four HyreADU series: the two Los Angeles clocks by year, declared valuation by ADU type, and California permit volume. LADBS pi9x-tg5x, DataSF i98e-djp9, Marin mkbn-caye and HCD APR Table A2, all retrieved 2026-09-05.
ClockJurisdictionMedianIQRnWindowClass
Application → issuedCity of Los Angeles162 days79–301 days27,1882020–2026HyreADU calculation
Filed → issuedCity and County of San Francisco445 days276–707 days1,7132015–2026HyreADU calculation
Received → issuedMarin County (unincorporated)175 days105–308 days4722018–2026HyreADU calculation
Issued → certificate of occupancyCity of Los Angeles499 days292–1066 days39,2782020–2026HyreADU calculation
Issued → certificate, finished permits onlyCity of Los Angeles367 days238–563 days24,9722020–2026HyreADU calculation

HyreADU calculations on municipal open data, retrieved 2026-09-05. The issuance-to-certificate median is a Kaplan-Meier estimate that keeps the 14,306 permits which have not completed inside the calculation; the finished-permits-only row is printed beside it because it is the number a builder’s own records would produce, and it is roughly four months shorter for a reason that has nothing to do with building faster.

Neither clock is the statutory 60 days. Government Code § 66317 runs 60 days from a completed application, and none of these extracts marks the completeness determination, so applicant delay, fee payment and back-check cycles all sit inside the median.

A median above 60 days is not by itself a finding that a city missed the shot clock. Full treatment on the permit-times study and the construction-duration study.

Construction time by what is actually being built

The permit type is the closest thing the Los Angeles data has to a construction method. A new-construction permit is a detached ADU built from the ground up; an alteration permit is usually a garage or interior conversion. The gap between them is five months at the median.

New construction (detached ADU)564 days
25% within a year · n = 10,612
Addition (attached ADU)528 days
31% within a year · n = 12,227
Alteration/repair (conversion)419 days
45% within a year · n = 16,438
What the permit describesMedian, issued → certificateIQRWithin 1 yearWithin 2 yearsnClass
New construction (detached ADU)564 days365–1058 days25%62%10,612HyreADU calculation
Addition (attached ADU)528 days325–1121 days31%63%12,227HyreADU calculation
Alteration/repair (conversion)419 days230–999 days45%68%16,438HyreADU calculation
Junior ADU (JADU)387 days212–908 days47%70%3,778HyreADU calculation
Standard ADU509 days301–1086 days34%65%35,500HyreADU calculation

HyreADU calculation on LADBS resource pi9x-tg5x, retrieved 2026-09-05, observation window closing 2026-08-31. Kaplan-Meier medians. City of Los Angeles only.

Junior ADUs finish fastest of all — median 387 days against 509 days for a standard ADU — which is what you would expect of a unit created inside an existing bedroom footprint. See the construction-duration study.

Size: the statute is choosing the number

The floor-area distribution of new detached ADU permits in Los Angeles is not shaped like a distribution of household needs.

It has hard modes sitting on the numbers written into the Government Code, with a cliff immediately above each one. 635 permits declare exactly 1,200 square feet — the statutory ceiling for a detached ADU under Gov. Code § 66314(a)(5) — and 1,061 sit in the last five square feet below it. Only 12.5% go above.

MeasureValueWhat the number is anchored toClass
Median permitted floor area920 sq ftNo statutory anchor — the middle of the distributionHyreADU calculation
25th percentile670 sq ftBelow the 750 sq ft impact-fee thresholdHyreADU calculation
75th percentile1,194 sq ftSix square feet under the 1,200 sq ft ceilingHyreADU calculation
10th / 90th percentile460 / 1,343 sq ftThe tailsHyreADU calculation
Permits declaring exactly 1,200 sq ft635Gov. Code § 66314(a)(5) detached ceilingHyreADU calculation
Permits declaring 1,195–1,200 sq ft1,061The last five feet under the ceilingHyreADU calculation
Permits declaring exactly 800 sq ft254The floor a local ordinance may not zone belowHyreADU calculation
Share at or under 750 sq ft32.5%Gov. Code § 66311.5 — no impact fee at or below 750 sq ftHyreADU calculation
Share between 750 and 800 sq ft10.4%Immediately above the fee-free thresholdHyreADU calculation
Share above 1,200 sq ft12.5%Above the detached ceilingHyreADU calculation

HyreADU calculation on 8,536 City of Los Angeles new-construction ADU permits with a declared floor area between 100 and 3,000 sq ft, issued 2020 to 2026-08-30. LADBS resource pi9x-tg5x, retrieved 2026-09-05. Floor area is the department’s field, not a HyreADU measurement.

The policy reading is available and worth stating carefully: a size cap set at 1,200 square feet does not merely constrain the largest units, it creates a cluster at 1,200.

The size-distribution study shows the same shape at 800 and at 750, and treats the two recodifications of the ADU statute since 2024 explicitly — § 65852.2 is stale and should not be cited.

Declared permit valuation, five jurisdictions

Declared permit valuation is the closest thing to a cost figure that exists in public permit data, and it is not a cost figure.

Declared valuation is the value an applicant declared to the building department, typically because fees are calculated from it.

The spread between jurisdictions is large enough that a statewide average would be meaningless, which is why we do not publish one.

JurisdictionMedian declaredp25p75p90n permitsClass
City of Los Angeles$40,000$20,000$81,000$125,0003,809HyreADU calculation
City and County of San Francisco$150,000$83,625$250,000$403,5001,314HyreADU calculation
City of Sacramento$133,105$85,000$195,313$241,150749HyreADU calculation
City of San José$98,971$71,819$131,648$167,433459HyreADU calculation
Marin County (unincorporated)$156,800$55,000$350,000$659,760277HyreADU calculation

HyreADU calculation on municipal permit harvests taken 29–30 August 2026, computed 2026-09-05. Owner-builder records are excluded. Issued-date windows differ by city and are stated in the ledger. Zero and missing valuations are dropped.

Within Los Angeles the split by ADU type is the more useful cut: garage conversions have a median declared valuation of $27,000 against $80,000 for everything else — a 2.96× difference on the same permit form, in the same city, in the same years.

Declared valuation is not construction cost; see the permit-valuation study for what it omits.

How much of California’s housing is now accessory

Statewide, ADUs went from 9.1% of HCD-reported housing permits in 2018 to 26.5% in 2024. Underneath that state average the jurisdictional spread is roughly ten to one.

The two share columns below answer different questions and are never mixed: one is a share of what a city has permitted, the other a share of what the state told it to plan for.

JurisdictionADU permits, cycle to dateAll units permittedADU share of permittedADU share of RHNA allocationClass
Long Beach2,5714,93152.1%9.7%HyreADU calculation
Unincorporated Los Angeles County3,96910,16439.1%4.4%HyreADU calculation
Los Angeles28,95177,29637.5%6.3%HyreADU calculation
Unincorporated San Diego County1,6176,17626.2%24.1%HyreADU calculation
San Diego6,96536,53319.1%6.5%HyreADU calculation
Oakland4052,53516.0%1.5%HyreADU calculation
San José1,0607,81913.6%1.7%HyreADU calculation
Sacramento1,28214,0249.1%2.8%HyreADU calculation
San Francisco4016,0866.6%0.5%HyreADU calculation
Fresno1883,4155.5%0.5%HyreADU calculation

HyreADU join of HCD APR Table A2 to the state’s 6th-cycle RHNA Progress Report, both retrieved 2026-09-05. Cycle start dates run from April 2021 to December 2023 depending on the region, so the two windows do not align exactly and the shares are approximations, labeled as such.

Statewide, 477,627 units of all types have been permitted against an allocation of 2,495,457 across 539 jurisdictions — 19.1%.

An allocation is a planning obligation, not a construction target, and no ADU on this page can be assigned to an income band because Table A2’s ADU rows carry no affordability field.

The production-vs-need study is explicit about that limit; it is the single most consequential error available on this topic.

Why there is no national ADU statistic on this page

What the federal instrument does

The Census Bureau’s Building Permits Survey classifies residential construction into four structure types: single-family houses, two-unit buildings, three- and four-unit buildings, and buildings with five or more units. Accessory is not among them, and no item on the form asks whether a unit is accessory to another.

The signal is then lost twice, in opposite directions. A garage or basement conversion is an alteration under Item 434, which records permits and valuation but carries no housing-unit count — that unit never enters the national units series at all.

A detached new-build ADU does enter it, but as a one-unit building, in the same cell as a four-bedroom spec house.

The errors do not cancel. Conversions are a pure undercount; detached new-builds are an unattributed overcount inside a category routinely used as a proxy for single-family production. The national-permit-data study sets out the mechanics in full.

What the size of the gap looks like

California is the only place the gap can be measured, because it is the only state with an independent ADU permit series. In 2025 HCD-reported single-family-detached plus ADU permits ran 9,145 units above the federal one-unit series for California; in 2018 they ran 925 units below it.

That is a swing of about ten thousand units in a period when California ADU permits went from 11,978 to 31,460, while the federal one-unit line for the state barely moved: 58,831 in 2018, 57,739 in 2025.

The closest thing to a national estimate is Freddie Mac’s July 2020 figure of 1.4 million properties whose MLS listing text matched accessory-unit phrases at some point since the late 1990s. Freddie Mac names both understatement and overstatement bias in its own write-up and makes no adjustment for demolition.

It is a count of properties, not of standing units, and the how-many-ADUs study treats it as the top of an evidence ladder rather than an answer.

A national ADU figure needs a change to the instrument, not a cleverer analysis of the output: an accessory flag on the permit record, plus a unit count on alteration permits that create a dwelling.

Every figure on this page, with its class

The audit table. 68 figures, each with its geography, its date, its provenance class and its source.

This is the list the one-third gate counts: 48 HyreADU calculations, 16 agency-published, 4 trade or survey.

If a number appears anywhere above and is not in this table, that is a defect and we would like to hear about it.

StatisticFigureGeographyDateClassSource
ADU building-permit units reported178,495California, 511 reporting jurisdictions2018–2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU certificates of occupancy reported102,356California, 511 reporting jurisdictions2018–2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permit units, 2025 alone32,126California, 511 reporting jurisdictions2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permit units, 2018 alone12,050California, 511 reporting jurisdictions2018Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU completions, 2025 alone22,630California, 511 reporting jurisdictions2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
Table A2 rows with UNIT_CAT = ADU281,321California, 511 reporting jurisdictions2018–2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
Jurisdictions reporting at least one ADU permit511California2018–2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
California 1-unit permit units, federal series57,739California2025Agency publishedCensus Building Permits Survey, annual 2025 release (14 May 2026)
California all-structure permit units, federal series103,856California2025Agency publishedCensus Building Permits Survey, annual 2025 release (14 May 2026)
6th-cycle RHNA allocation, all income bands2,495,457California, 539 jurisdictions6th cycleAgency publishedHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05
Units of all types permitted, cycle to date477,627California, 539 jurisdictions6th cycle to 2025Agency publishedHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05
Cumulative completions per permit57.3%California, 511 reporting jurisdictions2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Cumulative completions per permit, excluding four unusable reporters57.7%California, 511 reporting jurisdictions2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Same-year completions per permit, 202570.4%California, 511 reporting jurisdictions2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Same-year completions per permit, 201826.4%California, 511 reporting jurisdictions2018HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Growth in annual ADU permit units, 2018 to 20252.67×California, 511 reporting jurisdictions2018→2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Permit units double-counted by a naive APR-year sum35,237California, 511 reporting jurisdictions2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Share of a naive APR-year permit total that is double-counted16.5%California, 511 reporting jurisdictions2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
ADU share of all HCD-reported permits, 20189.1%California, 511 reporting jurisdictions2018HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
ADU share of all HCD-reported permits, 202426.5%California, 511 reporting jurisdictions2024HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
ADU share of all HCD-reported permits, 202526.1%California, 511 reporting jurisdictions2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Median permit-to-certificate lag among matched projects1 yearCalifornia, 511 reporting jurisdictions2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Matched projects finishing in the permit year29.4%California, 511 reporting jurisdictions2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Matched projects finishing within one year78.9%California, 511 reporting jurisdictions2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Matched projects finishing within two years93.9%California, 511 reporting jurisdictions2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
2018 permit cohort, observed completion rate after 7 years47.1%California, 511 reporting jurisdictions2018 cohortHyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
2022 permit cohort, observed completion rate62.4%California, 511 reporting jurisdictions2022 cohortHyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
HCD single-family-detached plus ADU permits over the federal 1-unit series+9,145 unitsCalifornia2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 against Census Building Permits Survey, annual 2025 release (14 May 2026) · national-permit-data study
Same comparison in 2018-925 unitsCalifornia2018HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 against Census Building Permits Survey, annual 2025 release (14 May 2026) · national-permit-data study
ADU permits in the analysis frame39,279City of Los Angeles2020–2026Agency publishedLADBS resource pi9x-tg5x, retrieved 2026-09-05
Census tracts with at least one ADU permit1,142City of Los Angeles2020–2026Agency publishedLADBS resource pi9x-tg5x, retrieved 2026-09-05
Share of city ADU permits in the San Fernando Valley53.8%City of Los Angeles2020–2026HyreADU calculationLADBS resource pi9x-tg5x, retrieved 2026-09-05 · geography study
Gini coefficient of ADU permits across tracts with at least one0.4731City of Los Angeles2020–2026HyreADU calculationLADBS resource pi9x-tg5x, retrieved 2026-09-05 · geography study
Share of permits in the top quartile of tracts57.3%City of Los Angeles2020–2026HyreADU calculationLADBS resource pi9x-tg5x, retrieved 2026-09-05 · geography study
Median permitted floor area, new detached ADU920 sq ftCity of Los Angeles2020–2026HyreADU calculationLADBS resource pi9x-tg5x, retrieved 2026-09-05 · size-distribution study
Interquartile range of permitted floor area670–1,194 sq ftCity of Los Angeles2020–2026HyreADU calculationLADBS resource pi9x-tg5x, retrieved 2026-09-05 · size-distribution study
Permits declaring exactly 1,200 sq ft635City of Los Angeles2020–2026HyreADU calculationLADBS resource pi9x-tg5x, retrieved 2026-09-05 · size-distribution study
Permits declaring 1,195–1,200 sq ft1,061City of Los Angeles2020–2026HyreADU calculationLADBS resource pi9x-tg5x, retrieved 2026-09-05 · size-distribution study
Share of new detached ADU permits at or under 750 sq ft32.5%City of Los Angeles2020–2026HyreADU calculationLADBS resource pi9x-tg5x, retrieved 2026-09-05 · size-distribution study
Share above 1,200 sq ft12.5%City of Los Angeles2020–2026HyreADU calculationLADBS resource pi9x-tg5x, retrieved 2026-09-05 · size-distribution study
Median days, application to permit issuance162 daysCity of Los Angeles2020–2026HyreADU calculationLADBS pi9x-tg5x · DataSF i98e-djp9 · Marin mkbn-caye, retrieved 2026-09-05 · permit-times study
Interquartile range, application to issuance79–301 daysCity of Los Angeles2020–2026HyreADU calculationLADBS pi9x-tg5x · DataSF i98e-djp9 · Marin mkbn-caye, retrieved 2026-09-05 · permit-times study
Median days, filed to issued445 daysCity and County of San Francisco2015–2026HyreADU calculationLADBS pi9x-tg5x · DataSF i98e-djp9 · Marin mkbn-caye, retrieved 2026-09-05 · permit-times study
Median days, received to issued175 daysMarin County (unincorporated)2018–2026HyreADU calculationLADBS pi9x-tg5x · DataSF i98e-djp9 · Marin mkbn-caye, retrieved 2026-09-05 · permit-times study
Median days, permit issuance to certificate of occupancy499 daysCity of Los Angeles2020–2026HyreADU calculationLADBS resource pi9x-tg5x, retrieved 2026-09-05 · construction-duration study
Same figure computed on finished permits only367 daysCity of Los Angeles2020–2026HyreADU calculationLADBS resource pi9x-tg5x, retrieved 2026-09-05 · construction-duration study
Share reaching a certificate within one year35%City of Los Angeles2020–2026HyreADU calculationLADBS resource pi9x-tg5x, retrieved 2026-09-05 · construction-duration study
Share reaching a certificate within two years65%City of Los Angeles2020–2026HyreADU calculationLADBS resource pi9x-tg5x, retrieved 2026-09-05 · construction-duration study
2020-issued ADU permits with no final, 6.2 years on15.3%City of Los Angeles2020 cohortHyreADU calculationLADBS resource pi9x-tg5x, retrieved 2026-09-05 · construction-duration study
Combined median of the two clocks661 daysCity of Los Angeles2020–2026HyreADU calculationLADBS resource pi9x-tg5x, retrieved 2026-09-05 · permit-times study + construction-duration study
Median declared permit valuation$40,000City of Los Angeles2017–2023 issuedHyreADU calculationMunicipal permit harvests, 29–30 August 2026, computed 2026-09-05 · permit-valuation study
Median declared permit valuation$150,000City and County of San Francisco2015–2026 issuedHyreADU calculationMunicipal permit harvests, 29–30 August 2026, computed 2026-09-05 · permit-valuation study
Median declared permit valuation$133,105City of Sacramento2018–2026 issuedHyreADU calculationMunicipal permit harvests, 29–30 August 2026, computed 2026-09-05 · permit-valuation study
Median declared permit valuation$98,971City of San José2008–2026 issuedHyreADU calculationMunicipal permit harvests, 29–30 August 2026, computed 2026-09-05 · permit-valuation study
Median declared permit valuation$156,800Marin County (unincorporated)2014–2026 issuedHyreADU calculationMunicipal permit harvests, 29–30 August 2026, computed 2026-09-05 · permit-valuation study
Garage-conversion median declared valuation$27,000City of Los Angeles2017–2023 issuedHyreADU calculationMunicipal permit harvests, 29–30 August 2026, computed 2026-09-05 · permit-valuation study
Non-garage median declared valuation$80,000City of Los Angeles2017–2023 issuedHyreADU calculationMunicipal permit harvests, 29–30 August 2026, computed 2026-09-05 · permit-valuation study
ADU share of cycle-to-date permitted housing, highest of ten52.1%Long Beach6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 · production-vs-need study
ADU share of cycle-to-date permitted housing37.5%City of Los Angeles6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 · production-vs-need study
ADU share of cycle-to-date permitted housing, lowest of ten5.5%Fresno6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 · production-vs-need study
Share of the statewide 6th-cycle allocation permitted so far19.1%California, 539 jurisdictions6th cycle to 2025Agency publishedHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05
Approximate ADU share of cycle-to-date units permitted statewide24.9%California2022–2025 against cycle to dateHyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 · production-vs-need study
Structure categories in the federal permit survey, none of them accessory4United States2026 methodologyAgency publishedCensus Building Permits Survey methodology
Housing units recorded when an ADU is made by conversion0United States2026 methodologyAgency publishedCensus BPS Item 434 carries no units field
Properties whose MLS text mentioned an accessory unit since the late 1990s1.4 millionUnited StatesJuly 2020Trade / survey estimateFreddie Mac, Economic & Housing Research Insight, July 2020
New California ADUs generating rental income51%California, 2018–19 owner surveyApr 2021Trade / survey estimateChapple, Ganetsos and Lopez, Center for Community Innovation, 22 April 2021 (Terner-reviewed)
New California ADUs housing a relative at no cost16%California, 2018–19 owner surveyApr 2021Trade / survey estimateChapple, Ganetsos and Lopez, Center for Community Innovation, 22 April 2021 (Terner-reviewed)
New California ADUs that are one-bedroom61%California, 2018–19 owner surveyApr 2021Trade / survey estimateChapple, Ganetsos and Lopez, Center for Community Innovation, 22 April 2021 (Terner-reviewed)

Class definitions: HyreADU calculation — HyreADU computed it from a primary file, method on the linked study. Agency published — an agency printed it. Trade / survey estimate — a named survey or industry estimate. All retrieval dates as stated; the HCD, LADBS, DataSF, Marin and RHNA extracts were all taken on 2026-09-05.

ADU figures we will not repeat

Four ADU claims circulate harder than any others in this category, and this page repeats none of them. Each is either unsourceable, or sourceable to something that does not say what it is quoted as saying.

  • A national ADU count, or a national "ADUs built last year" figure

    No federal statistical agency publishes one, and the instrument that would produce one does not collect the category.

    Any round national number you see is either Freddie Mac’s property count with its qualifications stripped off, or a Californian figure scaled by population — which assumes the rest of the country has California’s statute, and it does not. We publish the evidence ladder instead.

  • An "average ADU cost" for California or for the country

    Declared permit valuations in the five jurisdictions we hold have medians from $40,000 to $156,800 — a 3.9× spread — and declared valuation is not cost in any of them.

    Averaging across markets and across conversion versus new-build is how a brochure gets a round number. The honest artefact is a table with a class label on every row.

  • "ADUs take three to six months to build"

    On 39,278 Los Angeles permits, the censored-aware median from issuance to certificate of occupancy is 499 days, and only 35% reach a certificate inside a year.

    The three-to-six-month claim is roughly what you get by taking the median of the permits that have already finished (367 days) and then discounting further.

    It is wrong in a specific and predictable direction: it can only see the projects that ended.

  • A permit count read as a housing count

    178,495 permit units is not 178,495 homes. 102,356 certificates have been reported against them, the 2018 cohort’s observed completion rate after seven years is 47.1%, and 15.3% of the 2020 Los Angeles cohort has no final at all. Both numbers are real. They measure different things and we always print both.

Citing these figures

Journalists, planning staff and researchers are welcome to cite anything on this page. Where possible, link the study rather than the digest — the method, the sensitivity checks and the limitations live there, and a figure travels better with them attached.

Where a figure is labeled HyreADU calculation, attribute it to HyreADU and name the file: "HyreADU analysis of HCD Housing Element Annual Progress Report Table A2, retrieved 5 September 2026", or "HyreADU analysis of LADBS building permits (Socrata pi9x-tg5x)".

Where it is labeled Agency published, cite HCD or the Census Bureau directly; we are repeating them and we would rather you went to the table.

Where it is Trade / survey estimate, cite the named researchers — Chapple, Ganetsos and Lopez for the owner survey, Freddie Mac for the MLS estimate.

Corrections are published on the page with a dated note rather than edited in silently. If a figure here is wrong, or a source has moved, tell us at hello@hyreadu.com and we will say so in public.

Questions

How many ADUs are there in California?
Nobody publishes a stock count. What exists is a permitted flow: California jurisdictions reported 178,495 ADU building-permit units and 102,356 certificates of occupancy for 2018–2025 to HCD, deduplicated by tracking identifier across 511 jurisdictions. The completion figure is the better floor for "how many exist that were built in this period", and it is still a floor, because reporting is incomplete in both directions. Units built before 2018, and unpermitted units, are in neither number.
How many ADUs are there in the United States?
No federal statistical agency publishes a count, and the Census Building Permits Survey cannot produce one: it has four structure categories, none of them accessory, and an ADU created by conversion is recorded with no housing-unit count at all. The only national estimate with a published method is Freddie Mac’s July 2020 figure of 1.4 million properties whose MLS listing text matched accessory-unit phrases at some point since the late 1990s — not a count of units standing today, and carrying, by Freddie Mac’s own account, both understatement and overstatement bias. See the how-many-ADUs study.
What percentage of California housing is ADUs?
Of housing units permitted and reported to HCD, 26.1% in 2025 and 26.5% in 2024, up from 9.1% in 2018. That is a share of new production, not a share of the standing housing stock — the stock share is much smaller and is not measurable from these files. In individual cities the production share goes much higher: 52.1% of Long Beach’s cycle-to-date permitted housing and 37.5% of the City of Los Angeles’s.
How long does it take to get an ADU permit?
In the City of Los Angeles the median is 162 days from application to issuance (IQR 79–301, n = 27,188); in San Francisco 445 days from filed to issued; in unincorporated Marin 175 days from received to issued. None of these is the statutory 60-day clock, which under Gov. Code § 66317 runs from a completed application — and no published extract marks the completeness determination, so applicant delay and back-check cycles sit inside these medians.
How long does it take to build an ADU?
From permit issuance to certificate of occupancy in Los Angeles, the median is 499 days — about 16.4 months — on a Kaplan-Meier estimate that keeps the 14,306 unfinished permits in the calculation. Only 35% reach a certificate within a year and 65% within two. Count only the permits that already finished and you get 367 days, which is the number a builder’s own records would produce and which cannot see the projects that stalled. A detached new build runs longest (564 days); a conversion coded as alteration runs shortest (419 days).
How big is a typical ADU?
Among new detached ADU permits in Los Angeles the median declared floor area is 920 square feet, with an interquartile range of 670–1,194. The distribution is shaped by statute rather than by need: 635 permits declare exactly 1,200 square feet — the ceiling for a detached unit — 1,061 sit in the final five square feet below it, and only 12.5% go above. A separate cluster sits at or below 750 square feet (32.5% of permits), the threshold at or under which no impact fee may be charged.
What does an ADU cost?
This page does not answer that, and the distinction matters. What it publishes is declared permit valuation — the number an applicant gives a building department, usually for fee calculation. Medians run from $40,000 in Los Angeles to $156,800 in unincorporated Marin, and within Los Angeles from $27,000 for garage conversions to $80,000 for everything else. Declared valuation excludes design, utility connections, permit fees, financing and landscaping. Treat it as a lower bound on hard construction cost and nothing more.
Do most permitted ADUs actually get built?
A substantial minority do not, on any timescale a homeowner would recognize. Two independent instruments agree. In HCD’s file the 2018 permit cohort has an observed completion rate of 47.1% after seven years of follow-up. In Los Angeles’s own permit records, 15.3% of the ADU permits issued in 2020 have no certificate of occupancy and no permit final 6.2 years later. Neither figure is an abandonment rate: unmatched and unfinalled both include units that are standing, occupied, and simply never closed out on paper.
Which California city permits the most ADUs?
The City of Los Angeles, by a very wide margin: 49,556 permit units 2018–2025, 27.8% of the state total, with 29,529 completions reported. San Diego is second at 9,153, unincorporated Los Angeles County third at 5,657. Within Los Angeles the permits are themselves concentrated: 53.8% are in the San Fernando Valley, and the Gini coefficient across the 1,142 census tracts with at least one permit is 0.4731.
Why are so many of these statistics Californian?
Because California is the only state that collects them. Its Housing Element annual reporting requirement obliges every jurisdiction to report permits and certificates by unit category, and Table A2 has an explicit ADU value. No other state has an equivalent series, and the federal survey has no accessory category at all. That is a statement about the data, not about where ADUs are built — see ADU statistics outside California, which rests on national and non-Californian sources only.
How current are these figures, and when do they change?
Every extract on this page was retrieved on 2026-09-05. HCD’s Table A2 was last updated 4 September 2026; 2025 APRs were due 1 April 2026 and HCD does not treat a prior year as complete until 30 June, so the 2025 row will still move a little. The LADBS feed refreshes daily (rowsUpdatedAt 2026-08-31), DataSF as of 2026-09-04. We re-cut this page when HCD publishes a new annual file, and note the change here rather than editing figures silently.
Can I reuse these tables?
Yes. Cite HyreADU for anything labeled a HyreADU calculation and name the underlying file, cite the agency directly for anything labeled agency-published, and cite the named researchers for anything labeled a trade or survey estimate. Linking the study page rather than this digest is better practice, because the method and the limitations live there. Corrections: hello@hyreadu.com.

Written and audited by

HyreADU Research Desk

Primary-source research, data analysis and fact checking

We are a research desk, not a builder. We read the permit extract, the statute, the HCD return or the fee schedule ourselves, and publish each figure with its source and retrieval date.

Where a number cannot be traced to a primary source, we leave it out and say what we could not verify. Our store-based claims cover California only.

CA
the only state this desk will make store-based claims about
5
jurisdictions with extracted ADU permit evidence
735
CSLB-verified companies in the California store
0
national claims from a one-state store

How this desk works

  • Primary sources only. Permit counts come from the city or county that issued the permit. Production counts come from HCD’s Annual Progress Report. Rents come from HUD or the Census. We do not cite an article that cites a source; we download the source and compute the figure ourselves.
  • This is a California site. The company store is 734 California firms and one New Mexico firm. Permit evidence exists for five named jurisdictions: Los Angeles, San Francisco, Sacramento, San José and unincorporated Marin. A number from that store is titled to those places, never to the United States.
  • A permit is not a completion, and a license is not an ADU grade. California licenses no ADU classification. Being named on an ADU permit is evidence of engagement in that jurisdiction, not of quality, completion, or work anywhere else. Owner-builder permits are excluded from contractor counts.
  • Calculation is labeled as calculation. Figures we derive are never presented as something HCD, HUD, the Census or a city published. Terner Center research is cited as Terner’s, never restated as ours.
  • We do not design, permit or build ADUs, and we take no payment for placement, ranking or a favorable mention. Pages that look like rankings are not: they publish public-record counts and let the reader decide.
  • Nothing here is legal, tax or financial advice. Zoning, underwriting and appraisal practice vary by jurisdiction, lender and appraiser. The useful next step on a specific lot is the planning counter and a licensed professional.

Data as of HCD APR Table A2 retrieved 2026-09-05 (HCD last updated 4 September 2026); LADBS pi9x-tg5x retrieved 2026-09-05, feed rowsUpdatedAt 2026-08-31; DataSF i98e-djp9 data_as_of 2026-09-04; Marin mkbn-caye rows updated 2026-09-04; RHNA Progress Report retrieved 2026-09-05; Census BPS annual 2025 release 14 May 2026. Authorship on this site is organizational: the analysis belongs to the desk rather than to a named individual, and we do not publish credentials we do not hold.

Our editorial policy sets out how we source, date and correct what we publish.

Sources & retrieval dates

  1. California HCD — Housing Element Annual Progress Report, Table A2 (APR data by jurisdiction and year) , 922,102 rows, 281,321 with UNIT_CAT = ADU. Permits and completions counted as unique (jurisdiction, project identifier, date) events and assigned to the date on the permit or certificate. HCD last updated 4 September 2026. Retrieved 2026-09-05.
  2. California HCD — Table A2 download (tablea2.csv) , The file itself, so the analysis can be reproduced rather than taken on trust. Retrieved 2026-09-05.
  3. California HCD — RHNA Progress Report, 6th cycle , Allocations and cycle-to-date permitted units for 539 jurisdictions. Statewide allocation 2,495,457; 477,627 units permitted to date. Retrieved 2026-09-05.
  4. LADBS — Building and Safety Building Permits Issued from 2020 to Present (Socrata pi9x-tg5x) , 409,619 rows downloaded. Carries the department’s ADU flag, submitted and issue dates, certificate-of-occupancy date, declared valuation and floor area on the same row. Source of the size, geography, approval-time and construction-time figures for Los Angeles. Retrieved 2026-09-05.
  5. DataSF — Building Permits (DBI permit tracking extract, i98e-djp9) , 3,268 rows carrying DBI’s own ADU flag; 1,713 unique issued permits with both a filed and an issued date. data_as_of 2026-09-04. Retrieved 2026-09-05.
  6. Marin County — Building Permit (mkbn-caye) , Unincorporated Marin only. 482 ADU permits kept after dropping trade-only rows, with received and issued dates. Retrieved 2026-09-05.
  7. U.S. Census Bureau — Building Permits Survey, annual history by state , California column, units. Census Building Permits Survey, annual 2025 release (14 May 2026). Four structure categories, none of them accessory; Item 434 alterations carry no unit count. Retrieved 2026-09-05.
  8. U.S. Census Bureau — Building Permits Survey methodology , The source of the four-category classification quoted on this page, and of the Item 434 definition. Retrieved 2026-09-05.
  9. Chapple, Ganetsos and Lopez — “Reaching California’s ADU Potential”, Center for Community Innovation (Terner-reviewed) , 51% of new ADUs generating rental income, 16% housing a relative at no cost, 61% one-bedroom. A survey of 2018–19 California ADU owners, 22 April 2021. Cited as theirs throughout. Retrieved 2026-09-05.
  10. Freddie Mac — Economic & Housing Research Insight, July 2020 , “A total of 1.4 million distinct single-family properties with accessory dwellings were identified in our final population,” from roughly 600 million MLS transactions since the late 1990s. Properties, not units; two-sided bias named by Freddie Mac. Retrieved 2026-09-05.
  11. California Government Code § 66314 — ADU development standards , The 1,200 sq ft ceiling on a detached ADU that the Los Angeles floor-area distribution clusters on. The ADU provisions were recodified out of § 65852.2; citing the old section number is a live error in this field. Retrieved 2026-09-05.
  12. California Government Code § 66311.5 — impact fees on accessory dwelling units , No impact fee may be imposed on an ADU of 750 sq ft or less. The second statutory threshold the size distribution clusters on. Retrieved 2026-09-05.
  13. California Government Code § 66317 — ADU application processing , The 60-day period to act on a completed ADU application, referenced where this page discusses the approval clock. Retrieved 2026-09-05.

A statistic is not a project

Every figure on this page describes a distribution that has already happened somewhere else. Your parcel has a zone, a slope, a panel and a plan checker. Start from the rules that apply to it.

Read the studies All statistics digests

HyreADU does not design, permit or build accessory dwelling units. These statistics are informational and are not legal, tax, financial or construction advice.

HCD figures describe California; Los Angeles figures describe the City of Los Angeles; neither is a national statistic and neither is scaled into one on this page. Declared permit valuation is not construction cost.

A permit is not a completion, and an unmatched permit is not an abandoned project. Survey figures are attributed to the researchers who produced them and are never restated as measurements of every ADU in California.

Statutory citations reflect the ADU provisions as recodified; verify current section numbers before relying on them.