HyreADU

Statistics

ADU housing supply statistics

35 of 63 figures are HyreADU calculations. What share of California’s housing accessory dwelling units actually deliver — with permitted, completed and allocated kept strictly apart.

Updated September 2026 · Data as of HCD RHNA Progress Report retrieved 2026-09-05 (last updated 2026-09-04T15:44:00Z); HCD APR Table A2 retrieved 2026-09-05; Census BPS annual 2025 release 14 May 2026

Written by HyreADU Research Desk Primary-source research and data analysis

Audited by HyreADU Research Desk Provenance and figure-ledger audit

26.12% of California’s permitted housing in 2025 was an ADU From 9.12% in 2018. Denominator is every unit category HCD collects. HyreADU calculation on APR Table A2, retrieved 2026-09-05.
52.1% of Long Beach’s cycle-to-date permitted housing is ADUs 2,571 ADU permits against 4,931 units of all types. Against Fresno’s 5.5% — a spread of about 9 to 1.
0 ADU permits that can be assigned to an income category RHNA is allocated by affordability band. The ADU rows in Table A2 carry no affordability field, so every share on this page is against a total, never against a very-low or low-income allocation.

The short version

Accessory dwelling units are now roughly a quarter of everything California permits. They went from 9.12% of all housing units permitted and reported to HCD in 2018 to 26.52% in 2024 and 26.12% in 2025.

In 2025 the state permitted 0.89 ADU units for every single-family-detached unit, against 0.26 in 2018.

In some cities they are not a supplement to housing production but a large fraction of it. Joining HCD’s permit counts to the state’s own 6th-cycle RHNA progress file, ADUs are 52.1% of every housing unit Long Beach has permitted in its planning period, 39.1% in unincorporated Los Angeles County and 37.5% in the City of Los Angeles.

In others they are marginal: 5.5% in Fresno, 6.6% in San Francisco. The spread across these ten jurisdictions is about 9 to 1.

Measured against the allocation rather than against production, all of them are small. Long Beach’s ADU permits equal 9.7% of its total eight-year allocation, Los Angeles’s 6.3%, San Francisco’s 0.5%. Those two shares answer different questions and this page never mixes them.

Only completions are supply. Against 178,495 permit units, jurisdictions have reported 102,356 certificates of occupancy — 57.3% — and the 2018 permit cohort’s observed completion rate is 47.1% after seven years.

And no ADU on this page can be assigned to an income band. RHNA is allocated by affordability; the ADU rows in Table A2 carry no affordability field. Every share here is against a total.

Anyone telling you what share of California’s low-income obligation ADUs have met is not reading this file. 35 of 63 figures below are HyreADU calculations (35 hyreadu calculation, 25 agency published, 3 trade / survey estimate).

Three words this page keeps apart, and one it cannot use

Housing-supply arithmetic goes wrong almost entirely through vocabulary. These four constraints govern every figure below.

  • Permitted is not completed

    A permit is a permission. Against 178,495 ADU permit units, California jurisdictions have reported 102,356 certificates of occupancy for 2018–2025 — a cumulative 57.3%. Only the second number is housing that exists. Where this page discusses supply delivered, it uses completions; where it discusses production, it uses permits, and it says which.

  • An allocation is not a target a city builds

    The Regional Housing Needs Allocation assigns each jurisdiction a number of units it must plan for over an eight-year cycle.

    It is a zoning and land-capacity obligation, not a construction quota, and a jurisdiction that permits less than its allocation has not necessarily failed at anything a court would recognize.

    Statewide, 477,627 units of all types have been permitted against an allocation of 2,495,457 — 19.1%.

  • A low ADU share is not a failing

    ADUs are one housing type among several. San Francisco’s ADU share of permitted housing is low partly because San Francisco permits a great deal of multi-family housing, which is a good thing rather than a bad one. This page is not a league table and no jurisdiction on it is being graded.

  • No ADU here can be assigned to an income band — and this is the important one

    RHNA is allocated across four affordability categories: 642,151 very low, 384,113 low, 419,977 moderate and 1,049,216 above moderate. Table A2’s ADU rows, as this desk holds them, carry no affordability field.

    So every share on this page is against a jurisdiction’s total allocation or total production, never against its very-low or low-income allocation. Saying otherwise would be the single most consequential error available on this topic, and it is one that circulates.

The statewide picture: how much of California’s housing is accessory

One table, eight years, three columns that are often conflated. Permits are permissions issued. Completions are certificates reported. The share column is the ADU fraction of every housing unit permitted in the state that year, across every unit category HCD collects.

Accessory dwelling units as a share of all California housing permits, 2018–20250.05.611.216.922.528.120182019202020212022202320242025Per cent of all permitted unitsYearADU share of HCD-reported permit unitsHyreADU calculation on HCD APR Table A2. Denominator is every unit category HCD collects. Same values as the statewide table.
ADUs as a share of all California housing units permitted and reported to HCD, 2018–2025. HyreADU calculation on HCD APR Table A2, retrieved 2026-09-05.
YearADU permit unitsADU completionsAll housing permits reportedADU share of permitsClass
201812,0503,186131,2799.12%Agency published counts · HyreADU calculation share
201912,9925,957124,73010.31%Agency published counts · HyreADU calculation share
202013,1168,065115,35611.22%Agency published counts · HyreADU calculation share
202121,16310,147137,20215.19%Agency published counts · HyreADU calculation share
202226,22414,043139,69118.49%Agency published counts · HyreADU calculation share
202329,30917,676137,29221.05%Agency published counts · HyreADU calculation share
202431,51520,652116,93026.52%Agency published counts · HyreADU calculation share
202532,12622,630120,45526.12%Agency published counts · HyreADU calculation share

HCD APR Table A2, retrieved 2026-09-05. Permit and completion counts are agency-published; the share column is ours. Totals for the window: 178,495 permit units and 102,356 completions.

The denominator matters. This is the ADU share of all permitted housing, including multi-family.

Restricted to low-density housing the share is far higher — in 2025 California permitted 0.89 ADU units for every single-family-detached unit, against 0.26 in 2018, and both ends of that ratio moved: SFD permits fell from 45,928 to 35,424 while ADU permits rose from 11,978 to 31,460.

Permitted against completed: what has actually been delivered

The gap between the two lines is the whole reason a permit count overstates supply. It is also narrowing, which is the genuinely encouraging finding in this data: the same-year ratio rose from 26.4% in 2018 to 70.4% in 2025 as the pipeline matured and the earlier cohorts began completing.

Permitted against completed: California ADU units by year06,81113,62120,43227,24334,05420182019202020212022202320242025UnitsYearADU permitsADU completionsOnly the completion line is housing supply. HCD APR Table A2, deduplicated by tracking identifier.
California ADU permits and reported completions by year, 2018–2025. HCD APR Table A2, retrieved 2026-09-05.
MeasureFigureWhat it means for supplyClass
ADU permit units, 2018–2025178,495Permissions. Not supply until built.Agency published
ADU completions, 2018–2025102,356The best available floor on delivered ADU supply in the window.Agency published
Cumulative completions per permit57.3%A production-accounting ratio, not a project completion rate.HyreADU calculation
Same-year ratio, 201826.4%Early cycle: permits far ahead of a young pipeline.HyreADU calculation
Same-year ratio, 202570.4%Mature cycle: completions from earlier cohorts arriving.HyreADU calculation
Median permit-to-certificate lag, matched projects1 year78.9% within one year, 93.9% within two.HyreADU calculation
2018 cohort observed completion rate, 7 years on47.1%A floor, not a ceiling. Unmatched is not unbuilt.HyreADU calculation
2018–2023 permit units with no matching completion40.9%Still building, abandoned, unreported, or identifier changed.HyreADU calculation

HCD APR Table A2, retrieved 2026-09-05. Counts agency-published; ratios and cohort rates are HyreADU calculations. Method on the permits-vs-completions study.

Even 102,356 completions is a floor rather than a measurement. Reporting is incomplete in both directions, four jurisdictions never populate the completion field at all, and unpermitted ADUs — which are real housing supply — are in none of these numbers by construction. See the unpermitted-ADU page.

Ten jurisdictions, two denominators

The two share columns answer different questions and are the single easiest thing to conflate on this topic. ADU share of permitted asks: of the housing this city has actually permitted in its cycle, how much is accessory?

ADU share of allocation asks: how much of the planning obligation the state handed it do those ADUs represent? A city can be high on the first and low on the second, and most are.

ADU share of cycle-to-date permitted housing, ten California jurisdictions0Long Beach52.1%Unincorporated Los Angeles County39.1%Los Angeles37.5%Unincorporated San Diego County26.2%San Diego19.1%Oakland16.0%San José13.6%Sacramento9.1%San Francisco6.6%Fresno5.5%HyreADU join of HCD APR Table A2 to the 6th-cycle RHNA Progress Report. Same numbers as thejurisdiction table.
ADU share of cycle-to-date permitted housing, ten California jurisdictions. HyreADU join of HCD APR Table A2 to the 6th-cycle RHNA Progress Report, both retrieved 2026-09-05.
JurisdictionADU permitsADU completionsAll units permittedRHNA allocationADU share of permittedADU share of allocationClass
Long Beach2,5712,2844,93126,50252.1%9.7%Agency published counts · HyreADU calculation shares
Unincorporated Los Angeles County3,9692,36910,16489,30239.1%4.4%Agency published counts · HyreADU calculation shares
Los Angeles28,95119,51477,296456,64337.5%6.3%Agency published counts · HyreADU calculation shares
Unincorporated San Diego County1,6171,3026,1766,70026.2%24.1%Agency published counts · HyreADU calculation shares
San Diego6,9652,34036,533108,03619.1%6.5%Agency published counts · HyreADU calculation shares
Oakland4054362,53526,25116.0%1.5%Agency published counts · HyreADU calculation shares
San José1,0607257,81962,20013.6%1.7%Agency published counts · HyreADU calculation shares
Sacramento1,28286614,02445,5809.1%2.8%Agency published counts · HyreADU calculation shares
San Francisco4014676,08682,0696.6%0.5%Agency published counts · HyreADU calculation shares
Fresno188573,41536,8665.5%0.5%Agency published counts · HyreADU calculation shares

HyreADU join, retrieved 2026-09-05. Cycle start dates run from April 2021 to December 2023 depending on the region, so the ADU permit window and the RHNA cycle window do not align exactly; the shares are approximations and are labeled as such throughout.

Unincorporated county rows cover unincorporated territory only and do not nest inside the city rows.

Unincorporated San Diego County is the outlier on the second column: ADU permits equal 24.1% of its allocation, against 0.5% in San Francisco. That is mostly a statement about the size of the allocations — 6,700 units against 82,069 — rather than about ADU performance. Read the denominators before reading the ranking.

The affordability question this data cannot answer

California’s 6th-cycle RHNA allocation by income band25.7%Very low income — 642,151 units15.4%Low income — 384,113 units16.8%Moderate income — 419,977 units42.0%Above moderate income — 1,049,216 unitsHCD RHNA Progress Report, 6th cycle. Printed to show the denominators an ADU share cannot be computed against.
California’s 6th-cycle RHNA allocation by income band — the denominators an ADU share cannot be computed against. HCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05.

California’s 6th-cycle allocation is not one number but four. Of 2,495,457 units, 642,151 are allocated as very low income, 384,113 as low, 419,977 as moderate and 1,049,216 as above moderate. Progress against those bands is wildly uneven: 338,529 above-moderate units have been permitted against 38,748 very-low-income units.

Not one of the ADUs on this page can be placed in any of those four buckets from the data we hold. The Table A2 rows for ADUs carry no affordability field, so the arithmetic simply cannot be done. That is why every share on this page is against a total.

It matters because the most consequential policy claim in this area is precisely the one the data cannot support: that ADUs are meeting lower-income need.

There is a real argument for it — ADUs are small, they are often let below market, and Terner/CCI’s owner survey found 16 per cent of new units housing a relative at no cost — and there is a real argument against it, since an unsubsidised backyard unit in an expensive market can let at market and be counted, in RHNA terms, as above-moderate.

Both arguments are legitimate. Neither can be settled from this file, and a page that claimed to settle it would be inventing the field it needed.

What can be said honestly: ADU permits over 2022–2025 equal 4.8% of California’s entire 6th-cycle allocation, and ADU completions over 2018–2025 equal 4.1% of it. Those are shares of a total, computed across mismatched windows, and both are labeled as approximations. They are the ceiling of what this data supports.

What kind of supply is it?

Not all of it enters the rental market

Chapple, Ganetsos and Lopez, surveying California owners of ADUs permitted in 2018–19, found 51 per cent generating rental income, 16 per cent providing no-cost housing to a relative and 8 per cent used as short-term rentals. Those shares are theirs, they describe a specific cohort, and they do not sum to a hundred.

The relevance to supply accounting is direct. A unit housing an adult child rent-free is genuine housing — it removes a household from the rental market as surely as a lease does — but it is not rental supply and will never appear in a vacancy or rent statistic.

A unit let as a short-term rental is not housing supply at all in the sense a housing element means.

We use these shares to say what the production numbers cannot mean.

We do not multiply the completion count by 0.51 and present the result as "real" ADU supply: a 2021 survey of a 2018–19 cohort is not a 2026 occupancy census, and treating it as one would be exactly the kind of arithmetic this site exists not to do. See the who-lives-in-ADUs page and the rental-income study.

And a lot of it is federally invisible

The Census Building Permits Survey is the series the country uses to discuss housing production, and it cannot see an accessory dwelling unit. Four structure categories, none accessory; a conversion ADU is an alteration that records no housing units at all.

The consequence for supply accounting is not academic. In 2025, California’s own single-family-detached plus ADU permit total ran 9,145 units above the federal one-unit series for the state; in 2018 it ran 925 units below. Anyone tracking Californian housing production from the federal series alone has been missing a growing wedge of it.

And that is California, where a state series exists to reveal the gap. In the other forty-nine states the same wedge is there and there is nothing to measure it against. See the national-permit-data study.

Two different invisibilities, in opposite directions: units the federal series never counts, and units it counts without knowing what they are.

Every figure on this page, with its class

63 figures with geography, date, provenance class and source. 35 HyreADU calculations, 25 agency-published, 3 trade or survey.

StatisticFigureGeographyDateClassSource
6th-cycle RHNA allocation, all income bands2,495,457California, 539 jurisdictions6th cycleAgency publishedHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05
Very-low-income allocation642,151California, 539 jurisdictions6th cycleAgency publishedHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05
Low-income allocation384,113California, 539 jurisdictions6th cycleAgency publishedHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05
Moderate-income allocation419,977California, 539 jurisdictions6th cycleAgency publishedHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05
Above-moderate-income allocation1,049,216California, 539 jurisdictions6th cycleAgency publishedHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05
Units of all types permitted, cycle to date477,627California, 539 jurisdictions6th cycle to 2025Agency publishedHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05
Cycle-to-date permits counted as above-moderate338,529California, 539 jurisdictions6th cycle to 2025Agency publishedHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05
Cycle-to-date permits counted as very low income38,748California, 539 jurisdictions6th cycle to 2025Agency publishedHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05
Share of the statewide allocation permitted so far19.1%California, 539 jurisdictions6th cycle to 2025Agency publishedHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05
ADU building-permit units178,495California, 511 reporting jurisdictions2018–2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU certificates of occupancy102,356California, 511 reporting jurisdictions2018–2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permit units in the 2022–2025 window119,174California, 511 reporting jurisdictions2022–2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
All housing permit units reported to HCD, 2025120,455California, 511 reporting jurisdictions2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
Single-family-detached permit units, 202535,424California, 511 reporting jurisdictions2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
California 1-unit permit units, federal series, 202557,739California2025Agency publishedU.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026)
ADU permits, cycle to date — Long Beach2,571Long Beach6th cycle to 2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permits, cycle to date — Unincorporated Los Angeles County3,969Unincorporated Los Angeles County6th cycle to 2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permits, cycle to date — Los Angeles28,951Los Angeles6th cycle to 2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permits, cycle to date — Unincorporated San Diego County1,617Unincorporated San Diego County6th cycle to 2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permits, cycle to date — San Diego6,965San Diego6th cycle to 2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permits, cycle to date — Oakland405Oakland6th cycle to 2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permits, cycle to date — San José1,060San José6th cycle to 2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permits, cycle to date — Sacramento1,282Sacramento6th cycle to 2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permits, cycle to date — San Francisco401San Francisco6th cycle to 2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU permits, cycle to date — Fresno188Fresno6th cycle to 2025Agency publishedHCD Housing Element APR, Table A2, retrieved 2026-09-05
ADU share of all HCD-reported permit units, 20189.12%California, 511 reporting jurisdictions2018HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
ADU share of all HCD-reported permit units, 202426.52%California, 511 reporting jurisdictions2024HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
ADU share of all HCD-reported permit units, 202526.12%California, 511 reporting jurisdictions2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Approximate ADU share of cycle-to-date permitted units24.9%California, 539 jurisdictions2022–2025 against cycle to dateHyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU permits as a share of the statewide 6th-cycle allocation4.8%California, 539 jurisdictions2022–2025 against 6th cycleHyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
Cumulative ADU completions per permit57.3%California, 511 reporting jurisdictions2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
ADU completions as a share of the statewide allocation4.1%California, 539 jurisdictions2018–2025 against 6th cycleHyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU share of cycle-to-date permitted units — Long Beach52.1%Long Beach6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU share of cycle-to-date permitted units — Unincorporated Los Angeles County39.1%Unincorporated Los Angeles County6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU share of cycle-to-date permitted units — Los Angeles37.5%Los Angeles6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU share of cycle-to-date permitted units — Unincorporated San Diego County26.2%Unincorporated San Diego County6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU share of cycle-to-date permitted units — San Diego19.1%San Diego6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU share of cycle-to-date permitted units — Oakland16.0%Oakland6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU share of cycle-to-date permitted units — San José13.6%San José6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU share of cycle-to-date permitted units — Sacramento9.1%Sacramento6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU share of cycle-to-date permitted units — San Francisco6.6%San Francisco6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU share of cycle-to-date permitted units — Fresno5.5%Fresno6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU permits as a share of allocation — Long Beach9.7%Long Beach6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU permits as a share of allocation — Unincorporated Los Angeles County4.4%Unincorporated Los Angeles County6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU permits as a share of allocation — Los Angeles6.3%Los Angeles6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU permits as a share of allocation — Unincorporated San Diego County24.1%Unincorporated San Diego County6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU permits as a share of allocation — San Diego6.5%San Diego6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU permits as a share of allocation — Oakland1.5%Oakland6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU permits as a share of allocation — San José1.7%San José6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU permits as a share of allocation — Sacramento2.8%Sacramento6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU permits as a share of allocation — San Francisco0.5%San Francisco6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU permits as a share of allocation — Fresno0.5%Fresno6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
Ratio of highest to lowest ADU production share among the ten9.5×Long Beach against Fresno6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU completions in the ten jurisdictions, cycle to date30,360Ten California jurisdictions6th cycle to 2025HyreADU calculationHCD RHNA Progress Report, 6th cycle, retrieved 2026-09-05 joined to HCD Housing Element APR, Table A2, retrieved 2026-09-05 · production-vs-need study
ADU permits per single-family-detached permit, 20250.89×California, 511 reporting jurisdictions2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
Same ratio in 20180.26×California, 511 reporting jurisdictions2018HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
ADU permits we can assign to an income band0California, 511 reporting jurisdictions2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 — Table A2 ADU rows carry no affordability field
Matched projects completing within two years of permit93.9%California, 511 reporting jurisdictions2018–2025HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
2018 permit cohort observed completion rate after seven years47.1%California, 511 reporting jurisdictions2018 cohortHyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
2018–2023 permit units with no matching completion row40.9%California, 511 reporting jurisdictions2018–2023HyreADU calculationHCD Housing Element APR, Table A2, retrieved 2026-09-05 · permits-vs-completions study
New ADUs generating rental income51%California, 2018–19 owner surveyApr 2021Trade / survey estimateChapple, Ganetsos and Lopez, Center for Community Innovation, 22 April 2021 (Terner-reviewed)
New ADUs providing no-cost housing to a relative16%California, 2018–19 owner surveyApr 2021Trade / survey estimateChapple, Ganetsos and Lopez, Center for Community Innovation, 22 April 2021 (Terner-reviewed)
New ADUs used as short-term rentals8%California, 2018–19 owner surveyApr 2021Trade / survey estimateChapple, Ganetsos and Lopez, Center for Community Innovation, 22 April 2021 (Terner-reviewed)

HyreADU calculation — computed by HyreADU, method on the production-vs-need study or the permits-vs-completions study. Agency published — printed by HCD or the Census Bureau. Trade / survey estimate — Chapple, Ganetsos and Lopez’s owner survey, cited as theirs. RHNA and APR extracts retrieved 2026-09-05.

Supply claims we will not repeat

  • “ADUs have met X% of California’s affordable housing need”

    This is the claim the data most clearly cannot support, and it circulates anyway. RHNA need is allocated across four income bands; the ADU rows in Table A2 carry no affordability field.

    There is no arithmetic that gets from this file to an income-band share. Any figure of that shape has either substituted a total for a band or borrowed an assumption from somewhere it was not measured.

  • A permit count presented as housing supply

    178,495 permit units is a stock of permissions. 102,356 certificates is the floor on delivered supply, and the 2018 cohort’s observed completion rate after seven years is 47.1%. Using the permit number in a supply sentence overstates delivered housing by a factor of roughly 1.74.

  • A jurisdiction ranking built on the ADU production share

    5.5% in Fresno and 52.1% in Long Beach is not a difference in commitment. It reflects lot geometry, existing stock, multi-family pipeline, land values and what else the city happens to be permitting.

    San Francisco’s low ADU share partly reflects the fact that it permits a great deal of apartment housing, which is what a housing element wants it to do.

  • Terner’s occupancy shares applied as a haircut to production counts

    The 51/16/8 split describes 2018–19 permit-cohort owners surveyed in 2021. Multiplying a 2025 completion count by 0.51 to get "real rental supply" treats a survey as a census, applies it across seven years of a changing market, and produces a number with no error bar and no owner behind it.

    We cite the shares to explain what production figures cannot mean, and we do not do the multiplication.

Citing these figures

Cite the production-vs-need study rather than this digest where you can. The join method, the window mismatch between RHNA cycles and calendar years, and the affordability limitation live there in full.

For anything labeled HyreADU calculation, attribute it as "HyreADU analysis joining the California HCD Housing Element Annual Progress Report (Table A2) to the 6th-cycle RHNA Progress Report, both retrieved 5 September 2026". For anything labeled Agency published, cite HCD directly. For the occupancy shares, cite Chapple, Ganetsos and Lopez.

If you are writing about ADUs and housing need and you take one thing from this page, take the sentence about income bands. It is the difference between a defensible claim and one that will not survive the first person who opens the file.

Questions

What share of California’s new housing is ADUs?
26.12% of all housing units permitted and reported to HCD in 2025, and 26.52% in 2024, up from 9.12% in 2018. The denominator is every unit category HCD collects, including multi-family. This is a share of new production, not of the standing housing stock.
Which California city relies on ADUs most for its housing production?
Of the ten jurisdictions in this analysis, Long Beach: 52.1% of the housing it has permitted so far in its 6th cycle is accessory dwelling units, 2,571 ADU permits against 4,931 units of all types. Unincorporated Los Angeles County is second at 39.1% and the City of Los Angeles third at 37.5%. Fresno is lowest at 5.5%.
Are ADUs helping California meet its RHNA housing targets?
They are contributing measurably to the total and the contribution cannot be attributed to any income band. ADU permits over 2022–2025 equal 4.8% of the 2,495,457-unit statewide 6th-cycle allocation, and ADU completions over 2018–2025 equal 4.1% of it. Statewide, 19.1% of the allocation has been permitted so far, across all housing types. Both ADU figures are approximations because the ADU windows and the RHNA cycle windows do not align.
Do ADUs count as affordable housing under RHNA?
A jurisdiction reports units against income categories, and an ADU can in principle be reported in any of them depending on the affordability the jurisdiction assigns. What we cannot do is tell you the distribution: the ADU rows in the Table A2 file this desk holds carry no affordability field. So there is no honest answer to "what share of California’s low-income RHNA have ADUs met" available from this data, and any published figure of that shape should be checked hard against its source.
How many ADUs has California actually built?
Jurisdictions reported 102,356 ADU certificates of occupancy for 2018–2025. That is the best available floor for delivered supply in the window and it is genuinely a floor: reporting is incomplete, four jurisdictions never populate the completion field, units built before 2018 are not in it, and unpermitted units are excluded by construction. Against 178,495 permit units, the cumulative completions-per-permit ratio is 57.3%.
Are ADUs replacing single-family homes in California’s housing mix?
The composition has shifted from both ends. Single-family-detached permits fell from 45,928 units in 2018 to 35,424 in 2025 while ADU permits rose from 11,978 to 31,460, taking the ratio from 0.26 to 0.89 ADU units per detached house. Whether one is causing the other is not something this data can establish — the same period contains an interest-rate cycle and a construction-cost shock.
Are all these ADUs adding to the rental market?
No, and the survey evidence is explicit about it. Chapple, Ganetsos and Lopez found 51% of new California ADUs generating rental income, 16% providing no-cost housing to a relative and 8% used as short-term rentals. A unit housing a relative rent-free is real housing but not rental supply; a short-term rental is not housing supply in the sense a housing element means. Those shares are Terner/CCI’s, describe a 2018–19 cohort, and we cite them to bound what the production numbers can mean rather than to discount the counts.
Why does the federal housing data not show this?
Because the Census Building Permits Survey has no accessory category. A conversion ADU is an alteration recording zero housing units; a detached ADU lands in the single-family cell. In 2025 California’s own single-family-detached plus ADU total ran 9,145 units above the federal one-unit series for California, having run 925 below it in 2018. Anyone tracking California housing production from the federal series alone is missing a growing wedge.
Does this include unpermitted ADUs?
No. Every figure here is derived from permit and certificate records, so a unit that was never permitted is invisible by construction. Unpermitted ADUs are real housing and there is reason to believe there are many of them, but they are not measurable from these files and nothing on this page attempts to estimate them.
How current is this and when does it change?
Both HCD files were retrieved 2026-09-05 and the RHNA Progress Report was last updated 2026-09-04T15:44:00Z. 2025 annual progress reports were due 1 April 2026 and HCD does not treat a prior year as complete until 30 June, so the most recent year continues to firm up. We re-cut the page against each new HCD publication.

Written and audited by

HyreADU Research Desk

Primary-source research, data analysis and fact checking

We are a research desk, not a builder. We read the permit extract, the statute, the HCD return or the fee schedule ourselves, and publish each figure with its source and retrieval date.

Where a number cannot be traced to a primary source, we leave it out and say what we could not verify. Our store-based claims cover California only.

CA
the only state this desk will make store-based claims about
5
jurisdictions with extracted ADU permit evidence
735
CSLB-verified companies in the California store
0
national claims from a one-state store

How this desk works

  • Primary sources only. Permit counts come from the city or county that issued the permit. Production counts come from HCD’s Annual Progress Report. Rents come from HUD or the Census. We do not cite an article that cites a source; we download the source and compute the figure ourselves.
  • This is a California site. The company store is 734 California firms and one New Mexico firm. Permit evidence exists for five named jurisdictions: Los Angeles, San Francisco, Sacramento, San José and unincorporated Marin. A number from that store is titled to those places, never to the United States.
  • A permit is not a completion, and a license is not an ADU grade. California licenses no ADU classification. Being named on an ADU permit is evidence of engagement in that jurisdiction, not of quality, completion, or work anywhere else. Owner-builder permits are excluded from contractor counts.
  • Calculation is labeled as calculation. Figures we derive are never presented as something HCD, HUD, the Census or a city published. Terner Center research is cited as Terner’s, never restated as ours.
  • We do not design, permit or build ADUs, and we take no payment for placement, ranking or a favorable mention. Pages that look like rankings are not: they publish public-record counts and let the reader decide.
  • Nothing here is legal, tax or financial advice. Zoning, underwriting and appraisal practice vary by jurisdiction, lender and appraiser. The useful next step on a specific lot is the planning counter and a licensed professional.

Data as of HCD RHNA Progress Report retrieved 2026-09-05 (last updated 2026-09-04T15:44:00Z); HCD APR Table A2 retrieved 2026-09-05; Census BPS annual 2025 release 14 May 2026. Authorship on this site is organizational: the analysis belongs to the desk rather than to a named individual, and we do not publish credentials we do not hold.

Our editorial policy sets out how we source, date and correct what we publish.

Sources & retrieval dates

  1. California HCD — RHNA Progress Report, 6th cycle , Allocations by income band and cycle-to-date permitted units for 539 jurisdictions. Statewide allocation 2,495,457 units; 477,627 permitted to date (19.1%). Last updated 2026-09-04T15:44:00Z. Retrieved 2026-09-05.
  2. California HCD — RHNA Progress Report CSV download , The file itself, so the join can be reproduced. Retrieved 2026-09-05.
  3. California HCD — Housing Element Annual Progress Report, Table A2 , 281,321 rows coded UNIT_CAT = ADU across 511 jurisdictions. The source of every ADU permit and completion count on this page. Carries no affordability field on the ADU rows. Retrieved 2026-09-05.
  4. California HCD — APR data dashboard , HCD’s own visualisation of the same data, useful as a cross-check. Retrieved 2026-09-05.
  5. U.S. Census Bureau — Building Permits Survey, annual history by state , California column, units. U.S. Census Bureau, Building Permits Survey, annual 2025 release (14 May 2026). Used only for the federal-comparison figures. Retrieved 2026-09-05.
  6. Chapple, Ganetsos and Lopez — Center for Community Innovation ADU owner survey (Terner-reviewed) , 51% of new ADUs generating rental income, 16% housing a relative at no cost, 8% short-term rental. A survey of 2018–19 California ADU owners, 22 April 2021. Cited as theirs and never applied as a haircut to production counts. Retrieved 2026-09-05.

Permitted, completed, allocated — three different numbers

Most bad ADU housing-supply arithmetic comes from swapping one for another. The study sets out which is which, and what none of them can tell you about affordability.

Read the study All statistics digests

HyreADU does not design, permit or build accessory dwelling units. These statistics are informational and are not legal, planning or policy advice. Every figure describes California.

A permit is not a completed dwelling; an allocation is a planning obligation, not a construction target; and no ADU figure on this page can be assigned to an RHNA income band, because the underlying rows carry no affordability field.

Jurisdiction shares are not a ranking and a low ADU share is not a failing. Occupancy shares are attributed to the researchers who produced them and are never applied arithmetically to production counts.